Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LAccepted-Finance | L1 | Accepted-Finance Eligible | |
| 2 | L2₹12.9 L+₹2,968.27 (0.23%)Accepted-Finance | L2 | Accepted-Finance Eligible |
Tender Value
₹13 L
EMD Value
₹13,000
Closing Date
7 Feb 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer(B.Pt), Needamangalam
Block Development Office, Needamangalam
Construction of Function Drama Stage (Vizha Medai) Stage Building in Serumangalam Sri Poongaliamman Kovil Near at Kanoor Annavasal Panchayat at Needamangalam Block in Tiruvarur District .
2024_RDTN_416607_1
4181/2023/a2
Open Tender
Civil Works
Item Rate
90 days
Block Development Office, Needamangalam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13,000
8 Feb 2024
1 Feb 2024
7 Feb 2024
1 Feb 2024
7 Feb 2024
1 Feb 2024
Amount
1) Construction of Function Drama Stag (Vizha Medai) Stage Building in Serumangalam Sri Poongaliamman Kovil Near at Kanoor Annavasal Panchayat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. A) Below Basement
. B) Above Basement
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete I) Below Basement
RCC SLABS,
Sunshade
II) LINTELS, RCC SLABS, BEAMS, TEE or ELL BEAMS,
Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. I) upto Basement
.II) superstructure Ground level
Weathering course concrete (Brick jelly lime concrete) using 20mm Broken brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing, laying, and finishing etc., complete
Finishing the top of the roof with one course of Machine Pressed Tiles of size 23x23x2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar,red oxide, etc., complete complying with standard specification
Plastering with cement mortar 1:3 mix to10mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Ceramic tiles flooring laying with new ceramic tiles of size 300x300x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadooing with glazed tiles of size 150x150x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Fabrication and supply of mild Steel Doors and Windows of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
i. Steel Door D1
Jolly
window
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete.
Exterior Emulsion two coats with best approved Plastic Emulsion including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over new iron works using ready mixed enamel paint including cost and all labour charges etc complete.
Supplying and fixing P.V.C rainwater down fall pipe of 100mm dia with necessary shoes, bends,& clamps etc.,
Provision for elecrition Charges
Provision for shelf aregements Charges
Provision for Rain Water Harvesting Arrangements Charges
Provision for soakpit Arragement
Provision for stainless steel Hand rails
Provision for Name Borad Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Shanbagavali P
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .