| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.6 LAccepted-AOC | ₹67.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹69.4 L+₹1.8 L (2.64%)Rejected-AOC | ₹69.4 L+₹1.8 L (2.64%) | L2 | Rejected-AOC L2 |
| 3 | L3₹73.9 L+₹6.3 L (9.34%)Rejected-AOC | ₹73.9 L+₹6.3 L (9.34%) | L3 | Rejected-AOC L3 |
| 4 | L4₹78.6 L+₹11.1 L (16.4%)Rejected-AOC 15 3 625017 | MADURAI | TAMIL NADU | 625017 | ₹78.6 L+₹11.1 L (16.4%) | L4 | Rejected-AOC L4 |
| 5 | Rejected-Technical 28 1 16 | - | - | Rejected-Technical Not Furnished |
| Sl No | Description | Qty | Unit | K.M.Samy Constructions L3 | PRAVIN CONSTRUCTION L2 | BALAJI CONSTRUCTION L4 | P T SUBRAMANIAN L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 9 | M3 | 232 ₹2,088 | 218 ₹1,962 | 246.69 ₹2,220.21 | 212 ₹1,908 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 1 | M3 | 5,117 ₹5,117 | 4,585 ₹4,585 Lowest | 5,438.77 ₹5,438.77 | 4,670 ₹4,670 |
| 3.00 | Supplying, erecting shuttering with necessary sipports for plinth beam with all cross bracing etc., complete (RCC column footing plinth, beam and lintel sides) For Drain & culvert slap | 34 | M2 | 633 ₹21,522 | 594 ₹20,196 | 672.7 ₹22,871.8 | 578 ₹19,652 Lowest |
| 4.00 | Plain Cement Concrete 1:1.5:3 (one cement, one and half fine aggregates and three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 6 | M3 | 6,582 ₹39,492 | 6,171 ₹37,026 | 6,995.53 ₹41,973.18 | 6,006 ₹36,036 Lowest |
| 5.00 | Providing Granular surface base to the required surface using murram, Granular soil of size varying from 4mm to75mm including cost of material and cost of labour for stacking, spreading and consolidating layer by layer (Each layer not exceeding 100mm) including hire charges of Roller etc,complete as per the direction of Departmental officers. | 360 | M3 | 861 ₹3,09,960 | 807 ₹2,90,520 | 915.59 ₹3,29,612.4 | 786 ₹2,82,960 Lowest |
| 6.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying inuniformlayers with paver in sub base/base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 360 | M3 | 1,896 ₹6,82,560 | 1,778 ₹6,40,080 | 2,015.48 ₹7,25,572.8 | 1,730 ₹6,22,800 Lowest |
| 7.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Slab or Beam) | 57 | M2 | 949 ₹54,093 | 890 ₹50,730 | 1,009.04 ₹57,515.28 | 866 ₹49,362 Lowest |
| 8.00 | Reinforced Cement concrete 1:1.5:3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 469 | M3 | 7,771 ₹36,44,599 | 7,275 ₹34,11,975 | 8,258.79 ₹38,73,372.51 | 7,090 ₹33,25,210 Lowest |
| 9.00 | Manufacturing and fixing in position RCC precast slab in C.C. 1:1.5:3, using 20 mm HBGS machine crushed jelly of following thickness, excluding cost of reinforcement grill but including moulding, finishing, curing and fixing in position etc. Complete. | 8 | M2 | 1,163 ₹9,304 | 1,091 ₹8,728 | 1,236.26 ₹9,890.08 | 1,061 ₹8,488 Lowest |
| 10.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 16,360 | Kg | 76 ₹12,43,360 | 72 ₹11,77,920 | 81.13 ₹13,27,286.8 | 70 ₹11,45,200 Lowest |
Tender Value
₹92.5 L
EMD Value
₹92,485
Closing Date
6 Jul 2026, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai , Thallakulam , Madurai
Providing Cement Concrete Road at Onion Market Block E1 - E2, Block E3 - E4, Block E5 - E6, Block E7 - E8, Block E9 and SWD Covering Slab in Ward No 33.
2026_MAWS_682717_1
E3 / EST. 252 / 25-26
Open Tender
Civil Works
Item Rate
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹92,485
17 Aug 2026
24 Jun 2026
6 Jul 2026
24 Jun 2026
6 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 9 | M3 | - | - |
| 2 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 1 | M3 | - | - |
| 3 | Supplying, erecting shuttering with necessary sipports for plinth beam with all cross bracing etc., complete (RCC column footing plinth, beam and lintel sides) For Drain & culvert slap | 34 | M2 | - | - |
| 4 | Plain Cement Concrete 1:1.5:3 (one cement, one and half fine aggregates and three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 6 | M3 | - | - |
| 5 | Providing Granular surface base to the required surface using murram, Granular soil of size varying from 4mm to75mm including cost of material and cost of labour for stacking, spreading and consolidating layer by layer (Each layer not exceeding 100mm) including hire charges of Roller etc,complete as per the direction of Departmental officers. | 360 | M3 | - | - |
| 6 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying inuniformlayers with paver in sub base/base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 360 | M3 | - | - |
| 7 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Slab or Beam) | 57 | M2 | - | - |
| 8 | Reinforced Cement concrete 1:1.5:3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 469 | M3 | - | - |
| 9 | Manufacturing and fixing in position RCC precast slab in C.C. 1:1.5:3, using 20 mm HBGS machine crushed jelly of following thickness, excluding cost of reinforcement grill but including moulding, finishing, curing and fixing in position etc. Complete. | 8 | M2 | - | - |
| 10 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 16,360 | Kg | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
252.pdf
Tender Documents • 1.98 MB
BOQ_820690.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .