Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC | ₹1.4 L Quoted ₹1.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 LRejected-AOC | ₹1.6 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | JEFI ENTERPRISES L2 | KEERTHANA ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for lifting counterweight box to the required level. Assembling of belt drum stand with necessary supports. Decoupling the gear coupling, removal of skirt board rubbers and clamps from the conveyor head and tail ends for the free movement and reassembling the same. Uncoiling the belt and laying the belt about 580meters by using chain block & pull lift. Clampings the belt on conveyor bottom side 2 sets and top side 2 sets. Making preliminary arrangements for providing 1st, 2nd, 3nd & 4th belt joint and assisting the belt joint works and other allied works. Trial running the conveyor to check the movement of counterweight, belt sway and carrying the belt tracking work. Cutting and removing the wornout belt from the conveyor and devoluted to stores and allied works | 1 | Operation | 1,55,000 ₹1,82,900 | 1,50,000 ₹1,77,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹1,600
Closing Date
17 Mar 2026, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ECHP-I- Replacement of 580 mtrs. Length worn out belt by a second hand belt of 1400mm width belt in Conveyor-19
2026_EB_669573_1
CE/TTPS/SE/MI/217/2025-2026
Open Tender
Miscellaneous Works
Works
5 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,600
29 Jul 2026
3 Mar 2026
18 Mar 2026
3 Mar 2026
17 Mar 2026
3 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for lifting counterweight box to the required level. Assembling of belt drum stand with necessary supports. Decoupling the gear coupling, removal of skirt board rubbers and clamps from the conveyor head and tail ends for the free movement and reassembling the same. Uncoiling the belt and laying the belt about 580meters by using chain block & pull lift. Clampings the belt on conveyor bottom side 2 sets and top side 2 sets. Making preliminary arrangements for providing 1st, 2nd, 3nd & 4th belt joint and assisting the belt joint works and other allied works. Trial running the conveyor to check the movement of counterweight, belt sway and carrying the belt tracking work. Cutting and removing the wornout belt from the conveyor and devoluted to stores and allied works | 1 | Operation | 55 | ₹55 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_804636.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].