| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹36.2 LAccepted-AOC | L-1 | Accepted-AOC Being L-1 | |
| 2 | L-2₹36.3 L+₹8,410 (0.23%)Rejected-Finance 0 0 465691 | RAJGARH | MADHYA PRADESH | 465691 | L-2 | Rejected-Finance Being L-2 | |
| 3 | L-3₹37.2 L+₹1.0 L (2.81%)Rejected-Finance | L-3 | Rejected-Finance Being L-3 | |
| 4 | L-4₹40.0 L+₹3.9 L (10.7%)Rejected-Finance ROOM NO 608 BLDG NO 06 R B T CO OP HSG SOC NEW CHIKUWADI MANKHURD W MUMBAI 400043 | MUMBAI SUBURBAN | MAHARASHTRA | 400043 | L-4 | Rejected-Finance Being L-4 | |
| 5 | L-5₹43.5 L+₹7.3 L (20.2%)Rejected-Finance AZAD ROLLING SHUTTERS AND CONSTRUCTION MOHAN CINEMA ROAD OPPOSITE J P MARKET KOTA RAJASTHAN 324006 | KOTA | RAJASTHAN | 324006 | L-5 | Rejected-Finance Being L-5 |
| Sl No | Description | Qty | Unit | AZAD ROLLING SHUTTER AND CONSTRUCTION L4 | laxmi engineering L3 | M/S. BALAJI CONSTRUCTION L2 | R K Construction L1 | B.L. WAGHMARE BABA & CO L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00SERVICING OF ROLLING SHUTTERS: Servicing of the following type of rolling shutters of all sizes up to maximum size of 6m x 7m including scaffolding by dismantling for over-hauling of individual parts for repairing and refixing after repairs i.e. top hood shaft cage, shaft case, shaft brackets, springs, main curtain with lathe or mid bar type grills, wicket gate, side guides bottom rails, gear units, bearings, electric motors, starters and thoroughly cleaning all the components, adjusting the tensioning springs, if required overhauling or repairing shaft and gear units, re-conditioning end clips, re-aligning curtain ends, reconditioning dents if any, on the surface bottom rail and side guides, repairing the starter, inspecting, taking out and replacing the damaged or defective components (replacement of parts at extra rate is shown under item no. 2 below), ensuring proper locking arrangements from both side and out side including all welding, drilling, straightening, grinding, scaffolding, ladders, tools, tackles, with all consumables, such as lubricants, kerosene, grease etc. and all hardwares such as nuts, bolts, rivets, screws, washers, keys, etc. making good any damages to civil works, cleaning, oiling, greasing and demonstrating proper functioning of the shutters after each service such as nuts, bolts, rivets, screws, washers, keys, etc. and necessary scaffolding etc. all complete as per direction of Engineer-in-charge at site. Note: 1) The measurement for sevicing rolling shutters will be as per structural openings only. Hood, Guides etc. will not be measured separately. 2) Measurement will be done once only for entire contract period. | ||||||||
| 1.10 | Electrically Operated with lathes or grilled curtain, Mechanical Gear Operated and Pull & Push Type rolling shutters etc. i.e. all types of Rolling Shutters. | 800 | SqM | 650 ₹5,20,000 | 270 ₹2,16,000 | 449 ₹3,59,200 | 250 ₹2,00,000 Lowest | 600 ₹4,80,000 |
| 2.00PROVIDING, SUPPLYING AND REPLACING PARTS OF ROLLING SHUTTERS: Providing, Supplying and replacing in position wherever required the following parts or spares after removing the damaged old part carefully including all labour, taxes, duties, scaffolding, transport, welding, drilling, grinding, tools, tackles etc. and with applying one coat of primer wherever required, including transporting the dismantled M.S. scrap in and depositing to Trombay stores as directed by the Engineer at site. | ||||||||
| 2.01 | Providing & fixing G.I. Lathes of sections 75mm wide & 18 guage thick | 40 | RM | 400 ₹16,000 | 275 ₹11,000 | 150 ₹6,000 Lowest | 300 ₹12,000 | 250 ₹10,000 |
| 2.02 | Providing & fixing G.I. Bottom Rails (Pressed type 10 gauge thick with locking arrangement, handles, etc., in both ends and sides). | 20 | RM | 1,800 ₹36,000 | 1,252 ₹25,040 | 320 ₹6,400 Lowest | 1,200 ₹24,000 | 600 ₹12,000 |
| 2.03 | Providing, supplying, fabricating and assembling Shaft Asembly for Rolling Shutters using Heavy M.S. Pipes, springs & ring pully complete including erection. | 30 | RM | 3,000 ₹90,000 | 4,890 ₹1,46,700 | 820 ₹24,600 Lowest | 1,700 ₹51,000 | 3,000 ₹90,000 |
| 2.04 | Providing, supplying, fabricating and fixing M.S. / G.I. Hood Cover with 0.90 mm thick M.S. / G.I. sheet with supports for rolling shutters complete including erection | 20 | RM | 2,000 ₹40,000 | 1,928 ₹38,560 | 850 ₹17,000 Lowest | 1,200 ₹24,000 | 1,000 ₹20,000 |
| 2.05 | Providing, supplying and fixing M.S. Guide Channals with supports for existing rolling shutters complete including erection. | 20 | RM | 1,500 ₹30,000 | 860 ₹17,200 | 250 ₹5,000 Lowest | 950 ₹19,000 | 1,500 ₹30,000 |
| 2.06 | Providing & fixing Gear Warms | 4 | Each | 4,500 ₹18,000 | 3,400 ₹13,600 | 700 ₹2,800 Lowest | 4,000 ₹16,000 | 4,000 ₹16,000 |
| 2.07 | Providing, supplying and fixing 250 mm dia (10") Gear Wheel to existing rolling shutters complete including erection. | 8 | Each | 4,500 ₹36,000 | 5,569 ₹44,552 | 980 ₹7,840 Lowest | 2,000 ₹16,000 | 3,000 ₹24,000 |
Tender Value
₹43.8 L
EMD Value
₹1.0 L
Closing Date
3 Jun 2025, 3:00 pmClosed
CE, CSS
CSS, ESG, BARC, Trombay, Mumbai 400085
Repairing, Servicing and Annual Maintenance of Existing Steel Rolling Shutters, Awnings including Misc. minor Civil and PH Works at BARC Hospital, Anushaktinagar, Mumbai. Year- 2025-2026.
2025_BARC_860853_1
BARC/CSS/ET/8/2025-2026 DATE 20/05/2025
Open Tender
Civil Works
Item Rate
365 days
BARC Hospital, Anushaktinagar, Mumbai
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.0 L
26 Aug 2025
20 May 2025
6 Jun 2025
23 May 2025
3 Jun 2025
23 May 2025
Amount
SERVICING OF ROLLING SHUTTERS: Servicing of the following type of rolling shutters of all sizes up to maximum size of 6m x 7m including scaffolding by dismantling for over-hauling of individual parts for repairing and refixing after repairs i.e. top hood shaft cage, shaft case, shaft brackets, springs, main curtain with lathe or mid bar type grills, wicket gate, side guides bottom rails, gear units, bearings, electric motors, starters and thoroughly cleaning all the components, adjusting the tensioning springs, if required overhauling or repairing shaft and gear units, re-conditioning end clips, re-aligning curtain ends, reconditioning dents if any, on the surface bottom rail and side guides, repairing the starter, inspecting, taking out and replacing the damaged or defective components (replacement of parts at extra rate is shown under item no. 2 below), ensuring proper locking arrangements from both side and out side including all welding, drilling, straightening, grinding, scaffolding, ladders, tools, tackles, with all consumables, such as lubricants, kerosene, grease etc. and all hardwares such as nuts, bolts, rivets, screws, washers, keys, etc. making good any damages to civil works, cleaning, oiling, greasing and demonstrating proper functioning of the shutters after each service such as nuts, bolts, rivets, screws, washers, keys, etc. and necessary scaffolding etc. all complete as per direction of Engineer-in-charge at site. Note: 1) The measurement for sevicing rolling shutters will be as per structural openings only. Hood, Guides etc. will not be measured separately. 2) Measurement will be done once only for entire contract period.
Electrically Operated with lathes or grilled curtain, Mechanical Gear Operated and Pull & Push Type rolling shutters etc. i.e. all types of Rolling Shutters.
PROVIDING, SUPPLYING AND REPLACING PARTS OF ROLLING SHUTTERS: Providing, Supplying and replacing in position wherever required the following parts or spares after removing the damaged old part carefully including all labour, taxes, duties, scaffolding, transport, welding, drilling, grinding, tools, tackles etc. and with applying one coat of primer wherever required, including transporting the dismantled M.S. scrap in and depositing to Trombay stores as directed by the Engineer at site.
Providing & fixing G.I. Lathes of sections 75mm wide & 18 guage thick
Providing & fixing G.I. Bottom Rails (Pressed type 10 gauge thick with locking arrangement, handles, etc., in both ends and sides).
Providing, supplying, fabricating and assembling Shaft Asembly for Rolling Shutters using Heavy M.S. Pipes, springs & ring pully complete including erection.
Providing, supplying, fabricating and fixing M.S. / G.I. Hood Cover with 0.90 mm thick M.S. / G.I. sheet with supports for rolling shutters complete including erection
Providing, supplying and fixing M.S. Guide Channals with supports for existing rolling shutters complete including erection.
Providing & fixing Gear Warms
Providing, supplying and fixing 250 mm dia (10") Gear Wheel to existing rolling shutters complete including erection.
Providing, fixing by welding M.S. Handles for Rolling shutters
Providing, supplying and fixing springs in rolling shutter shaft including necessary bolt & nuts complete including erection.For rolling shutters above 5.00 metres height
Providing, supplying and fixing Dead Locks in rolling shutters necessary bolt & nuts complete including erection.
Providing, supplying and fixing Ball Bearing to existing rolling shutters complete including erection.
Providing, supplying and fixing Gear Box complete set with gear wheel,warm, handle etc full assembly complete including erection.
Providing, supplying and fixing Side Brackets for Rolling Shutters Complete including erection.
SUPPLYING AND FIXING ROLLING SHUTTERS: Supplying and fixing Rolling shutters of approved make as per ISI standards made out of required size of MS lathes 18 gauge interlocked together throughout entire length and jointed together at the end by end locks mounted on specially designed pipes shaft with brackets, side guides and arrangements for inside & outside locking with push and pull operation complete including the cost of providing and fixing necessary springs of required size and M. S top cover of required thickness for rolling shutters as directed by the Engineer-in-charge. Note: The measurement for rolling shutters will be as per structural openings only. Note : Hood, Guides etc. will not be measured separately.
Rolling shutters PULL & PUSH Type including top hood 0.90 mm thick
Rolling shutters GEAR OPERATED with handles including top hood 0.90 mm thick.
MOTORIZED ARRANGEMENT OF ROLLING SHUTTERS: Extra over the cost of rolling shutters for providing and fixing motorized arrangements (with remote & manual operation) including designing & providing control panels, limit switches, required wiring and cables from panel to motor and required size of shaft etc. of approved make all as per standard specifications including commisioning and testing complete as directed by the Engineer-in- charge. Note : Only power supply point will be provided.
For rolling shutters up to 15.00 sq.m opening area.
For rolling shutters above 15.00 Sq.m and up to 30.00 sq.m opening area.
GRILLED ROLLING SHUTTER: Extra for providing grilled rolling shutter manufactured out of 8 mm dia MS Bar instead of lathes as per specifications, design approved by the Engineer-in-charge complete
DISMANTLING DOORS, WINDOWS: Dismantling doors, windows, rolling shutter and clear storey openings (steel / wood) shutter including chowkhats, architraves, holdfasts etc. complete and stacking within 100 m lead (full windows) of area 3.00 Sq.M and below
REMOVING EXISTING ROLLING SHUTTERS: Removing existing damaged rolling shutter and transporting the same to srap yard / Trombay Village Stores in truck or tempo. The rates are inclusive loading unloading complete all as directed.
Dismantling steel work in single sections including dismantling and stacking within 100 m lead In R.S Joists, Angles etc.
Providing STRUCTURAL STEEL WORK USING ANGLES, CHANNELS, JOISTS AND OTHER SECTIONS, welded and / or bolted in built up sections for trusses , structural steel floors, frame works, monorails and other structures including supplying, cutting, welding, fabricating, hoisting, fixing in position, applying a priming coat of approved steel primer etc. complete all as per specifications, drawings and as directed by the Project Engineer. Up to and including 300mm Joists, 350mm channels, and below sections Using materials of confirming to IS:2062 only. All test reports to be provided along with the supply of the materials. Note: 1) Structural steel required for the work shall not be supplied by the Department and the contractor has to procure the same confirming to IS:2062. 2) Welding weights, connections, bolts and nuts shall not be measured for payment, but the cost of which shall be deemed to have been included in the rate. 3) All holes will be made by drilling only. Gas cutting of holes will not be permitted. 4) The contractor shall supply documentary evidence of purchase of steel, Test certificate from approved manufacturers.
HOLLOW METAL FLUSH STEEL DOORS: Providing, supplying and fixing hollow metal flush steel doors 40 mm thick of approved make consisting of door frame and shutters and all hardware fittings, frame made out of 14g thick G.I sheets and shutters made of 16g thick sheets, hollow portion filled with puff, including necessary stiffners in shutters and frame, vision panel of specified size with 4 mm glass and clip on pressed steel frame for vision panels, fixing 4 nos heavy duty stainless steel 304 grade ball bearing hinges, mortise / dead lock of approved make, a pair of 200 mm long stainless steel handles, 250 mm long stailless steel tower bolt, etc. frame hollow portion filled with PCC 1:2:4, necessary hold fast embedded in concrete, fixing in concrete with anchor fastners. finished with Polyurethane painting of approved colour complete all as per drawings and specifications and as directed by the Engineer-in-charge.
PERIODIC GENERAL SERVICE OF AWNINGS including checking of the Awnings, oiling, greasing, maintaining proper functioning of gear box, locks, knobs, front channel, brackets, Fabric Washing etc. complete as directed by Engineer-in-Charge.
WATER JET CLEANING OF AWNINGS WITH REQUIRED PRESSURED WATER JET and with the help of portable pressure jet developing machine & power cable of sufficient length supplied by the contractor. Power supply for the cleaning will be as per Schedule-A and as available at site.
SUPPLYING & FIXING FITTINGS / FIXTURES OF AWNINGS with suitable screws, nut-bolts, clips, Poder Coated attachments & accessories of Approved Brand etc. as and when required for proper functioning of the Awning including testing as directed by Engineering-in-Charge.
6" Awning Folding Arm
9" Awning Folding Arm
12" Awning Folding Arm
12" Awning Front Channel in Aluminium
15" Awning Front Channel in Aluminium
Front Channel Jointer
Front Channel Cap
Awning Gear Box Small
Awning Side Plate Big
Awning Side Plate Cap
Awning Wall Clamp Heavy
Awning C Clamp
Awning Fastner
Awning Support Compensator
10" Awning Square Pipe Standard
18" Awning Square Pipe Standard
Awning Square Pipe Cap
10" Awning Round Pipe Zinc Plated (60mmID 63mmOD)
18" Awning Round Pipe Zinc Plated (60mmID 63mmOD)
4" Awning Handle
6" Awning Handle
Awning Branded Fabrics Ferrari High Density FR Fabrics
Lead charges for lead exceeding 3 km but not exceeding 4 km by mechanical transport includinmg loading, unloading, stacking, levelling etc. Note: The rates in respect of Item are applicable for NET Quantities arrived at after making deduction for voids @ 30% from corresponding TRUCK Measurement). Note: Trasporting of debries at disposal ground, disposing, stacking, leveling & statutery charges if any will be responsibility of the Contractor and no extra charges shall be paid for the same.
Debris Beyond 3 km but upto and including 4 km
CARRYING OUT MANUAL MISC. FITTER / CARPENTRY / PLUMBING / CIVIL / MASONRY JOBS like minor repairs, fixing fitting and fixtures etc. as and when required and as directed by the Engineer-in-charge Note: 1. Labours shall bring necessary carpentary / plumbing tools, minimum materials such as washher, taflon tape, rawlpludge, screws, clips etc. 2) Payment shall be made as per the Log book duly approved by the Enginner in charge. 3) Contrator shall arrange necessary Police Verification Certificate for the workers engaged for thess work. 4) The contractor shall deploy one skilled, semiskilled or unskilled person for each job for 8 1/2 hours per day with 30 minutes of break, in General (Ist / IInd) or on Round the clock shift whenever necessary as per the discretion of the Engineer-in-Charge during the contract period.
SKILLED FITTER / CARPENTERY/PLUMBING/MASONRY JOB / WORKS with valid Police Verification Certificate for entire contract period.
SEMI-SKILLED FITTER / CARPENTERY/PLUMBING/MASONRY JOB / WORKS with valid Police Verification Certificate for entire contract period.
Carrying out Civil Engineering works like surveying & leveling, checking of formwork fabrication, reinforcement fabrication as per drawings, witnessing sample retrieval & testing for various construction materials, ensuring concrete ingredient ratio at batching plant and pouring of appropriate grade of concrete in plain and reinforced concrete works, ensuring proper mixing of approved ingredients & waterproofing admixtures for mortars and brickwork, plaster, flooring & waterproofing works and other civil & PH works including supervision of construction safety as per BARC specifications & relevant documentation, compiling, binding and preparation of tender documents & Agreements overall as directed by Engineer-in-Charge. Note : (1) Each Job shall be carried out by one qualified Degree holder Civil Engineer with 2 (Two) years experience or Diploma holder with 5 (Five) years experience (Licentiate in Civil/Construction Engineering / Technology) conducted by Board of Technical Examinations / University / Autonomous Govt. / Govt. recognized recognized Polytechnic/ Institute. (2) Deployment: The contractor shall deploy one Engineer for each job for minimum 26 working days per month for minimum 8 ½ hours per day with 30 minutes of break, in General (Ist / IInd) or on Round the clock shift including Saturdays, Sundays & holidays whenever necessary as per the discretion of the Engineer-in-Charge during the contract period. In case of emergency works like continuous pouring of concrete or shutdown/maintainance work, the Engineer will have to stay longer occasionally as per the instruction of the Engineer in-charge. No additional payment will be made on this account. (3) Period of work: The contractor shall carry out number of Jobs per month as per requirement at site for the period mentioned in NIT. (4) Mode of measurement : Measurement will be per job basis. A single job shall be carried out by deploying one Engineer exclusively for the particular job. (5) Engineer should be engaged after scrutiny by EIC of CSS, ESG, BARC and approved by Competent authority and the deployed Engineer will report to BARC Engineer/ EIC. (6) The minimum notice period before change of engineer is 1 (one) month; failing which a compensation, for not providing technical support, of Rs. 1,915/- per day of shortfall in notice period will be levied on the contractor.
SYNTHETIC ENAMEL PAINT: Providing and Painting two coats of Synthetic Enamel Paint on steel surfaces of approved brand and manufacture to give an even shade over a primer coat including preparation of the surfaces, scaffolding complete as per specifications and as directed by the Engineer-in-charge.
Providing and Painting with Epoxy PU paint using 2 coats of (120 Micron dry film thickness) Epoxy PU high build coating as finishing coat over a priming coat of EPILUX-13 High Build primer of 50 micron thickness over steel surfaces at all locations prepared and applied as per manufacturer' specifications including preparation of surface by cleaning with wire brush and rubbing, scraping , applying sand paper , making free of Rust, dust, dirt etc. filling the holes, joint, cracks if any using epoxy putty complete. all as per manufacturers technical data and as directed at site to achieve minimum overall dry Film thickness of 170 micron (50 Micron primer Coat + 120 micron finishing Coat). On STEEL surfaces
Providing and fixing double tubular scaffolding system using H frames with cup lock type on the exterior side upto seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and as approved by the Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purposes. Note : The payment shall be made once irrespective of duration of scaffolding.
M/S. BALAJI CONSTRUCTION (BID ID -3224206)
laxmi engineering (BID ID -3224777)
AZAD ROLLING SHUTTER AND CONSTRUCTION (BID ID -3223561)
B.L. WAGHMARE BABA & CO (BID ID -3222067)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .