| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.8 LAccepted-AOC RZ 212F D BLOCK RAJ NAGAR PART II PALAM COLONY NEW DELHI 110077 | SOUTH WEST | DELHI | 110077 | L1 | Accepted-AOC Accepted being L1 | |
| 2 | L2₹39.0 L+₹2.3 L (6.39%)Rejected-Finance A 3 257 JANAKPURI NEW DELHI 110058 | WEST DELHI | DELHI | 110058 | L2 | Rejected-Finance Rejected not being lowest | |
| 3 | L3₹44.2 L+₹7.5 L (20.6%)Rejected-Finance HOUSE NO 142 GALI NO 07 PREM VIHAR NANGLI SAKRAWATI NAJAFGARH NEW DELHI 110043 | NEW DELHI | NAJAFGARH | DELHI | 110043 | L3 | Rejected-Finance Rejected not being lowest | |
| 4 | L4₹52.0 L+₹15.4 L (42.1%)Rejected-Finance | L4 | Rejected-Finance Rejected not being lowest | |
| 5 | L5₹52.4 L+₹15.7 L (43.0%)Rejected-Finance RZ 40 PALAM VIHAR DWARKA SECTOR 6 NEW DELHI 75 | NEW DELHI | DELHI | 75 | L5 | Rejected-Finance Rejected not being lowest |
| Sl No | Description | Qty | Unit | MV Engineers And Contractors L1 | BUSINESS TEK INDIA L5 | GILL ENGINEERS L4 | M/S ADHIKARI CONSTRUCTION CO. L2 | S K ENGINEERS AND CONTRACTOR L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Preventive maintenance of microprocessor based online UPS of capacity 120 KVA of 3 Nos of Make: vertiv / emerson Model liebert APM comprising of suitable Nos of power moduls with IGBT based rectifier to achive input THDI<6% and input power factor of greater than 0.98 at 100% loading. True online double conversion(VF) as per (IEC 62040-3) UPS using PWM IGBT technology 3 phase input and 3 phase 400 v output UPS System along with Isolation transformers of 150 KVA and Disrtubution LT Panell / Parallel operation of the UPS along with 12V ,40Nos 150 AH Battery Bank , IOT Based Monitoring Unit and Preventive maintenance consisting of the following scheduled list of activities for keeps the UPS in good working order to prevent failures and complete all as specified and directed by Engr-in-charge. | 11 | Each Job for set of 3 UPS/Twice in a month | 1,01,000 ₹11,11,000 | 1,35,000 ₹14,85,000 | 1,38,000 ₹15,18,000 | 99,999 ₹10,99,989 Lowest | 1,49,000 ₹16,39,000 |
| 1.01(a) Perform visual checks and operational tests of all UPS equipment and associated switchgear. (b) Review maintenance logs and log all alarm operations and output (c) Complete a functional checkout and test ( ideal, load, by pass ) of the UPS diagnostic systems. (d) Check environment, temperature, dust, moisture, room vents, etc. (e) Clean and tighten all power connections at the input and output terminals, at all circuit breakers, and at the terminal posts and fuses on the rectifier and inverter legs. During the inspection, check all power cabling for abrasions and burn spots. Thermal Scanner / heat emmision checking of all components and Acessories of complete UPS sysyetm for signs of overheating, swelling, leaking, etc..along with Visually check printed circuit board alignments. (f) Replace air filters at regular intervals. Site conditions will determine how often the filters should be replaced, but generally, they will need to be replaced at least every 6 months in clean environments. If more frequent replacement is required, the cleanliness of the environment should be upgraded. (g) Check and calibrate each system, switchgear and circuit breakers, meters, and alarm levels for frequency, voltage, current, transfer, trip, alarm, etc. (h) Perform system and component functional tests on UPS equipment to insure proper functioning within specified parameters. (l) Run all UPS system diagnostics, and correct all diagnosed problems. (m) Resolve any previous outstanding problems, review operation with user personnel, and report any power enhancement or equipment operation recommended changes. (n) Replace control batteries as required. If the control batteries have been used without inverter or bypass AC power, (o) Opening of all doors, drawers, and covers. Perform a thorough inspection of all cabinets for foreign objects. Perform a thorough dusting and vacuuming of all cabinet interiors. Use only rubber or plastic vacuum attachments to clean drawers and cabinets. Except for vacuuming, never attempt to clean the UPS subassemblies. The exterior panels can be cleaned with a mild cleaning solution. Transparent panels should be cleaned with a mild soap and water solution only. Restore all doors and covers to their secured condition. | ||||||||
| 1.02(p) Off-line load test the UPS system to ensure that the system is completely functional. (q) Restoring of the UPS to service as per the manufacturer’s recommended start-up procedures. the service Engineer/ Contractor shall ensure that no damage to the UPS equipment or shutdown will occur because of inrush currents. (r). Contractor Shall be reponsible for 100% working of the UPS and its associated acessories for period of 40 Days after carring out the scheduled maintance. If Any Break down Malfunction of the UPS occurs it will be rectified by the Contractor free of cost through the authorised OEM in a sipulated period of 12 hrs, failing so to restore the UPS shall recover an amount of 25000/- per every 12 Hrs. NOTES:- (i) The contractor shall maintain the UPS as per Shedule including sunday & all national /local holidays failing so to carry out preventive maintance in the stipulated time shall recover an amount of 25000/- (ii) The rate quoted Includes the cost of labour , installation and testing of all 100% parts of the UPS and spares like replacement of electrical , fuses, control & Power transformers (if applicable), Dust filters, indicating lamps; however repairing of above components will be part of Scope. And Spares other than the mentioned shall be measured and paid sepertely under relevent Items (iii) Replacement of Defective Battries and Defective Spares of IOT Based Monitoring shall be the resposibility of MES as they are under Warrenty Period. (iv) Monthly check carried out as per monthly check performa duly approved by the accepting officer/ as per the OEM (v) Contractor have submit maintenace report duly signed by OEM and USER nad Eng-in Charge for each UPS separately before submitting the RAR (vi) Equipment use for testing purpose must be calibrated and bidder should produce calibration certificate before start the test. (vii) Authorised OEM / Service Engineer must have minimum 3 years of past experience of testing/servicing of the online UPS (viii). The spares provided shall be of IEC standard. (ix) Due to continuous working of the Administrative building and continious running plant, servicing and testing of UPS can only be done on weekly off, holidays or after office hours. (x) PRE Permission has to be obtained from the USER before planning of the Schedule to work | ||||||||
| 2.00 | All as peritem No-1 here in before but preventive maintenance of microprocessor based online UPS of capacity 120 KVA of 2 Nos of Make: vertiv / emerson Model liebert SX 120 comprising of suitable Nos of power moduls with IGBT based rectifier to achive input THDI<6% and input power factor of greater than 0.98 at 100% loading. True online double conversion(VF) as per (IEC 62040-3) UPS using PWM IGBT technology 3 phase input and 3 phase 400 v output UPS System along with Isolation transformers and Disrtubution LT Panell / Parallel operation o the UPS along with 9 AH, 12 Volt 600 No's Battery Bank/ UPS , IOT Based Monitoring Unit and Preventive maintenance consisting of the following scheduled list of activities. for keeps the UPS in good working order to prevent failures and complete all as specified and directed by Engr-in-charge. | 11 | Each Job for set of 2 UPS/Twice in a month | 65,000 ₹7,15,000 Lowest | 85,000 ₹9,35,000 | 85,000 ₹9,35,000 | 69,999 ₹7,69,989 | 69,000 ₹7,59,000 |
| 3.00 | Preventive maintenance of microprocessor based online PDU of 2 Nos and isolation transformer 3 Nos of Make: vertiv / emerson THDI<6% and input power factor of greater than 0.98 at 100% loading. True online double conversion(VF) as per (IEC 62040-3) PDU using PWM IGBT technology 3 phase input and 3 phase 400 v output IOT Based Monitoring Unit and Preventive maintenance consisting of the following scheduled list of activities. for keeps the UPS in good working order to prevent failures complete all as specified and directed by Engr-in-charge:-
(a) Perform visual checks and operational tests of all UPS equipment and associated switchgear.
(b) Review maintenance logs and log all alarm operations and output.
(c) Complete a functional checkout and test ( ideal, load, by pass ) of the UPS diagnostic systems.
(d) Check environment, temperature, dust, moisture, room vents, etc.
(e) Clean and tighten all power connections at the input and output terminals, at all circuit breakers, and at the terminal posts and fuses on the rectifier and inverter legs. During the inspection, check all power cabling for abrasions and burn spots. Thermal Scanner / heat emmision checking of all components and Acessories of complete PDU sysyetm for signs of overheating, swelling, leaking, etc..along with Visually check printed circuit board alignments.
(f) Replace air filters at regular intervals. Site conditions will determine how often the filters should be replaced, but generally, they will need to be replaced at least every 6 months in clean environments. If more frequent replacement is required, the cleanliness of the environment should be upgraded .
(g) Check and calibrate each system, switchgear and circuit breakers, meters, and alarm levels for frequency, voltage, current, transfer, trip, alarm, etc. | 11 | Each Job for set of 2 UPS/Twice in a month | 48,000 ₹5,28,000 Lowest | 84,300 ₹9,27,300 | 85,000 ₹9,35,000 | 69,999 ₹7,69,989 | 59,000 ₹6,49,000 |
| 3.01(h) Perform system and component functional tests on PDU equipment to insure proper functioning within specified parameters. (j) Run all PDU system diagnostics, and correct all diagnosed problems. (k) Resolve any previous outstanding problems, review operation with user personnel, and report any power enhancement or equipment operation recommended changes. (l) Replace control batteries as required. If the control batteries have been used without inverter or bypass AC power, (m) Opening of all doors, drawers, and covers. Perform a thorough inspection of all cabinets for foreign objects. Perform a thorough dusting and vacuuming of all cabinet interiors. Use only rubber or plastic vacuum attachments to clean drawers and cabinets. Except for vacuuming, never attempt to clean the PDU subassemblies. The exterior panels can be cleaned with a mild cleaning solution. Transparent panels should be cleaned with a mild soap and water solution only. Restore all doors and covers to their secured condition. (n) Off-line load test the PDU system to ensure that the system is completely functional. (o) Restoring of the PDU to service as per the manufacturer’s recommended start-up procedures. the service Engineer/ Contractor shall ensure that no damage to the PDU equipment or shutdown will occur because of inrush currents. (p) Contractor Shall be reponsible for 100% working of the PDU Notes :- (i) The contractor shall maintain the PDU as per Schedule including sunday & all national /local holidays failing so to carry out preventive maintance in the stipulated time shall recover an amount of 25000/- (ii) The rate quoted Includes the cost of labour , installation and testing of all 100% parts of the PDU and spares like replacement of electrical , fuses, control & Power transformers (if applicable), Dust filters, indicating lamps; however repairing of above components will be part of Scope. And Spares other than the mentioned shall be measured and paid sepertely under relevent Items (iii) Replacement of Defective Battries and Defective Spares of IOT Based Monitoring shall be the resposibility of MES as they are under Warrenty Period. | ||||||||
| 3.02(iv) Monthly check carried out as per monthly check performa duly approved by the accepting officer/ as per the OEM (v) Contractor have submit maintenace report duly signed by OEM and USER and Eng-in Charge for each PDU separately before submitting the Wok done.(vi) Equipment use for testing purpose must be calibrated and bidder should produce calibration certificate before start the test. (vi) Authorised OEM / Service Engineer must have minimum 3 years of past experience of testing/servicing of the online PDU (viii) The spares provided shall be of IEC standard. (ix) Due to continuous working of the Administrative building and continuous running plant, servicing and testing of PDU can only be done on weekly off, holidays or after office hours. (x) PRE Permission has to be obtained from the USER before planning of the Schedule to work Notes For Sr Item No 01 to 03 (i) The contractor will have to submit MOU as given from Authorised Service center / OEM of UPS only. Contractor will conclude MOU with OEM and copy of the agreement will be submitted to GE, with in 28 Days of Acceptance or commencement of work which ever is earlier. (ii) Contractor will also conclude AMC with OEM and copy of the agreement will be submitted to GE with in 28 Days of Acceptance or commencement of work which ever is earlier. | ||||||||
| 4.00 | Excavation in trenches not exc. 1.5 m wide and not exc 1.5 m deep in soft/loose soil) for laying of cables or GI pipe and getting out including levelling of bottom suface to required level complete all as specified and directed by Engr-in-charge. | 669.6 | Cum | 70 ₹46,872 | 122 ₹81,691.2 | 120 ₹80,352 | 49 ₹32,810.4 Lowest | 69 ₹46,202.4 |
| 5.00 | Material and labour for river washed and screened, dry sand for filling in trenches below and around underground cables and in substation ducts for cushioning of cables etc, complete all as specified and directed by Engr-in-charge.
(Measurement should be after punning down) | 200.9 | Cum | 149 ₹29,934.1 | 378 ₹75,940.2 | 360 ₹72,324 | 9 ₹1,808.1 Lowest | 17 ₹3,415.3 |
| 6.00 | Supplying and fixing sub class B bricks having minimum compressive strength 75 Kg/ Sq cm laid in trenches for cable protection etc complete all as specified and directed by Engr-in-charge. | 18,000 | Each | 2 ₹36,000 | 5 ₹90,000 | 4 ₹72,000 | 0.99 ₹17,820 Lowest | 2 ₹36,000 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
25 Dec 2025, 6:00 pmClosed
GE Utility Electric Supply
GE Utility Electric Supply Delhi Cantt-10
PERIODICAL MAINTANANCE AND SERVICING 03 PHASE ONLINE UPS OF 120 KVA 05 NOS PDU 02 NOS AND ISOLATION TRANSFORMER 03 NOS WITH CONNECTED ACESSORIES ALONG WITH DISTRIBUTION LT PANELS CABLES OF DIPAC AND NEW CHITRA LINE AND ASSOCIATED AREA OF AGE U ELEC
2025_MES_742972_1
GE ELECT/D-73/2025-2026
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
GE Utility Electric Supply
AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹500
Yes
GE Utility Electric Supply
₹98,000
Yes
24 Jan 2026
4 Dec 2025
27 Dec 2025
4 Dec 2025
25 Dec 2025
18 Dec 2025
Amount
Preventive maintenance of microprocessor based online UPS of capacity 120 KVA of 3 Nos of Make: vertiv / emerson Model liebert APM comprising of suitable Nos of power moduls with IGBT based rectifier to achive input THDI<6% and input power factor of greater than 0.98 at 100% loading. True online double conversion(VF) as per (IEC 62040-3) UPS using PWM IGBT technology 3 phase input and 3 phase 400 v output UPS System along with Isolation transformers of 150 KVA and Disrtubution LT Panell / Parallel operation of the UPS along with 12V ,40Nos 150 AH Battery Bank , IOT Based Monitoring Unit and Preventive maintenance consisting of the following scheduled list of activities for keeps the UPS in good working order to prevent failures and complete all as specified and directed by Engr-in-charge.
(a) Perform visual checks and operational tests of all UPS equipment and associated switchgear. (b) Review maintenance logs and log all alarm operations and output (c) Complete a functional checkout and test ( ideal, load, by pass ) of the UPS diagnostic systems. (d) Check environment, temperature, dust, moisture, room vents, etc. (e) Clean and tighten all power connections at the input and output terminals, at all circuit breakers, and at the terminal posts and fuses on the rectifier and inverter legs. During the inspection, check all power cabling for abrasions and burn spots. Thermal Scanner / heat emmision checking of all components and Acessories of complete UPS sysyetm for signs of overheating, swelling, leaking, etc..along with Visually check printed circuit board alignments. (f) Replace air filters at regular intervals. Site conditions will determine how often the filters should be replaced, but generally, they will need to be replaced at least every 6 months in clean environments. If more frequent replacement is required, the cleanliness of the environment should be upgraded. (g) Check and calibrate each system, switchgear and circuit breakers, meters, and alarm levels for frequency, voltage, current, transfer, trip, alarm, etc. (h) Perform system and component functional tests on UPS equipment to insure proper functioning within specified parameters. (l) Run all UPS system diagnostics, and correct all diagnosed problems. (m) Resolve any previous outstanding problems, review operation with user personnel, and report any power enhancement or equipment operation recommended changes. (n) Replace control batteries as required. If the control batteries have been used without inverter or bypass AC power, (o) Opening of all doors, drawers, and covers. Perform a thorough inspection of all cabinets for foreign objects. Perform a thorough dusting and vacuuming of all cabinet interiors. Use only rubber or plastic vacuum attachments to clean drawers and cabinets. Except for vacuuming, never attempt to clean the UPS subassemblies. The exterior panels can be cleaned with a mild cleaning solution. Transparent panels should be cleaned with a mild soap and water solution only. Restore all doors and covers to their secured condition.
(p) Off-line load test the UPS system to ensure that the system is completely functional. (q) Restoring of the UPS to service as per the manufacturer’s recommended start-up procedures. the service Engineer/ Contractor shall ensure that no damage to the UPS equipment or shutdown will occur because of inrush currents. (r). Contractor Shall be reponsible for 100% working of the UPS and its associated acessories for period of 40 Days after carring out the scheduled maintance. If Any Break down Malfunction of the UPS occurs it will be rectified by the Contractor free of cost through the authorised OEM in a sipulated period of 12 hrs, failing so to restore the UPS shall recover an amount of 25000/- per every 12 Hrs. NOTES:- (i) The contractor shall maintain the UPS as per Shedule including sunday & all national /local holidays failing so to carry out preventive maintance in the stipulated time shall recover an amount of 25000/- (ii) The rate quoted Includes the cost of labour , installation and testing of all 100% parts of the UPS and spares like replacement of electrical , fuses, control & Power transformers (if applicable), Dust filters, indicating lamps; however repairing of above components will be part of Scope. And Spares other than the mentioned shall be measured and paid sepertely under relevent Items (iii) Replacement of Defective Battries and Defective Spares of IOT Based Monitoring shall be the resposibility of MES as they are under Warrenty Period. (iv) Monthly check carried out as per monthly check performa duly approved by the accepting officer/ as per the OEM (v) Contractor have submit maintenace report duly signed by OEM and USER nad Eng-in Charge for each UPS separately before submitting the RAR (vi) Equipment use for testing purpose must be calibrated and bidder should produce calibration certificate before start the test. (vii) Authorised OEM / Service Engineer must have minimum 3 years of past experience of testing/servicing of the online UPS (viii). The spares provided shall be of IEC standard. (ix) Due to continuous working of the Administrative building and continious running plant, servicing and testing of UPS can only be done on weekly off, holidays or after office hours. (x) PRE Permission has to be obtained from the USER before planning of the Schedule to work
All as peritem No-1 here in before but preventive maintenance of microprocessor based online UPS of capacity 120 KVA of 2 Nos of Make: vertiv / emerson Model liebert SX 120 comprising of suitable Nos of power moduls with IGBT based rectifier to achive input THDI<6% and input power factor of greater than 0.98 at 100% loading. True online double conversion(VF) as per (IEC 62040-3) UPS using PWM IGBT technology 3 phase input and 3 phase 400 v output UPS System along with Isolation transformers and Disrtubution LT Panell / Parallel operation o the UPS along with 9 AH, 12 Volt 600 No's Battery Bank/ UPS , IOT Based Monitoring Unit and Preventive maintenance consisting of the following scheduled list of activities. for keeps the UPS in good working order to prevent failures and complete all as specified and directed by Engr-in-charge.
Preventive maintenance of microprocessor based online PDU of 2 Nos and isolation transformer 3 Nos of Make: vertiv / emerson THDI<6% and input power factor of greater than 0.98 at 100% loading. True online double conversion(VF) as per (IEC 62040-3) PDU using PWM IGBT technology 3 phase input and 3 phase 400 v output IOT Based Monitoring Unit and Preventive maintenance consisting of the following scheduled list of activities. for keeps the UPS in good working order to prevent failures complete all as specified and directed by Engr-in-charge:- (a) Perform visual checks and operational tests of all UPS equipment and associated switchgear. (b) Review maintenance logs and log all alarm operations and output. (c) Complete a functional checkout and test ( ideal, load, by pass ) of the UPS diagnostic systems. (d) Check environment, temperature, dust, moisture, room vents, etc. (e) Clean and tighten all power connections at the input and output terminals, at all circuit breakers, and at the terminal posts and fuses on the rectifier and inverter legs. During the inspection, check all power cabling for abrasions and burn spots. Thermal Scanner / heat emmision checking of all components and Acessories of complete PDU sysyetm for signs of overheating, swelling, leaking, etc..along with Visually check printed circuit board alignments. (f) Replace air filters at regular intervals. Site conditions will determine how often the filters should be replaced, but generally, they will need to be replaced at least every 6 months in clean environments. If more frequent replacement is required, the cleanliness of the environment should be upgraded . (g) Check and calibrate each system, switchgear and circuit breakers, meters, and alarm levels for frequency, voltage, current, transfer, trip, alarm, etc.
(h) Perform system and component functional tests on PDU equipment to insure proper functioning within specified parameters. (j) Run all PDU system diagnostics, and correct all diagnosed problems. (k) Resolve any previous outstanding problems, review operation with user personnel, and report any power enhancement or equipment operation recommended changes. (l) Replace control batteries as required. If the control batteries have been used without inverter or bypass AC power, (m) Opening of all doors, drawers, and covers. Perform a thorough inspection of all cabinets for foreign objects. Perform a thorough dusting and vacuuming of all cabinet interiors. Use only rubber or plastic vacuum attachments to clean drawers and cabinets. Except for vacuuming, never attempt to clean the PDU subassemblies. The exterior panels can be cleaned with a mild cleaning solution. Transparent panels should be cleaned with a mild soap and water solution only. Restore all doors and covers to their secured condition. (n) Off-line load test the PDU system to ensure that the system is completely functional. (o) Restoring of the PDU to service as per the manufacturer’s recommended start-up procedures. the service Engineer/ Contractor shall ensure that no damage to the PDU equipment or shutdown will occur because of inrush currents. (p) Contractor Shall be reponsible for 100% working of the PDU Notes :- (i) The contractor shall maintain the PDU as per Schedule including sunday & all national /local holidays failing so to carry out preventive maintance in the stipulated time shall recover an amount of 25000/- (ii) The rate quoted Includes the cost of labour , installation and testing of all 100% parts of the PDU and spares like replacement of electrical , fuses, control & Power transformers (if applicable), Dust filters, indicating lamps; however repairing of above components will be part of Scope. And Spares other than the mentioned shall be measured and paid sepertely under relevent Items (iii) Replacement of Defective Battries and Defective Spares of IOT Based Monitoring shall be the resposibility of MES as they are under Warrenty Period.
(iv) Monthly check carried out as per monthly check performa duly approved by the accepting officer/ as per the OEM (v) Contractor have submit maintenace report duly signed by OEM and USER and Eng-in Charge for each PDU separately before submitting the Wok done.(vi) Equipment use for testing purpose must be calibrated and bidder should produce calibration certificate before start the test. (vi) Authorised OEM / Service Engineer must have minimum 3 years of past experience of testing/servicing of the online PDU (viii) The spares provided shall be of IEC standard. (ix) Due to continuous working of the Administrative building and continuous running plant, servicing and testing of PDU can only be done on weekly off, holidays or after office hours. (x) PRE Permission has to be obtained from the USER before planning of the Schedule to work Notes For Sr Item No 01 to 03 (i) The contractor will have to submit MOU as given from Authorised Service center / OEM of UPS only. Contractor will conclude MOU with OEM and copy of the agreement will be submitted to GE, with in 28 Days of Acceptance or commencement of work which ever is earlier. (ii) Contractor will also conclude AMC with OEM and copy of the agreement will be submitted to GE with in 28 Days of Acceptance or commencement of work which ever is earlier.
Excavation in trenches not exc. 1.5 m wide and not exc 1.5 m deep in soft/loose soil) for laying of cables or GI pipe and getting out including levelling of bottom suface to required level complete all as specified and directed by Engr-in-charge.
Material and labour for river washed and screened, dry sand for filling in trenches below and around underground cables and in substation ducts for cushioning of cables etc, complete all as specified and directed by Engr-in-charge. (Measurement should be after punning down)
Supplying and fixing sub class B bricks having minimum compressive strength 75 Kg/ Sq cm laid in trenches for cable protection etc complete all as specified and directed by Engr-in-charge.
Laying only old bricks retrived from Item No 4.00 complete all as specified and directed by Engr-in-charge.
Returning filling in,. including spreading, levelling, watering and well ramming soil in layers not exceeding 25 cm thick complete all as specified and directed by Engr-in-charge.
Removing excavated material (ie soil) from site to a distance n. exc 50 m away and depositing where directed at a level n. exc. 1.5 m above the starting point complete all as specified and directed by Engr-in-charge.
Material and labour for Demolition of path /concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level)complete all as specified and directed by Engr-in-charge.
Material and labour for Cement Concrete type B-2 mix, 1:2:4 (40mm graded aggregate) 150mm thick, finishing the top surfaces fair and even complete all as specified and directed by Engr-in-charge.
Boring of hole under road/pavement/hard standing or any other situation by mannual means and suitable for passing of GI pipe 40 to 100 mm bore and making good both ends all complete all as specified and directed by Engr-in-charge.
Supply and lay GI pipe light grade in replacement as cable protection laid on trench/floor, fixed on pole/wall etc of following sizes complete all as specified and directed by Engr-in-charge. of size 100 mm dia.
All as per item No 13.00 above but of size 80 mm dia complete all as specified and directed by Engr-in-charge.
All as per item No 13.0 above but of size 50 mm dia complete all as specified and directed by Engr-in-charge.
All as per item No 13.0 above but of size 40 mm dia complete all as specified and directed by Engr-in-charge.
Supply, laying, jointing, testing and commissioning in replacement of LT underground cables of size 25 Sqmm 4 core, 1100 volts grade, PVC insulated XLPE and PVC sheathed, heavy duty armoured, with multistranded aluminium conductors, IS-7098, Part-II marked, laid in trenches/ duct/ under road/ footpath/ etc or against re-routing / diversion from residential buildings/ road/ footpath etc complete all as specified and directed by Engr In Charge.
All as per srl item No 17.0 here-in-before but of size 35 Sqmm 4 core .
All as per srl item No 17.0 here-in-before but of size 50 Sq mm 3.5 core.
All as per srl item No 17.0 here-in-before but of size 70 Sq mm 3.5 core.
All as per srl item No 17.0 here-in-before but of size 95 Sqmm 3.5 core .
All as per srl item No 17.0 here-in-before but of size 185 Sqmm 3.5 core.
All as per srl item No 17.0 here-in-before but of size 240 Sqmm 3.5 core .
Supply, fixing and testing straight through joint heat shrinkable type with jointing kit suitable for cable PVC/XLPE insulated armoured heavy duty aluminium conductor 1100 Volts grade complete all as specified and directed by Engr-in-charge. for the size 25 to 50 Sqmm x 3.5 core/ 4 core
All as per item No 24.0 but size 70 to 95 Sqmm x 3.5 core
All as per item No 24.0 but size 185 to 240 Sqmm x 3.5 core
Supply and fixing in replacement battery bank comprising 50 volts, 100 AH @ 2 Volt each- 25 Nos sealed maintenance free battery complete all as specified and directed by Engr-in-charge.
Material and labour in replacement Earthing complete with galvanized steel earth plate electrode of size 60cmx60cmx6 mm thick, buried directly in ground (earth pit not less than 3.5 m below normal ground level) with top edge of earth plate not less than 2.5m below normal ground level, connected to galvanized strip 32 x 6 mm by means of bolts, nuts, check nuts and washers of galvanised iron or steel as shown in electrical plate No 3 of SSR Part I, connected to earth test point and the equipment on the other nuts and washers of galvanised iron side complete all as specified, including testing and commissioning complete all as specified and directed by Engr-in-charge. Note : (a) The unit rates quoted against this item shall be deemed to include the cost of excavation and earth work in soft/loose soil, common salt & charcoal dust in alternate layers, PCC 1:3:6 type C2 as in pit, precast RCC 1:2:4 type B-1 with necessary reinforcement 6mm dia both ways as in cover & frame for pit, funnel, watering pipe 20 mm bore GI pipe light grade, protection pipe 40 mm bore GI pipe medium grade etc. (b) The quoted rates shall also deemed to include the cost of earth test point and earth strip/GI lead wire and protection pipe upto 7.5 meter beyond the earth plates electrode.
All as per item No 28.0 above but using copper plate 60 cm × 60 cm × 3.15mm thick electrode and 20 × 3mm copper strip as earthing lead, in replacement of any types of earthing, complete all as specified and directed by Engr-in-charge.
Note : Contractor should procure and provide 50 % of the material as listed above within 15 days of the placing of work order and shall be verified by the Engr-in-charge.
M/S ADHIKARI CONSTRUCTION CO. (BID ID -3506268)
S K ENGINEERS AND CONTRACTOR (BID ID -3507101)
GILL ENGINEERS (BID ID -3507417)
BUSINESS TEK INDIA (BID ID -3513553)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_831968.xls
BOQ • 0.26 MB
TD73NEW.pdf
Tender Documents • 1.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .