| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.7 LAccepted-AOC | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹17.1 L+₹39,676 (2.38%)Rejected-AOC COIMBATORE | L2 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | SKMS Constructions L2 | A.Ammasaiappan L1 |
|---|---|---|---|---|---|
| 1.00 | Levelling the existing Ground and Removing the debries using mechanical JCB on hire basis including all labour charges and hiring charges as per the direction of the Departmental officers etc., Complete. | 5 | Hrs | 850 ₹4,250 | 750 ₹3,750 Lowest |
| 2.00 | Providing Pile foundation of size 300 mm dia using augur including labour charges and all other tools and plants charges etc. , as rdirection of dept officers ocal Rate) | 191 | M | 300 ₹57,300 | 280 ₹53,480 Lowest |
| 3.00 | Earth work excavation in all soils and Sub Soils with initial lead and lift including all Labour Charges as per the Direction of the De artmental officers etc. complete. | 6 | M3 | 300 ₹1,800 | 270 ₹1,620 Lowest |
| 4.00 | Cement concrete 1:4:8 mix ( One Cement, Four Sand , Eight Aggregate)using 40mm size HBG metal from approved quarry including mixing, laying, compacting, curing and all labour char‘es Coms] in: with Standard S -ecification etc. complete | 6 | M3 | 5,700 ₹34,200 | 5,590 ₹33,540 Lowest |
| 5.00Supply and erecting shuttering including necessary supports for plane surfaces such as RCC column, footing, plinth beam, stair case etc., in all floors using mild steel sheets of 90cm X 60cm and 10 gauge stiffened with welded mild steel angle for boarding supported by casurina props at suitable intervals etc., completed complying with standard specification and as directed. S1.No.122 | |||||
| 5.01 | For Plinth beam | 106 | M2 | 990 ₹1,04,940 | 980 ₹1,03,880 Lowest |
| 5.02 | For column | 104 | M2 | 1,400 ₹1,45,600 | 1,300 ₹1,35,200 Lowest |
| 6.00 | Reinforced Cement Concrete 1:1.5:3, one part of cement, one and half parts of sand , three parts of 20 mm hard blue granite metal by volume, characteristic strength not less than 20 N/sqmm) machine mixed for all reinforced Cement Concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., but excluding the cost and fabrication o reinforcements and also excluding centering and formwork etc. complete complying with the relevant standard specification at all leads inside the buildin . | 27 | M3 | 8,800 ₹2,37,600 | 8,750 ₹2,36,250 Lowest |
| 7.00 | Supplying and fabricating of reinforcement steel of all diameters for reinforced cement concrete works at all heights and depths including straightening,cleaning,cutting,ending, placing in position and binding, hoisting and welding if any including cost of power, electrodes etc, cost of annealed binding wire (18 gauge), providing overlaps, tying in position and providing necessary cover blocks for all works as per detailed drawings supplied (including chairs, cranks, lap rods, spacer bars, fan hooks etc.,) with the relevant standard specifications, complete for all leads & lifts. | 27 | Qtl | 9,375 ₹2,53,125 | 9,320 ₹2,51,640 Lowest |
| 8.00 | Construction of Concrete Solid Block work in cement mortar 1:5 mix (one cement five sand) using Solid Block ( 0.30 x0.20 x 0.15 ) for the following including curing etc., completed. | 65 | M3 | 7,250 ₹4,71,250 | 7,210 ₹4,68,650 Lowest |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
14 Jul 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of compound wall at Ramanathapuram corporation Higher Secondary School in Ward No 63 Centra Zone.
2025_MAWS_576267_2
e37/2025
Open Tender
Civil Works
Works
120 days
Coimbatore corporation
AS PER THE TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹20,000
1 Nov 2025
1 Jul 2025
15 Jul 2025
1 Jul 2025
14 Jul 2025
1 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .