Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 CrAccepted-AOC A 11 N G O B COLONY TIRUNELVELI 627 007 | TIRUNELVELI | TAMIL NADU | 627007 | ₹6.2 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹6.5 Cr+₹24.9 L (4.01%)Rejected-Finance 26 10 627 759 | TENKASI | TAMIL NADU | 627759 | ₹6.5 Cr+₹24.9 L (4.01%) | L2 | Rejected-Finance High Quoted |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
| 4 | Not Admitted-Fee/PreQual/Technical NO 12 RAMVILAS NAGAR NGO B COLONY TIRUNELVELI 627 007 | TIRUNELVELI | TAMIL NADU | 627007 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹6.2 Cr
EMD Value
₹3.2 L
Closing Date
15 Oct 2019, 3:00 pmClosed
SE Highways C and M Tirunelveli
Office of the superintending engineer highways C and M Tirunelveli
Impts Impts to Riding qty Consn and Reconsn of Culvert and P Block to MDR and ODR in Nanguneri H C and M Sub Division including upkeeping for a period of 60 months
2019_HWAY_137935_1
TN No 8 2019 20 D1 dated 10 09 2019
Open Tender
Civil Works - Highways
Percentage
180 days
Nanguneri
Average Annual Turnover
Completed Contracts
Minimantities of works complee year during the last five years
Personnel capabilities
Equipment capabilities
Financial position
Audited balance sheet for thfive years
Litigation history
9 documents required · 9 mandatory
₹0
₹3.2 L
25 Mar 2022
13 Sept 2019
11 Nov 2019
13 Sept 2019
15 Oct 2019
27 Sept 2019
18 Sept 2019 - 23 Sept 2019
eProcurement System Government of Tamil Nadu Created By: Amutha Ram Created Date/Time: 14-Nov-2019 05:53 PM Tender Title: TN No 8 2019 20 D1 dated 10 09 2019 Tender ID: 2019_HWAY_137935_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Tirunelveli Circle
PACKAGE 40 - Improvements, Improvements to Riding quality Construction and Reconstruction of Culvert and Paver Block to Major District Roads and Other District Roads in Nanguneri (H) C&M, Sub –Division including upkeeping for a period of 60 months 1 Improvements of Nanguneri - Moolaikaraipatti Road. at km 3/300 - 4/0 and 5/0 - 6/0 (MD 292) including upkeeping for a period of 60 months 2 Improvements of Eruvadi - Thirukkurankudi Road. at km 3/0 - 4/0 including paver block(MD 112) including upkeeping for a period of 60 months 3 Improvements to Riding Quality at km 3/0 - 5/4 of Nanguneri - Kalakad Road. (MD 291) including upkeeping for a period of 60 months 4 Improvements to Riding Quality at km 4/6 - 5/4 and 7/0 - 9/985 of Ilayarkulam - Subramaniapuram Road including extra length of 145m at km 9/985 including upkeeping for a period of 60 months 5 Improvements to Riding Quality at km 5/0 - 7/0 of Munanjipatti - Sathankulam Road including upkeeping for a period of 60 months 6 Improvements of Moontradaippu - Pudukurichi Road at km 2/6 - 4/2 including reconstruction of culvert at km 3/0 including upkeeping for a period of 60 months 7 Improvements of Moontradaippu - Pathiniparai Road at km 3/0 - 3/6 including upkeeping for a period of 60 monthsonths 8 Improvements of Mayaneri Road at km 0/0 - 2/4 including construction of culvert at km 0/2(i),(ii),0/4 & 2/2 (using plastic wastes) Including Upkeeping for a period of 60 months 9 Improvements to Riding Quality at km 5/6 - 6/0 and 7/4 - 8/4 of Maruthakulam - Moolaikaraipatti Road including upkeeping for a period of 60 months 01 Improvements to Riding Quality at km 4/4 - 7/4 of Maruthakulam - Moolaikaraipatti Road (via) Deivanayagaperi including upkeeping for a period of 60 months 02 Improvements to Riding Quality at km 0/0 - 3/0 of Moontradaippu - Pathiniparai Road including upkeeping for a period of 60 months 03 Improvements of Marukalkurichi Road at km 0/0 - 2/0 Including Upkeeping for a period of 60 months 04 Reconstruction of 1 row pipe culvert at km 8/2 of Maruthakulam - Moolaikaraipatti road Including Upkeeping for a period of 60 months
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 N. Ravichandran 55377001.100 4.000 64503131.000 Six Crore Fourty Five Lakh Three Thousand One Hundred and Thirty One
2.00 MUTHUMANIKANDANANDCO 55377001.100 -0.010 62016039.000 Six Crore Twenty Lakh Sixteen Thousand Thirty Nine
Lowest Amount Quoted BY: MUTHUMANIKANDANANDCO(62016039.000)
BOQ Summary Details Tender Title: TN No 8 2019 20 D1 dated 10 09 2019 Tender ID: 2019_HWAY_137935_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 MUTHUMANIKANDANANDCO 62016039.000 L1
2 N. Ravichandran 64503131.000 L2
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .