Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.5 LAccepted-AOC AT PO DANARA PS COLLIERY TALCHER DIST ANGUL ODISHA 759103 | TALCHER | ANGUL | ODISHA | 759103 | ₹30.5 L Quoted ₹25.9 L | L1 | Accepted-AOC AWARDED FOR BEING L1 BIDDER |
| 2 | L2₹28.4 LRejected-Finance AT PO DERA VILL TALCHER DIST ANGUL ODISHA 759103 | TALCHER | ANGUL | ODISHA | 759103 | ₹28.4 L | L2 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
| 3 | L3₹29.1 LRejected-Finance AT PO DANARA PS COLLIERY DIST ANGUL ODISHA 759103 | DANARA | ANGUL | ODISHA | 759103 | ₹29.1 L | L3 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
Tender Value
₹45.7 L
EMD Value
₹57,200
Closing Date
24 Feb 2026, 5:00 pmClosed
STAFF OFFICER (CIVIL), HINGULA AREA
SO (CIVIL), OFFICE OF THE GM, HINGULA AREA, P.O._N.S.NAGAR, TALCHER, ANGUL_759148, ODISHA, INDIA
Repair and strengthening of weigh bridge approach ramp of W.B NO. 02,03,04,05,06,10,11,12,13 and 14 at Balram OCP under Hingula Area.
2026_MCL_353053_1
MCL/GM(HA)/Civil/e-Tender/ 25-26/136 Dt.13.02.2026
Open Tender
Civil Works - Others
90 days
HINGULA AREA
AS PER NIT
3 documents required · 3 mandatory
₹57,200
28 Apr 2026
14 Feb 2026
26 Feb 2026
14 Feb 2026
24 Feb 2026
14 Feb 2026
14 Feb 2026 - 17 Feb 2026
Item Description
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3(1 cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.39 MB
Tendernotice_2.pdf
PDF • 2.46 MB
BOQ_365851.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid