Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Rejected-Technical 7355 NO 22 7 MATHIYALAGAN STREET NEHRU NAGAR VELACHERY CHENNAI 42 | CHENNAI | CHENNAI | TAMIL NADU | 600042 | Rejected-Technical Rejection on initial scrutiny |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
26 Apr 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Vyasarpadi
Office of Executive Engineer Vyasarpadi
Labour Charges for Maintenance Improvement DCW and Extension Work at Various Location in Vadaperumbakkam Section of Vyasarpadi Division
2023_EB_302748_1
Enq14/23-24
Open Tender
Electrical and Maintenance Works
Works
180 days
Madhavaram
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,000
18 May 2023
15 Apr 2023
27 Apr 2023
15 Apr 2023
26 Apr 2023
15 Apr 2023
15 Apr 2023 - 25 Apr 2023
Amount
LABOUR CHARGES FOR ERECTION OF DOUBLE POLE STRUCTURE WITH DISTRIBUTION TRANSFORMER.
Excavation of Structure Pole Pit 2' x 3' x 1/6 th of height of pole
Erection of 9.14 M RCC/9.0 Mtr PSC /RSJ pole
Transporting of 9.14 m poles from Road side to pole pit
Structure pole mass Concreting and coping 0.6x0.6x1.65 mtr for DP structure Including cost of materials and cement.
Erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing. DPDC channel, T.I. Fitting etc., in complete.
Excavation of stay pit 0.95x0.60x1.5m
Erection of Stay Set Complete
Sleeve concrete for stay set including all materials & cement
Erection of HG fuse set with transport
Erection of 11 KV AB switch complete set with transport
Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., complete with trough / w.o. trough
Erection of Aluminium bus bar pipe complete for H.T. Bus bar arrangements for DP Structure
Erection of Aluminium bus bar pipe complete for H.T. Bus bar arrangements for TP Structure
Erection of Aluminium bus bar pipe complete for H.T. Bus bar arrangements for Four Pole Structure
Erection of L.T. Open type fuse unit including cable jumpering upto the line.
Providing LT bus bar arrangements in DT structure including fixing of cross arm and insulator.
Erection of H.T. jumpering in DP structure complete (150 * 3)
Erection of H.T. LAS (3 Nos)
Erection of L.T. LAS (4 Nos)
Erection of DT excluing loading and unloading using Crane - 63KVA/100KVA
Erection of DT excluing loading and unloading using Crane - Above 100 KVA
Painting of two coats of Aluminium paint for DP structure and iron materials including cost of paint and distemper etc. Without Material
Painting of two coats of Aluminium paint for DP structure and iron materials including cost of paint and distemper etc. - With Material
Painting of Structure pole with Distemper including cost of material
Loading and unloading of Distribution Transformer at site and store. (All Rating)
Dismantling of failed DT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading) - Upto 100 KVA
Dismantling of failed DT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading) - Above 100 KVA
LABOUR CHARGES FOR LAYING OF HT CABLE
Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., - Normal Road
Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., - Tar Road
Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc.,-Concrete Road
Loading and unloading of HT Cable including coiling and recoiling
Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle upto 5 Km
Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle above 5 Km
Laying of 11KV 3 X 300 sq mm XLPE cable
Laying of 11KV 3 X 120 sq mm XLPE cable
Covering HT cable by cement "V" trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & Cable size on the trough
Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete.
Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) upto 5 Km
Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) above 5 Km
LABOUR CHARGES FOR LAYING OF LT CABLE
Loading and unloading of LT Cable including coiling and recoiling
Transporting of 11 KV LT cable from departmental stores to work spot by engaging private vehicle upto 5 Km
Transporting of 11 KV LT cable from departmental stores to work spot by engaging private vehicle above 5 Km
Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. - Normal Road
Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. -Tar Road
Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc. -Concrete Road
Laying of LT 4 x 240 sq.mm cable
Laying of LT 4 X 120 sq.mm cable
Laying of LT 4 X 25 sq.mm cable
Laying of LT 2 X 16 sq.mm cable
Refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete.
LABOUR CHARGES FOR ERECTION OF PILLAR BOX
Erection of 4 / 6 Way pillar box - 3 Feet Height using concrete only - including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing including cost of all materials, el. works, transportation, lead, lift etc.,
Erection of Mini pillar box - 3 Feet Height using concrete only - including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing including cost of all materials, el. works, transportation, lead, lift etc.,
Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - 8 Way Pillar Box
Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - 8 Way Pillar Box
Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - 6 Way Pillar Box
Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - 6 Way Pillar Box
Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - 4 Way Pillar Box
Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - 4 Way Pillar Box
Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details with materials - Mini Pillar Box
Cleaning&painting with Aluminium paint 2 coats & numbering with fdr details without materials - Mini Pillar Box
LABOUR CHARGES FOR DISMANTLING OF PILLAR BOX
Dismantling of old 4 / 6 / 8 Way pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking.
Dismantling of old Mini pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking.
LABOUR CHARGES FOR MISCELLANEOUS WORK
Excavation of pole pit (pit size 2'x3'x1/6th of the length of poles) for 7.5mtrs/8 mtrs pole
Erection of 7.5m / 8m RCC/RSJ/PSC pole and other poles
Excavation of pole pit (pit size 2'x3'x1/6th of the length of poles) for 9.14m Pole
Erection of 9.14m RCC/RSJ/PSC pole and other poles
Trasportation of pole of all sizes from Road side to work spot
Trasportation of pole of all sizes from Stores to Road side upto 2KM
Trasportation of pole of all sizes from Stores to Road side upto Above 2 Km
Base concerting 30 cm thick for one pole including of all materials
Transporting of DTs/Metering sets/Line Materials through private vehicle from store to work spot / vice versa upto 10 Km
Transporting of DTs/Metering sets/Line Materials through private vehicle from store to work spot / vice versa Above 10 Km
Erection of V cross arm 3 1/2' size
Erection of V cross arm 4 1/2' size
Erection of Tapping channel 5 ' size / V Cross Arm 5' size
Excavation of stay pit
Erection of stay set complete
Fixing of 11 KV TI fitting
Fixing of 33 KV TI fitting
Fixing of LT 3 phase cross arm
Fixing of LT TI fitting
Fixing of single phase cross arm
LT pin insulator with pin
LT shackle with strap sets
11 KV pin insulator with GI pin
33 KV pin insulator with GI pin
11 KV strain disc with metal parts
33 KV strain disc with metal parts
Fixing of Aluminium knob
Fixing of caution / Danger Board
Providing of fly stay (excluding pole erection and earth excavation)
Concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height) - 7.5m/8m Pole
Concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height) - 9.14 metres pole (with coping of 1' dia upto height of 1.1/2' above ground level) Pole
Earthing of poles
Paving out conductor, stringing and sagging of line of 7/2.59mm ACSR / 7/2.50 mm AAAC conductors of LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering.
Paving out conductor, stringing and sagging of line of 7/3.35mm ACSR / 7/3.15 mm AAAC conductors of LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering.
Paving out conductor, stringing and sagging of line of 7/4.09mm ACSR Racoon conductors of HT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering.
Paving out conductor, stringing and sagging of line of 7/4.72mm Dog conductors of HT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering.
Numbering of location/each including cost of paint and labour
Providing of 2 wire flat guarding(Split neutral grounding) per span excluding of stay set erection
Providing of 4 wire flat guarding per span excluding of stay set erection
Providing of Craddle guarding including earthing and earth pit excavation per span excluding of stay set erection
Erection of street light fittings 2 feet/4 feet (All materials supplied by the Board) Labour alone.
Erection of cross bracing set 10' / 15' Structure - DP Structure
Erection of cross bracing set 10' / 15' Structure - TP Structure
Erection of Top Channels 10' / 15' Structure - DP Structure
Erection of Top Channels 10' / 15' Structure - TP Structure
Erection of 33 KV centre rotating AB switch complete set
Erection of 11 KV centre rotating AB switch complete set
Erection of Single phase spacer
Erection of Three phase spacer
Provision of jumper per phase for LT
Provision of Jumper per phase for HT
Provision of 'PA' jumpers
Loading of Metering Set
Un loading of Metering Set
Erection of Metering Sets - Up to 11KV metering set
Erection of Metering Sets - Above 11KV metering set
Loading of 7.5/8 metres pole (RCC/PSC)/Each
Loading of 9.14 metres pole RCC /9.0 mtr PSC/9.14 RSJ /Each
Unloading of 7.5/8 metres pole (RCC/PSC)/Each
Unloading of 9.14 metres pole RCC /9.0 mtr PSC/9.14 RSJ /Each
Loading of Conductor drum of all sizes with conductor
Loading of Conductor drum of all sizes without conductor
Unloading of Conductor drum of all sizes with conductor
Unloading of Conductor drum of all sizes without conductor
Manufacturing of MS clamps at works spot as per requirement , including alteration by using 50 x 8 mm Flat (with material)
Manufacturing of MS clamps at works spot as per requirement , including alteration by using 65 x 10 mm Flat (with material)
Cutting of Channel/Flat/Angle
Cutting of RSJ pole
Cutting of Tubular pole
Cutting of Rail pole
Drilling of 5/8", 3/8", 1/" Holes in Channels / Angles - Slot Holes
Drilling of 5/8", 3/8", 1/" Holes in Channels / Angles - Round Holes
Fixing of Missing doors in MS Mini Pillar Box
Fixing of Missing doors in MS 4 Way Pillar Box
Fixing of Missing doors in MS 6 Way Pillar Box
Fixing of Missing doors in MS 8 Way Pillar Box
Fixing of Missing doors in FRP Pillar Box
Provision of 2 Nos Hinges in all types of Pillar Box
LABOUR CHARGES FOR MAINTENANCE WORK
DP/TP Structure maintenance - Pole Mounted
DT maintenance for various capacity
Structure earthing wire redoing - Various capacity
Replacement of Structure earthing in complete without material - Various Capacity
DT structure Yard cleaning - Various Capacity
Watering to earth pits
Numbering of location including cost of paint and labour
Maintenance of 8 Way Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing.
Maintenance of 6 Way Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing.
Maintenance of 4 Way Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing.
Maintenance of Mini Pillar Box -such as replacement of damaged insulators worn out stembolts, lugs, termination of cables and dressing.
Numbering of Pillar with feeder details including cost of paint and labour
Maintenance of 11 KV ABS only at Structure. (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating).
Maintenance of 11 KV ABS only at SS. (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating).
Maintenance of 33 KV ABS at Structure (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating).
Maintenance of 33 KV ABS at SS (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating).
Cutting of big tree fouling on the line.
Cutting of tree branches fouling on the line.
Clearing of heavy bushes
Jungle/bushes/velikathan clearence
Set righting leaned HT/LT Poles at Pin Point Location
Set righting leaned HT/LT Poles at Cut Point Location
Re-sagging of HT Line - 7/4.72 mm
Re-sagging (HT/LT) Line 7/4.09 mm
Re-sagging (HT/LT) Line 7/3.35 mm
Re-sagging (HT/LT) Line 7/2.59 mm
DC of Single phase service
DC of Three phase service
RC of Single phase service
RC of Three phase service
LABOUR CHARGES FOR DISMANTLING WORK
Dismantling of 7.5m/8.0m Poles
Dismantling of 9.14 Mtr. Poles/RSJ/Tubular Poles
Dismantling of Stay set complete
Dismantling of conductors including Coiling and Transporting from workspot to road side upto 7/3.35mm Conductor without transport
Dismantling of conductors including Coiling and Transporting from workspot to road side above 7/3.35mm Conductor without transport
Releasing of LT S ph "X" Arm/TI Fitting
Releaasing of LT 3 ph "X" Arm
Releasing of 3' - 6" "V" Cross Arm/Tapping channal/Guarding "X" Arm
Releasing of 4' - 6" and "V" Cross Arm
Releasing of 5' "V" Cross Arm
Releasing of Distn.Tr. Only at field
Dismantling of Transformer Structure materials - Up to 100 KVA
Dismantling of Transformer Structure materials - Above 100 KVA
Dismantling of 11KV AB Switch at Structure
Dismantling of 33KV AB Switch at Structure
Dismantling of H.G. fuse set
Dismantling of HT LAS at DT Structure
Dismantling of LT LAS at DT Structure
Dismantling of Earth Pipe and Structure earthing complete
Dismantling of 2 Sets Open type fuse unit with all wiring complete(including bus bar arrangement)
Dismantling of cross bracing set
Dismantling of Top Channel
Dismantling of Guarding including Dismantling of cross arm per span
Dismantling of Single ph service wire & re-effecting service including meter
Dismantling of three ph service wire & re-effecting service including meter
Breaking of RCC Damaged Poles after dismantling,releasing the grill including transporting to Road side
Stacking materials/Scrap
LABOUR CHARGES FOR ATTENDING 33KV & 11KV CABLE FAULT - MANUALLY
Earth work Excavation to the required depth, width(cable route) is 1.2m x 0.6m respectively (As per prevailing PWLC Rates) for attending HT Cable fault manually - Normal Road
Earth work Excavation to the required depth, width(cable route) is 1.2m x 0.6m respectively (As per prevailing PWLC Rates) for attending HT Cable fault manually - Tar Road
Earth work Excavation to the required depth, width(cable route) is 1.2m x 0.6m respectively (As per prevailing PWLC Rates) for attending HT Cable fault manually - Concrete Road
Earth work Excavation to the required depth, width(cable route) is 1.2m x 0.6m respectively (As per prevailing PWLC Rates) for attending LT Cable fault manually - Normal Road
Earth work Excavation to the required depth, width(cable route) is 1.2m x 0.6m respectively (As per prevailing PWLC Rates) for attending LT Cable fault manually - Tar Road
Earth work Excavation to the required depth, width(cable route) is 1.2m x 0.6m respectively (As per prevailing PWLC Rates) for attending LT Cable fault manually - Concrete Road
Installation of 11KV joint by private jointer in the absence of company jointer (intimation to be given to company through mail/ company phone Nos and record to be maintained)
Installation of 11KV joint by private jointer in the absence of company jointer (intimation to be given to company through mail/ company phone Nos and record to be maintained)
Refilling with M- sand over the cable and joints (cost of M.sand as per PWD schedule of rates @ Rs.1590/- per cub.M - 11 KV (10mx0.6mx0.15m)=0.9 cub.mx1590
Refilling with M- sand over the cable and joints (cost of M.sand as per PWD schedule of rates @ Rs.1590/- per cub.M -33 KV (15mx0.6mx0.15m)=1.35 cub.mx1590
Refilling labour charges /mtr - LT Cable
Refilling labour charges /mtr - HT Cable
Transporting of 11KV/33KV cables and joint kits from stores to site
Transporting of 11KV/33KV cables and joint kits from office to site
LABOUR CHARGES FOR ATTENDING 33KV & 11KV CABLE FAULT - BY USING TOOLS & PLANTS
Hire charges for engaging JCB
Hire charges for engaging Crane
Installation of joint by private jointer in the absence of company jointer (intimation to be given to company through mail/ company phone Nos and record to be maintained) - 11KV Fault
Installation of joint by private jointer in the absence of company jointer (intimation to be given to company through mail/ company phone Nos and record to be maintained) - 33KV Fault
Engaging Hydraulic compressor (Tractor) for Breaking concrete/Tar Roads (Wherever Necessary)
Rental for de-watering pump as per PWD schedule of Rate (Wherever necessary)
Engaging Labour for Manual excavation and cleaning the trench, joint pit excavation and identify the cable in addition to engaging JCB. - 11 KV (Semi skilled Labour @ Rs.470/head)
Engaging Labour for Manual excavation and cleaning the trench, joint pit excavation and identify the cable in addition to engaging JCB. - 33 KV (Semi skilled Labour @ Rs.470/head)
Concreting after rectification of 11KV / 33KV fault by using PCC 1:3:6 (If applicable, with necessary justification & certification by concern Executive Engineer For reqd length,width and depth as per site condition)
LABOUR CHARGES FOR LAYING OF UG CABLE USING TRENCHLESS METHOD FOR FAULT RECTIFICATION / NEW WORK
Laying of HT UG Cable using Trenchless Technology without pipes
Laying of HT UG Cable using Trenchless Technology with pipes
LABOUR CHARGES FOR ERECTION OF SINGLE POLE STRUCTURE
Loading and Unloading of 9.0m Square Pole
Excavation of Pole Pit
Erection of 9.0m Square Pole
Transporting of Square Pole from Road Side to Pole Pit
Excavation of stay pit 0.95x0.60x1.5m
Erection of Stay Set Complete
Fixing of Single Pole Structure Material in complete shape
Erection of 16 / 25 / 40 KVA Distribution Transformer
Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., complete with trough / w.o. trough
Structure pole mass Concreting and coping 0.6x0.6x1.65 mtr for DP structure Including cost of materials and cement.
Sleeve concrete for stay set including all materials
Erection of HT LAS (3 Nos)
Erection of LT LAS (4 Nos)
Erection of LT Wiring Kit (Double Open Type Circuit)
Painting of single pole structure including iron materials double coat with materials
Painting of single pole structure including iron materials double coat without materials
Painting of Structure pole with Distemper including cost of material
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .