Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.0 L+₹7,802 (1.59%)Rejected-AOC | ₹5.0 L+₹7,802 (1.59%) | L2 | Rejected-AOC L2 |
| 3 | -₹4.7 LRejected-AOC | ₹4.7 L | - | Rejected-AOC Not Registered as Contractor |
| Sl No | Description | Qty | Unit | RAJESHKANNAN T L2 | SHRIDURGA CONTRACTORS L3 | RAMAKRISHNAN M L1 |
|---|---|---|---|---|---|---|
| 1.01 | Earth work excavation for foundation in Hard stiff clay, stiff blackcotton, hard red earth, shales murram, gravel,stoney earth and earthmixed with small size boulders SS.20B and Sand, silt or other loose soil,wet sand,or silt not under water, light black cotton soil, sandy loamordinary soil and to full depth as may be directed except in hardrockrequiring blasting inclusive of shoring shuttering and baling out waterand cleaning and levelling the site etc.,complete 10 cum Building data25-26 Pg :2 | 109 | m3 | 303 ₹33,027 | 320 ₹34,880 | 288.46 ₹31,441.7 Lowest |
| 2.01 | Filling Gravel in layers of 25cm thick Including cost of gravel stacking for premeasurment watering and consolidation by power roller rolling using 11.60cum of gravel for 10cum for finishing the Work.Road Data Page:26,Sl/no:31. | 81 | m3 | 700 ₹56,700 | 725 ₹58,725 | 666.4 ₹53,978.4 Lowest |
| 3.01 | Suppling and erecting shuttering with necessay supports for Plinth Beam with all cross bracings etc., complete ( Side Only) the payment for centering shall be given offer the concrete is laid vertical portion using steel plate.. Building Data 2025-26 Page:3 Sl.no;22 | 90 | m2 | 1,072 ₹96,480 | 1,090 ₹98,100 | 1,022.45 ₹92,020.32 Lowest |
| 4.01 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (MSand)and four coarse aggregates) using 20mm size ISS HBG metalincluding cost and conveyance of all materials to site and including forthe mixing, laying and labour charges etc., complete as per standard
specification Building Data 25-26 Page:2 Sl.no;12 | 11 | m3 | 7,535 ₹82,915.14 | 7,545 ₹83,025.18 | 7,180.51 ₹79,014.31 Lowest |
| 5.01 | Providing and laying, spreading and compacting 0.396m3 of 45-22.40mm & 0.528m3 of 22.40-2.36mm & 0.396m3 of 2.36mm and below metal graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in subbase/basecourse on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. MDU-CORP DATA-P-12 -SL No:8f(2025-26) | 10 | m3 | 3,436 ₹34,360 | 3,450 ₹34,500 | 3,274.88 ₹32,748.8 Lowest |
| 6.01 | Supplying and laying Rubberised interlocking Paver block M40 grade 80mm thick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with stone dust cushion below the uniform shapef approved non skitting surface in the to pand the rate including levelling the base preparation of pavers as sub base, stone dust cushion 150mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers, sweeping tranporting loading unloading of laying paver block as per standard specification.,(25-26, Page-18,sl.no-17) | 96 | m2 | 1,171 ₹1,12,416 | 1,180 ₹1,13,280 | 1,116.22 ₹1,07,157.12 Lowest |
| 7.01 | Add GST 18% | 1 | GST | 74,862 ₹74,862 | 76,052 ₹76,052 | 71,344.92 ₹71,344.92 Lowest |
Tender Value
₹4.9 L
EMD Value
₹4,915
Closing Date
19 Jan 2026, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai , Thallakulam , Madurai
Providing Paver Block Footbath Arrangements to Ganapathy Street Park at Namasivayam Nagar in Ward No.70 Zone 3.
2026_MAWS_638400_1
Z3 / E2 / EST.132 / 2025-26
Open Tender
Civil Works
Lump-sum
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,915
19 Aug 2026
5 Jan 2026
19 Jan 2026
5 Jan 2026
19 Jan 2026
5 Jan 2026
Amount
Earth work excavation for foundation in Hard stiff clay, stiff blackcotton, hard red earth, shales murram, gravel,stoney earth and earthmixed with small size boulders SS.20B and Sand, silt or other loose soil,wet sand,or silt not under water, light black cotton soil, sandy loamordinary soil and to full depth as may be directed except in hardrockrequiring blasting inclusive of shoring shuttering and baling out waterand cleaning and levelling the site etc.,complete 10 cum Building data25-26 Pg :2
Filling Gravel in layers of 25cm thick Including cost of gravel stacking for premeasurment watering and consolidation by power roller rolling using 11.60cum of gravel for 10cum for finishing the Work.Road Data Page:26,Sl/no:31.
Suppling and erecting shuttering with necessay supports for Plinth Beam with all cross bracings etc., complete ( Side Only) the payment for centering shall be given offer the concrete is laid vertical portion using steel plate.. Building Data 2025-26 Page:3 Sl.no;22
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (MSand)and four coarse aggregates) using 20mm size ISS HBG metalincluding cost and conveyance of all materials to site and including forthe mixing, laying and labour charges etc., complete as per standard specification Building Data 25-26 Page:2 Sl.no;12
Providing and laying, spreading and compacting 0.396m3 of 45-22.40mm & 0.528m3 of 22.40-2.36mm & 0.396m3 of 2.36mm and below metal graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in subbase/basecourse on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. MDU-CORP DATA-P-12 -SL No:8f(2025-26)
Supplying and laying Rubberised interlocking Paver block M40 grade 80mm thick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with stone dust cushion below the uniform shapef approved non skitting surface in the to pand the rate including levelling the base preparation of pavers as sub base, stone dust cushion 150mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers, sweeping tranporting loading unloading of laying paver block as per standard specification.,(25-26, Page-18,sl.no-17)
Add GST 18%
RAJESHKANNAN T (BID ID -1565566)
SHRIDURGA CONTRACTORS (BID ID -1565402)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
DOC.pdf
Tender Documents • 0.81 MB
BOQ_764042.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .