Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 LAccepted-AOC | ₹14.9 L | L1 | Accepted-AOC accepted |
| 2 | L2₹15.0 LRejected-AOC | ₹15.0 L | L2 | Rejected-AOC rejected |
| Sl No | Description | Qty | Unit | D M Srinivasab L2 | Raveendra g L1 |
|---|---|---|---|---|---|
| 1.00construction of compound wall bus depo kothakollakandigai Ramapuram in Podatur pet Town Panchayat | |||||
| 2.00 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification. | 95.19 | cu.m | 265 ₹25,225.35 | 263.78 ₹25,109.22 |
| 3.00 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 12.93 | cu.m | 5,678 ₹73,416.54 | 5,578.86 ₹72,134.66 |
| 4.00 | SUPPLYING And centering below ground | 64.18 | cu.m | 547.5 ₹35,138.55 | 547.5 ₹35,138.55 |
| 5.00 | Supply and Erecting of Centering including cost and conveyance and all materials and all labour charges etc,.Completed. | 101.87 | sq.m | 1,095 ₹1.1 L | 1,095 ₹1.1 L |
| 6.00 | supply and Fabrication of steel including all etc | 2.1 | cu.m | 91,944.7 ₹1.9 L | 91,944.7 ₹1.9 L |
| 7.00 | brick work in cement mortor 1:5 mix including all etc | 34.5 | sq.m | 6,164.26 ₹2.1 L | 6,164.26 ₹2.1 L |
| 8.00 | Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour | 510.21 | sq.m | 286.47 ₹1.5 L | 286.47 ₹1.5 L |
| 9.00 | colour washing two coats exterior emlusion etc | 510.21 | sq.m | 253.38 ₹1.3 L | 253.38 ₹1.3 L |
| 10.00 | RCC 1:1.5:3 mix using 20mm metal including etc | 35.79 | Mtr | 9,580 ₹3.4 L | 9,480 ₹3.4 L |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
30 Sept 2025, 3:00 pmClosed
Bdo pallipat
bdo pallipat
construction of compound wall Arround Bus depo at kothakollakandigai ramapuram in Podaturpet Town panchayat
2025_RDTN_608402_1
1927/2025/A2
Open Tender
Civil Works - Others
work
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,000
Yes
20 Feb 2026
24 Sept 2025
30 Sept 2025
24 Sept 2025
30 Sept 2025
24 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_727073.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid