Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.4 LAccepted-AOC | ₹37.4 L | L1 | Accepted-AOC Admitted |
| 2 | L2₹37.5 L+₹11,993.34 (0.32%)Rejected-AOC | ₹37.5 L+₹11,993.34 (0.32%) | L2 | Rejected-AOC Rejected |
| 3 | Rejected-Technical | - | - | Rejected-Technical 1_Balance Sheet Profit loss with UDIN Number not submitted_ 2_Experience in works of Similar nature and 50 persentage of the bid value is not Satisfied_ 3_Details of Construction Equipments_ Tools and Plants Vehicles are not enclosed Properly |
| Sl No | Description | Qty | Unit | Thiru.M.Gunasekaran L1 | Perumalsamy Contractor L2 |
|---|---|---|---|---|---|
| 1.001.Construction of Drainage with Cover Slab and Paver Block from Sri Lankan Refugees Camp Street-3 @ Kethunaickanpatti Village H/o. Moondrampatti - Rs. 19.000 Lakhs | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B | 151.8 | Cum | 164 ₹24,895.2 Lowest | 164 ₹24,895.2 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 27.6 | Cum | 5,494 ₹1,51,634.4 Lowest | 5,512 ₹1,52,131.2 |
| 4.00 | Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 62.1 | Cum | 5,762 ₹3,57,820.2 Lowest | 5,782 ₹3,59,062.2 |
| 5.00 | Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc., | 465.91 | Sqm | 544 ₹2,53,455.04 Lowest | 546 ₹2,54,386.86 |
| 6.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS | 0.97 | MT | 91,307 ₹88,202.56 Lowest | 91,620 ₹88,504.92 |
| 7.00 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs | 9.87 | Cum | 9,193 ₹90,734.91 Lowest | 9,224 ₹91,040.88 |
| 8.00 | Plastering with CM 1:5, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the | 103.5 | Sqm | 575 ₹59,512.5 Lowest | 577 ₹59,719.5 |
| 9.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 82.8 | Cum | 267 ₹22,107.6 Lowest | 268 ₹22,190.4 |
| 10.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 50.6 | Cum | 2,560 ₹1,29,536 Lowest | 2,569 ₹1,29,991.4 |
Tender Value
₹38 L
EMD Value
₹38,000
Closing Date
6 Aug 2026, 3:00 pmClosed
The Project Director
DRDA Krishnagiri
Krishnagiri DT - Package No.02 Srilankan Refugees Phase II 2024-25 - Uthangarai Block Construction of Drainage with Cover Slab and Paver Block at Street 3 and Street 4 at Srilankan Refugee Camp at Kethunaickanpatti Village Ho.Moondrampatti
2026_RDTN_686633_1
Roc_No_388_2022_R2_15_07_2026
Open Tender
Civil Works - Others
Item Rate
30 days
Uthangarai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹38,000
DRDA Krishnagiri
27 Aug 2026
17 Jul 2026
6 Aug 2026
17 Jul 2026
6 Aug 2026
17 Jul 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Construction of Drainage with Cover Slab and Paver Block from Sri Lankan Refugees Camp Street-3 @ Kethunaickanpatti Village H/o. Moondrampatti - Rs. 19.000 Lakhs | - | - | - | - |
| 2 | Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B | 151.8 | Cum | - | - |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 27.6 | Cum | - | - |
| 4 | Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 62.1 | Cum | - | - |
| 5 | Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc., | 465.91 | Sqm | - | - |
| 6 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS | - | MT | - | - |
| 7 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs | 9.87 | Cum | - | - |
| 8 | Plastering with CM 1:5, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the | 103.5 | Sqm | - | - |
| 9 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 82.8 | Cum | - | - |
| 10 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 50.6 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_825372.xls
BOQ • 0.37 MB
TBPAVERS02.pdf
Tender Documents • 0.93 MB
PBPAVERS02.pdf
Additional Documents • 0.33 MB
SrilankanCorri.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .