| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAdmitted-Finance | ₹10.6 L | L1 | Admitted-Finance |
| 2 | L2₹10.8 LAdmitted-Finance | ₹10.8 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | A.S.ENTERPRISES L1 | M.B. Enterprises L2 |
|---|---|---|---|---|---|
| 1.00 | Disconnecting of HT supply from main HT panel after proper switching off 11 KV MOCB discharging the supply. Complete drain out of transformer oil from transformer to empty oil drum by oil machine, dismantling of conservator tank all protection relays cable end boxes vent pipes and other items as required. | 1 | Job. | 28,435 ₹33,553.30 | 28,500 ₹33,630 |
| 2.00 | Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and re-insulation of weak point with the help of HT insulation material and proper taping etc. | 1 | Job. | 78,650 ₹92,807 | 81,000 ₹95,580 |
| 3.00 | Replacement of top cover gasket vertical vent gasket & missing hardware to stop the oil leakage. | 1 | Job. | 29,645 ₹34,981.10 | 30,000 ₹35,400 |
| 4.00 | Replacement of silica gel. | 1 | Job. | 3,300 ₹3,894 | 3,500 ₹4,130 |
| 5.00 | Checking & matching of control wiring of all protection relay calibration of bucchlaz relay and protection relay testing the same | 1 | Job | 17,545 ₹20,703.10 | 17,750 ₹20,945 |
| 6.00 | Complete assembling of transformer cleaning of complete transformer tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides with HI pot machine. | 1 | Job. | 33,275 ₹39,264.50 | 33,400 ₹39,412 |
| 7.00 | Repairing of tap changer | 1 | Job | 26,500 ₹31,270 | 27,000 ₹31,860 |
| 8.00 | Repairing of LT Copper bolt and pam, remettaling and finishing the same as per original shape and size. | 4 | Jobs | 96,600 ₹1.1 L | 97,200 ₹1.1 L |
| 9.00 | Filling of Transformer oil to up to top up level as required to Make Power. | 836 | Ltr. | 1,24,146 ₹1.5 L | 1,24,564 ₹1.5 L |
| 10.00 | P/Fixing of winding protection pad. | 1 | Set. | 19,965 ₹23,558.70 | 20,000 ₹23,600 |
Tender Value
Refer Docs
EMD Value
₹21,300
Closing Date
5 Feb 2026, 3:00 pmClosed
EXECUTIVE ENGINEER (EM) M-11
GREATER KAILASH, PART-I, NEW DELHI
Servicing / dehydration of 2000 KVA 11000/415 Volt Kirloskar make transformer no.2 at G.K. (South) BPS
2026_DJB_285678_2
NIT No. 24/EE(EM)M-11/(25-26)
Open Tender
Electrical Work/ Equipment
60 days
EXECUTIVE ENGINEER (E/M) M-11
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board
₹21,300
Yes
17 Feb 2026
27 Jan 2026
5 Feb 2026
27 Jan 2026
5 Feb 2026
27 Jan 2026
Disconnecting of HT supply from main HT panel after proper switching off 11 KV MOCB discharging the supply. Complete drain out of transformer oil from transformer to empty oil drum by oil machine, dismantling of conservator tank all protection relays cable end boxes vent pipes and other items as required.
Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and re-insulation of weak point with the help of HT insulation material and proper taping etc.
Replacement of top cover gasket vertical vent gasket & missing hardware to stop the oil leakage.
Replacement of silica gel.
Checking & matching of control wiring of all protection relay calibration of bucchlaz relay and protection relay testing the same
Complete assembling of transformer cleaning of complete transformer tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides with HI pot machine.
Repairing of tap changer
Repairing of LT Copper bolt and pam, remettaling and finishing the same as per original shape and size.
Filling of Transformer oil to up to top up level as required to Make Power.
P/Fixing of winding protection pad.
Repair of cooling fins, replacement of cooling fins gasket and oil seal for stopping the leakage.
Dehydration & filtration of complete transformer oil and checking the die electric strength up to 50 KV at site as required
Complete cleaning and chemically washing of oily and muddy transformer body and painting of transformer with enamel paint.
Repairing, modify & insulating the bus bar with epoxy paint
P/Fixing of Copper link for LT busbar
Repairing of bus ducting as per site requirement
P/fixing of Heat Shrinkable jointing kit for transformer HT cable an HT panel as per site requirement
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_378065.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid