| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L1 | Accepted-AOC Admitted |
| 2 | L2₹2.0 Cr+₹8.8 L (4.72%)Rejected-Finance KHALIHAMARI HOUSE NO NIL CITY TOWN DIBRUGARH P O KADOMONI P S DIBRUGARH DIST DIBRUGARH PIN 786001 ASSAM | DIBRUGARH | ASSAM | 786001 | ₹2.0 Cr+₹8.8 L (4.72%) | L2 | Rejected-Finance Rejected |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.9 Cr
EMD Value
₹3.7 L
Closing Date
6 Jan 2020, 2:00 pmClosed
C.E PWD (R)
Chandmari, Guwahati-3
Construction of RCC Br. Over Nefatula river near AMC Senior Madrassa on Bilbari L.P School in Nayagram Road under MLCSNA of RIDF-XXV of NABARD for 19-20 P No MLCSNA/RIDF-XXV/Karimganj/01
2019_PWD_15331_2
CE/STBR/NAB/ RIDF-XXV/17/19-20/05
Open Tender
Civil Works
Item Rate
540 days
Karimganj
Please refer Tender documents.
6 documents required · 6 mandatory
₹6,000
Yes
Assam State Road Board
₹3.7 L
Yes
19 Jun 2020
16 Dec 2019
8 Jan 2020
16 Dec 2019
6 Jan 2020
16 Dec 2019
16 Dec 2019 - 6 Jan 2020
Amount
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department.
Foundation : 'Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom,backfilling the excavated earth to the extent required and utilising theremaining earth locally for road work.) (I) Ordinary Soil A) Manual means I) With dewatering i) above 6.0m depth
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1000 mm) (A)without plasticiser
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a). Initial and Routine load test.
Levelling course for pile cap
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification. Without Plasticiser RCC Grade M25 Using Concrete mixer .
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)
Substructure : 'Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork , (N) without plasticiser RCC Grade M25 Height upto 5m 'Case I : Using concrete Mixer
Supplying, fitting and placing uncoated TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
Superstructure : 'Furnishing and Placing Reinforced cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. N. Without Plasticizer For RCC T Beam and Slab B. RCC M-25 Grade I. Using Concrete Mixture i) Height upto 5m
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequat space between vertical posts for expansion, complete as per approved drawings and technical specifications.
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation).
Drainage Spouts complete as per drawing and Technical specification
Reinforced cement concrete approach slab including reinforcement and form work complete as per drawing & technical specification . B. TMT-IS 1786(Fe-500) Secondary producer (ISI approve)
Protection Work: ' Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighting not less than 40Kg each.)
Providing and laying Pitching on slopes laid over prepared filter media as per drawing and Technical specifications clause 1302(A) Stone/Boulder
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification clause 1302
Approach work: Construction of embankment with approved material obtained from borrow pits with all lifts and leads, upto 1.5m,transporting to site, spreading, grading to required slope and compacting to meet requirment of table 300-1 and 300-2 with lead upto 100m as per technical specification.
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2 with upto 1000m as per technical specification clause 303-1(i)private land
Granular Sub-base with Close Graded Material (Table:- 400-1) 'Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density,complete as per cl. 401( Including cost of testing of materials at site and laboratory as directed by the deptt.) for grading- I Material
Water Bound Macadam grading 2: Using Screening Type-B (11.2mm Agg.)for Gr. II (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density Grading 3 as per technical specification clause 405 (A) By manual means
Water Bound Macadam grading 3: Using Screening Type-B (11.2mm Agg.)for Gr. III (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density Grading 3 as per technical specification clause 405 (A) By manual means
Prime coat (Providing and applying primer coat with bitumen emulsion(SS-1) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per technical specificationclause 502. (i)low porosity
Providing and applying tack coat with bitumen emulsion using emulsion (RS-1) distributor at the rate of 0.20-0.25 kg per sqm on the prepared bituminous/granular surface cleaned with Hydraulic broom as per technical specification clause 503.
Open - Graded Premix Surfacing (Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen to required line, grade and level to serve as wearingcoarse on a previously prepared base, including mixing in a suitable plant laying and rolling with a smooth wheeled roller 80-100 KNstatic roller capacity, finished to required level and grades to be followd by seal coat of either Type A or Type C as per technical specification clause 508.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified level, grades and crossfall using TypeA and B seal coats as per technical specification clause 510.
Erecting sign board
Carrying out Sub Soil investigation (SSI) for all type of soil (except boring in rock) upto depthof 30 m or refusal (N=100) for each foundation location as per IRC 78-2014 and submission of SSI report to the Engineer in charge for approval . Preparation & submission of Design calculation & Drawings of foundation , sub structure,Super structure as relevant IRC Codes and SSI Report , 2( two) each of Design& Drawing of each bridge to be submitted for approval and 8 ( eight)copies after approval of competent authority.
MS MANAB JYOTI GOGOI AND CO.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .