Loading…
Loading…
Tender ID
Tender Value
₹12.3 L
EMD Value
₹24,600
Closing Date
11 May 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EE ICD KARWI CHITRAKOOT
Construction of drainage syphon at km 4.05 of ichauli minor I.
2026_UPIDC_1141991_10
01/EE/2026-27
Open Tender
Civil Works
Item Rate
90 days
Distt Mahoba
AS PER NIT
2 documents required · 2 mandatory
₹854
₹24,600
29 May 2026
27 Apr 2026
11 May 2026
27 Apr 2026
11 May 2026
27 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. | - | - | - | - |
| 1 | E/w excavation in foundation of MKR mixed soil including initial lead and lift etc. all complete. But excluding GST. | 785.32 | Cum | 119.5 | ₹93,845.74 |
| 2 | Supply and laying of coarse sand in foundation/floor including all cost of material labour T&P etc . All complete. But excluding GST. | 24.6 | Cum | 1,841.29 | ₹45,295.73 |
| 3 | Laying C.C. work 1:3:6 with cement course sand and stone grit 25 to 50 mm including all cost of material, labour, T&P and proper completion of work.But excluding GST. | 51.18 | Cum | 4,237.22 | ₹2,16,860.92 |
| 4 | R.C.R. Stone masonry with 1:4 cement course sand including all cost of material, labour: T&P and proper completion of work.But excluding GST. | 124.79 | Cum | 4,823.3 | ₹6,01,899.61 |
| 5 | Laying C.C. work 1:2:4 with cement course sand and stone grit 10 to 20 mm including all cost of material, labour, T&P and proper completion of work.But excluding GST. | 6.16 | Cum | 5,092.64 | ₹31,370.66 |
| 6 | Dry stone pitching with all cost of labour material T&P etc. required for completion of work. | 7.6 | Cum | 2,626.5 | ₹19,961.4 |
| 7 | Supply and laying 1000 mm dia RCC Hume pipe including all cost of loading unloading carriage, all material, collor joint with cement jute labour etc. All complete. But excluding GST. | 17.5 | RM | 8,386.8 | ₹1,46,769 |
| 8 | Centering and Shuttering of C.C. Work including all material, labour T&P etc. all complete. But excluding GST. | 47.96 | Sqm | 817 | ₹39,183.32 |
| 9 | Raised struck cement pointing in 1:2 CM including all cost of material, labour, T&P and proper completion of work.But excluding GST. | 95.44 | Sqm | 124.83 | ₹11,913.78 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.31 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.79 MB
NIT01.pdf
Tender Documents • 2.78 MB
BOQ_2132955.xls
BOQ • 0.29 MB
Carri02.pdf
PDF • 0.45 MB
Carri01.pdf
PDF • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .