Tender Value
₹60 L
EMD Value
₹1.1 L
Closing Date
23 Jul 2026, 6:00 pm
Col Amit Bhardwaj
HQ CWE Jammu PIN-180003
CLEANING AND REPAIRS OF SEWAGE LINES, SEPTIC TANKS, SOAKAGE WELL, MANHOLE INCLUDING REPLACEMENT OF SEWAGE LINES ETC. AT Y STN, MH AND RAIPUR SATWARI UNDER AGE B/RII OF GE SATWARI
2026_MES_774675_1
CWE/T-56/2026-27
Open Tender
Civil Works
270 days
GE Satwari
As per tender documents
9 documents required · 9 mandatory
₹1,000
GE Satwari
₹1.1 L
Yes
25 Jun 2026
25 Jun 2026
25 Jul 2026
25 Jun 2026
23 Jul 2026
16 Jul 2026
25 Jun 2026 - 29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning/ clearing of sewage line (including manholes) 150 mm to 300 mm main line from 1st floor manhole onwards bore of any description, underground at any depth, removing any type of blockage including , Desludging, descaling & dechoking of drain as well as manholes with combined high pressure water jetting cum suction (vacuum) type machine mounted on LCV/HCV and having facilities of high pressure vacuum and provn of hydraulic through high pressure thermo plastic fiber based water jetting hose and conical round shape nozzle pipe and flushing after cleaning including removing the same in the tank to a place outside cantonment at the place meant for the local municipality, all as directed by Engr-in-Charge.
Note:- 1. From Item No 1 to 3, the contractor shall keep the sewage line functional throughout the contract period. The unit rate quoted by the contractor shall deemed to be inclusive this aspect.
2. The contractor or his authorized representative shall attend the daily basis complaints of AOR of AGE B/R and rectify the same with the completion on same day within 08 Hrs from the receipt of complaint. | 2,000 | RM | - | - |
| 2 | Description all as per Srl item No 1 here in before but cleaning done by manual labour of bore of pipe 150 to 300 mm from 1st manhole.
Note:- The contractor or his authorized representative should also attend the daily basis complaints of AOR of AGE B/R and rectify the same with the completion on same day within 08 Hrs from the receipt of complaint. | 7,000 | RM | - | - |
| 3 | Description all as per srl item No 1 here in before but cleaning done by manual labour of bore of pipe 75 mm to 150 mm from 1st manhole.
Note:- The contractor or his authorized representative should also attend the daily basis complaints of AOR of AGE B/R and rectify the same with the completion on same day within 08 Hrs from the receipt of complaint. | 3,000 | RM | - | - |
| 4 | Cleaning of blocked WC/Kitchen & Bath/floor trap/Gully traps op to 1st manhole with manual labour as well flushing with clean water making the WC seat operational, including depositing sludge in borrow pits including digging of pits. Covering with excavated earth at a suitable depth all as specified and directed by Engr-in - charge.
Note:- 1. The contractor or his authorized representative shall attend the office on every working day to take complaints from AGE/JE (Maint) and will rectify the same with the completion on same day with in 08 official working Hrs from the receipt of complaint. If the contractor will not rectify the complaint in same day , the recovery of Rs 200.00 per complaint per day will be levied . 2. The contractor shall provide 02 Nos Safaiwala to AGE B/R-II from 0900 Hrs to 1700 Hrs even on sundays and holidays to attend emergency complaints. No extra payment shall be admitted for working on Sunday/Holidays. | 5,000 | Each | - | - |
| 5 | Cleaning of septic tanks completely by emptying liquid contents including cleaning of inlets, outlets and getting out by using suction pumps and filling the foul material into the covered tanks attached to suction pump and removing and disposing the same at a place meant for disposal of foul meterial out side the cantonment area all as directed.
Note:- Cubic content of filled up portion of septic tank i.e liquid only shall be measured. | 60 | Cum | - | - |
| 6 | Cleaning of septic tanks completely by emptying semi solid, solid foul contents including cleaning of inlets, outlets and getting out by using suction pumps and filling the foul meterial into the covered tanks attached to suction pump and removing and disposing the same at a place meant for disposal of foul meterial out side the cantonment area all as directed. Note:- Cubic content of filled up portion of septic tank i.e semi solid and solid contents only shall be measured. | 30 | Cum | - | - |
| 7 | Cleaning of manholes by manual labours completely by emptying semi solid, solid foul contents including cleaning of inlets, outlets. making the manholes clean for free flow of sewage water and removing and disposing the same at a place meant for disposal of foul material out side the cantonment area including taking out and refixing the manhole cover all as directed. | 500 | Each | - | - |
| 8 | Supply and fixing in repair cast iron oval door access for reqd dia pipe fitting including necessary drilling, nut & bolt. provision of rubber washers to make the joint water complete all as specified and directed.
Note :- Work to be carried out up to 4th storey bldg in any condition of working space/area. | - | - | - | - |
| 9 | All as per Serial item No. 08 above but 100 mm dia. | 60 | Each | - | - |
| 10 | All as per Serial item No. 08 above but 75 mm dia. | 50 | Each | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_867446.xls
BOQ • 0.37 MB
Tender56_merged.pdf
Tender Documents • 2.04 MB
Download all tender documents and submit your bid