Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-Finance | ₹2.7 L | L1 | Accepted-Finance L1 (additional rebate) |
| 2 | L2₹2.7 LAccepted-Finance | ₹2.7 L | L2 | Accepted-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4 L
EMD Value
₹8,000
Closing Date
26 Feb 2026, 6:00 pmClosed
Executive Enigneer
pwd division udhampur
IPS Lane to Lehard Bowli (Under UT Capex Permanent Restoration)
2026_PWDJK_303985_33
ENIT No. 149 of 2025-26 dated 20.02.2026
Open Tender
Civil Works
30 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD Division Udhampur
₹8,000
19 Mar 2026
20 Feb 2026
27 Feb 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, 1 meter from cutting edge All kinds of soil
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering -- All work upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone agg. 20 mm nominal size) crushed. Incl. 20% Plum
Centering and shuttering including strutting, propping etc. and removal of form work for
Foundations, footings, bases of columns etc. for mass concrete
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate.
12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 coarse sand)
Slip clearance in soils; mixed with moorum/ Kankar/ shingle/ boulders; disposal lead upto 50 m and lift upto 1.5 m
Carriage of material by M.T incl loading/unloading & stacking complete
Sand avg lead 45 km
Stone agg below 40 mm nominal size avg lead 10 km
Disposal of mulba av lead 5 km
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_987553.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid