Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance 202 400 602 | THANE | MAHARASHTRA | 400601 | -9.99% | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹9.3 L (6.40%)Admitted-Finance | -4.23% | ₹1.5 Cr+₹9.3 L (6.40%) | L2 | Admitted-Finance |
Tender Value
₹1.6 Cr
EMD Value
₹1.5 L
Closing Date
17 Aug 2026, 3:00 pmClosed
Additional Comissioner
PMC Office, Panvel
as per tender
2026_PMC_1326214_1
PMC/SEWERAGE/65/2026-27
Open Tender
Civil Works - Others
Percentage
365 days
PMC Area
as per tender
3 documents required · 3 mandatory
₹2,360
₹1.5 L
15 Sept 2026
7 Aug 2026
18 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Decanter Assembly and Air Diffuser for C- Tech basin Work | |||||
| 1.01 | 1) Providing, erecting, Testing and commissioning of decanter and diffuser repairs & replace works of C tech basin as follows-
a) Overhauling of Decanter -
i) Replacement of Worm Shaft | - | Nos | - | - |
| 1.02 | ii) Replacement of Worm wheel | - | Nos | 0.29 | - |
| 1.03 | iii) Replacement of Bearing set, O-ring set and shaft seal | - | Nos | - | - |
| 1.04 | iv) Replacement of Rubber bellow | - | Nos | - | - |
| 1.05 | v) Replacement of Spider | - | Nos | - | - |
| 1.06 | 2.Minipanel Diffuser with UPVC grid | - | Nos | - | - |
| 1.07 | 3.PLC CPU for Ctech basin - 2, nos,4.Ethernet communication Module -3 nos ,5.Redundancy Module for PLC-2 nos ,6.Redundant Power module -1 no,7.Power module cables -2 nos,8.Analog Output Module-1 no | - | Job | 0.61 | - |
| 1.08 | ii) In addition to the cost of materials, charges towards loading of materials from the godown, including insurance, packing, transportation to the site, and unloading at the site shall be considered @ 5%. Third Party Inspection (TPI) charges and Manufacturer’s inspecting agency charges for routine and performance testing of equipment shall also be included. Furthermore, erection, commissioning, and testing charges for the above materials shall be added @ 5%. | - | Job | 0.87 | - |
| 1.09 | iii) Supplying, erecting of Power cable & communication cable required for the work of Decanter and allied work a) Power Cable Designing, Supplying, Installing, commissioning & testing with Terminating & Interfacing of 2 C x 1.5 sq.mm as per IS 694 twisted shielded copper armoured conductor on wall in GI tray or in ground suitable for supplied D. C. Voltage | - | Mtr | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
JalHiAmrit2ndCall.pdf
Tender Documents • 1.25 MB
BOQ_2271185.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .