Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.7 LAccepted-AOC FLAT NO 402 4TH FLOOR BLDG NO 31 HANSGEET CO OP HSG SOCIETY PANT NAGAR GHATKOPAR E MUMBAI 400 075 | MUMBAI SUBURBAN | MAHARASHTRA | 400075 | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹31.6 L+₹4.2 L (15.5%)Rejected-Finance ROOM NO 997 GALI NO 3 PART NO 3 GANESH MURTHY NAGAR CUFFE PARADE COLABA MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | L2 | Rejected-Finance Other than being lowest | |
| 3 | L3₹36.3 L+₹8.9 L (32.7%)Rejected-Finance | L3 | Rejected-Finance Other than being lowest | |
| 4 | L4₹39.4 L+₹12.1 L (44.1%)Rejected-Finance | L4 | Rejected-Finance Other than being lowest | |
| 5 | L5₹41.0 L+₹13.7 L (50.0%)Rejected-Finance FLAT NO A 102 ASHOKVAN RAJSHIV CO OP HSG SOC SHIV VALLABH ROAD DAHISAR EAST MUMBAI 400 068 | MUMBAI SUBURBAN | MAHARASHTRA | 400068 | L5 | Rejected-Finance Other than being lowest |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
27 Jul 2022, 6:00 pmClosed
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
REPAIR TO FLOORING TILING PLUMBING SANITARY FITTING WOODEN ALUMINIUM JOINERY TO CERTAIN BUILDINGS AT NEW RS COLABA UNDER AGE B R II GE (NW) NAVY NAGAR COLABA MUMBAI
2022_MES_530810_1
8288/CWE (NW) Mumbai/ E8
Open Tender
Civil Works
Item Rate
180 days
GE (NW) Navy Nagar
Class C
8 documents required · 8 mandatory
₹1,000
Yes
GE (NW) Navy Nagar
₹1.2 L
Yes
15 Sept 2022
14 Jun 2022
29 Jul 2022
14 Jun 2022
27 Jul 2022
13 Jul 2022
14 Jun 2022 - 7 Jul 2022
Amount
Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust, etc complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Brushing neat cement slurry with 3.0kg of cement per sq. metre complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Non - skid Ceramic tiles 7 to 8 mm thick and size not less than 395mm x395mm, in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match including bedding layer of mortar 15mm thick in CM 1:6 for laying floor finishes complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Non - skid Ceramic tiles 7 to 8 mm thick and size not less than 395mm x395mm as in skirting etc set and jointed in neat cement slurry and pointed in white or coloured cement to match with colour of tiles over and including 10mm thick CM (1:4) as in backing coat complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking down chowkats with shutter (without taking off shutter from the frame) not exc 1.5 sqm each complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing powder coated anodised aluminium frame/track or shutters for windows, ventilators etc. with one or more rebates including joining cleat for fixing etc.fixed or sliding type/louvered window or ventilator without sash bar, aluminium including necessary joining cleats, glazing clips, rubber packing, anodised alumnium snap beading, screws and locking arrangement etc complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing aluminium alloy wire mesh 0.45 mm nominal dia of wire and average width of aperture 1.4 mm fixed with aluminium wire staples alu shutters complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 4 mm thick figured glass pin headed type and glazing with aluminium and neoprene beads in square not exc 0.5 sqm in each pane complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 4mm thick plain sheet glass ordinary quality and glazing with aluminium and neoprene beads in square n. exc 0.5 sqm in each pane complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour aluminium anodised powder coated grill with suitable aluminium anodised frame section manufactured by M/S Deco grill pattern DG-102 (7.5mm dia and aparture 50mm) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing for machine cut kota stone slab single piece length as in jambs/cills/lintel of windows 18-20mm thick laid and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and mirror polishing (Note : kota stone single pice of Cill will be fixed in two steps) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repair Vitreous China Ware Wash hand basin white, flat back, size 550 x 400 mm size (flat back or angle back type) including cutting for and pinning ends of brackets or erecting stand complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repair 32 mm dia., Waste fittings, brass chromium plated for glazed ware sinks, wash basins etc., with long screwed shanks and fly nuts, flange end bedded in red lead cement and other end fixed complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repair pillar tap15mm, cast copper alloy fancy type chromium plated, screwed down, high pressure, screwed both ends for iron pipe or for unions and fixed complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 32mm dia LDPE PVC waste pipe of pressure rating 6 kgf/cm2 fixed complete for WHB including socket & screw complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repair PVC connection 15mm size with PTMT nuts of length 450mm complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repair for ISI marked 15mm bore stop valves /angle valve, fancy type, cast copper alloy, chromium plated screwed both ends for iron pipe or for unions and fixed complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking up or down 15mm bore steel tubing and connections, including cleaning for refixing or removal to store complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supplying and laying of GI tubing Dia 15mm medium weight incl fittings on walls / ceilings or Laying in floors complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Re-fixing old steel tubing and connection in new or old position (Wall, ceiling, floors etc) of 15mm bore complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking down chowkats with shutter (without taking off shutter from the frame) exc 1.5 sqm but n exc 4 sqm each complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 2nd class hard wood plain, solid, straight chowkats and frames, wrought, framed rebated on the solid, rounded or chamfered, put together with glue pinned at joints complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking down shutters of any description n exc 1 sqm each complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking down shutters of any description exc 1sqm but n exc 2sqm each complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing factory made shutter 30 mm thick second class hard wood glazed and skelton shutters open rebated and prepared to receive glass, gauze etc edges of framing, plain chamfered or rounded fitted with cut and mitred beads fo securing glass/gauge etc of members of shutters as specified in SSR part I section 8 clause 8.24 complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing factory made shutter 35 mm thick second class hard wood glazed and skelton shutters open rebated and prepared to receive glass, gauze etc edges of framing, plain chamfered or rounded fitted with cut and mitred beads fo securing gauge etc suzes of members of shutters as specified in SSR part I section 8 clause 8.24 (a) complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 35mm thick second class hard wood factory made plain framed panelled shutters (two or three panes) with lock rail and panel of 9mm BWP commercial ply or 12mm veneered particle board medium density with commercial veneering both face. The size of rail shall be as per IS 1003 (Part-I) kiln seasoned and chemically pressure treated all as specified and directed.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 35 mm thick factory made flush shutters, solid core constrution with block board core and plywood face panels, commercial type on both side complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing Aluminium wire cloth, 0.45mm nominal dia of wire and average width of aperture 1.40mm, cut to required size and fixed to doors,windows shutter (wooden/aluminium), with wooden beading (any size)or aluminium wire staples and removing old beading, complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 3mm thick plain sheet glass ordinary quality and glazing fitted in wooden window n.exc 0.5 sqm in each pane incl necessary beading for securing glass complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing for in repair 18/19mm thick prelaminated particle board, exterior grade, prelaminated one side with decorative choice lamination & other side balancing white lamination, fixed with screws to timber frame work incl 18/19mm wide and 6mm thick external teak wood lipping fixed with nails and glue to board as in cup board shutter, CB shelves and kitchen cabinate etc like work complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing Continuous (piano) hinges, mild steel, bright finish or electro galvanised, width of flaps when open in 30mm complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing magnatic door catches including letting in complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 125mm size hasp and staple safety type, aluminium anodised with mild steel hinge pin including bolt to hinge plate and fixed with screws complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 100mm size stainless steel medium weight butt hinges complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 75mm size stainless steel medium weight butt hinges complete all as specified and directed by Engr-in-Charge
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 125 mm extruded aluminium handles, fabricated type anodised complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 100 mm extruded aluminium handles, fabricated type anodised complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 150mm aluminium anodised barrel tower bolts of extruded section complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 100mm aluminium anodised barrel tower bolts of extruded section complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 300 mm long aluminium alloy, anodised sliding door bolt with hasp and staple ( bolt type ) and fixing bolt and sliding bolts of extruded section or cast aluminium alloy complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing MS 300mm ordinary rat tail rod pattern springs including roller & roller plate complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing 140 mm overall length floor door stopper of aluminium alloy body and tongue, anodised with hard drawn steel spring, fixed in floor all complete as specified and as directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repair magic eye fancy type of brass for door including drilling cutting of holes and making good all complete as directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing mild steel hold fasts, wall ties and similar small articles conforming to Fe 290 Gde E-165 complete as specified and as directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour Providing PCC 1:3:6, type B1(20mm graded stone aggregate) for hold fasts complete as specified and as directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for two coat synthetic enamel paint over a coat pink primer on new wooden surface of any description over 10 cm width or girth not otherwise described including preparation of surface complete as specified and as directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Demolition of lime concrete of any description and in any position not otherwise specifically provided for complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour cement concrete 1:5:10 E2 type with with 40mm graded stone coarse aggregate in sunken floor complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Treatment of sunken floor slab comprises of the following specifications and all as specified (i) Material and labour for cleaning of the sunken /lowered portion of the RCC slab surface (including vertical total depth plus skirting height) of floors by wire brush, chiesel out any mortar sticking to the surface and brooming / washing completely. 40 mm avg thik pcc 1:2:4 type B-0 using 12.5 mm graded aggregate as in padding conc to achieve proper slope including 50 mm dia 350 mm long medium grade GI pipe spouts with wire guage on inside mouth to be fixed (ii) Rendering of uneven surfaces with 6 mm thick CM 1:4 mixed with and incl integral WPC @3% of weight of cement consumed. fill it with water and check dampness and seepage. where dampness and seepage noticed nozzles shall be fixed and grouting carried out (iii) All junctions points of side walls where CI/GI pipes are passing through shall be sealed with epoxy putty
(iv) After drying putty wash the slab and sides of sunken portion with water and make it clean and clear (v) Material and labour for applying two coat of polymer modified cementious water proofing coating as per manufactures instructions to bottom and vertical sides up to finished flooor level +100 mm height. The thickness of two layer shall be 1 mm. When the second layer is still sticky , coarse sand spry shall be carried out or vertical and bottom surface of the sunken portion all as specified and directed.
(vi) Plaster the bottom and sides up to bottom of the skirting with minimum 20 mm thk cm 1:4 mixed with and incl integral WPC 3 % of cement consumes as per manufacures specification including rounding of corners and junctions sloping towards spout Note:Test the water proofed area (ponding test) by filling water for atleast 72 hours and tested for leakage seepage and to the entire satisfaction of GE . Test shall be done in presence of reps of PMG and record for each sunken slab shall be maintained. the treatment shall be carried out by authorised applicators of chemicals.
(vii) All pipes laid in sunken portion shall be covered with 50 mm thk PCC 1:3:6 all around after painting with anticorrossive black japan paint (viii) Height up to and including 14th floor
Material and labour Dismantling floor, hearth, or wall tiling incl cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour non skid coloured ceramic tiles 300 x 300 x 6 to 7mm in floors set and jonted in neat cement slurry and pointed in white or colour cement to match the colour of tiles over and including 15mm thick cement mortar screed bed in CM 1:6 complete all as specified and directed by Engineer-in-Charge.
(a) Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for glazed ceramic coloured tiles as in dado like WC, Bath, Kitchen etc of size 300 x 200 x 7mm thick set and jointed with neat cement slurry and pointed with white cement, including 10mm thick rendering in CM 1:4 as backing coat complete all as specified and directed by Engineer-in-Charge.
(a) Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour in repair CI Floor trap dia of outlet 75mm with CP grating including jointing to waste pipe fixed in cement concrete type B-1 (1:2:4) complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repair vitreous china squatting pan 'Orissa pattern' long pan of size 580x 440mm with integral foot rests white with 'P' or 'S' with cement joint,front or back inlet incl connection to trap and to flushing pipe,anti-syphonage pipe and making good the floor to match the existingcomplete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking out of existing PVC cistern and refixing after tiling work with new flushing pipe of suitable length, and PVC connection of suitable length complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking out of existing WHB and pillar tap and refixing after tiling work with new bracket complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Removing demolished material exc 5 Km but n.exc 15 Km and depositing where directed by Engr-in-Charge. Note: Work shall be carried out upto G+14 storey building. Rate including scaffolding and safety net cloth at places.
satguruenterprises
SATYANARAYAN CONSTRUCTION
Shetty Construction Co
BOB ENTERPRISES
M/s. MAYUR ENTERPRISES
SHREE JAGDISH FURNITURE CO.
PRABHU ASSOCIATES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .