| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71,638Accepted-Finance 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | L1 | Accepted-Finance Being Lowest Bidder | |
| 2 | L2₹74,186+₹2,548 (3.56%)Rejected-Finance BHAGWATI NAGAR JAMMU | L2 | Rejected-Finance Not Lowest Bidder | |
| 3 | L3₹76,685+₹5,047 (7.05%)Rejected-Finance BHAGWATI NAGAR JAMMU | L3 | Rejected-Finance Not Lowest Bidder |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
9 Feb 2021, 2:00 pmClosed
Executive Engineer
Executive Engineer MID Jammu
Repairs to electric sub station and suction pipeline of pumping unit no 2, installed at Lift irrigation station Pindi Sarocha old.
2021_IFC_114968_1
MID/J/e-NIT/2020-21/88
Open Tender
Repair and Maintenance Works
Lump-sum
15 days
Pindi sarochana Old
As per tender notice
7 documents required · 7 mandatory
₹200
Executive Engineer MID Jammu
₹2,000
Yes
Jammu
17 Feb 2021
30 Jan 2021
10 Feb 2021
30 Jan 2021
9 Feb 2021
2 Feb 2021
30 Jan 2021 - 9 Feb 2021
1 Feb 2021
Amount
Carriage and shifting of 100 kva transformer to workshop for repairs by way of disconnecting the input and output power connections, lifting of electric transformer from its installed position by using manual labour, crane and then shifting to workshop by using carriage vehicle. Shifting back after carrying out repaired transformer to site. The job includes loading and un-loading of transformer at LIS Pindi sarochana old and workshop, manual labour, carriage charges of vehicle (to & fro), tools & tackles, hire charges of crane. Complete job.
Repairs to the 100 kva transformer by way of dismantling transformer at workshop and extracting out the damaged coils, LT bushes, HT bushes, rubber gasket, copper nuts and bolts. Rewinding of all HT coils with standard gauge with proper insulation & taping. Reconditioning of 3 no’s LT leg coils using quality insulation material. Repairs to core of transformer by extracting damaged and flashed core material and replacing it with fresh core material. Heating repaired transformer in oven to get required megger value. Properly cleaning the oil tank with scrubbers to remove all carbon deposits. Lowering of the coils inside the sump of the transformer. Providing and fitting of LT and HT bush rod sets, new insulator, rubber gasket, new copper nuts and bolts. Refitting of the top cover of transformer by providing and fitting of new gasket sheet. Filling with 150 liters of fresh transformer oil. Testing the continuity of each phase and secure all connection. The job includes the cost of materials, labour charges, testing on no load and full load, tools and tackles used during the execution of job.
Replacement of suction pipeline of pumping unit no 2 by way of dismantling existing pipeline with the help of gas cutter. Fitting of new 200 mm diameter suction pipe 6 meters in length ( to be provided by department). Welding of 200 mm dia flanges on suction side of pumping unit. Total number of 200 mm dia flanges required is 4 numbers. The job includes excavation cost of pipe, cost of laying of pipes, charges of welding, labour charges, carriage charges of old pipes from lift irrigation station to road side and then to department store.
Rebate on old parts
M/S FASTTRACK ENGINEERS
PERFECT ELECTRICAL WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .