| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LQualified LINK ROAD AKHNOOR FLOOR AKHNOOR LINK ROAD AKHNOOR LINK ROAD AKHNOOR AKHNOOR JAMMU JAMMU AND KASHMIR 181201 | JAMMU | JAMMU AND KASHMIR | 181201 | L1 | Qualified | |
| 2 | L2₹3.7 L+₹52,332 (16.4%)Qualified 01 PATHWALIYA GONDA GONDA GONDA UTTAR PRADESH 271001 | GONDA | UTTAR PRADESH | 271001 | L2 | Qualified MSE, Category: General | |
| 3 | L3₹4.3 L+₹1.1 L (33.0%) H NO 188 3 RAKESH KUMAR RAIPUR SATWARI JAMMU CANTT JAMMU JAMMU JAMMU KASHMIR 180003 | JAMMU | JAMMU AND KASHMIR | 180003 | L3 | - | |
| 4 | Qualified H NO 188 3 RAKESH KUMAR RAIPUR SATWARI JAMMU CANTT JAMMU JAMMU JAMMU KASHMIR 180003 | JAMMU | JAMMU AND KASHMIR | 180003 | - | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
4 Jan 2025, 10:00 amClosed
Demolishinf of Old CSD Wall dimensions is 17 witdth x 11ft height and ESM CELL entrance Door ONE Sided
Earthwork Digging 18x18 plinth or filling with concrete and construction of wall make 17ft width x 14 ft height with water proofing Cement plastering
Construction of Wall and closed Dorr old side and Shifting to new new side left side
Brick wall work closed to Entrance partition of new csd to new Room and closed by brick work 2 ventilation window
Construction of brick wall on top of ESM cell on top roof one side to shed level dimension is 15 width x 4 height x 4 inch covering gapping to roof
Floor Tiling Vitrified 24 inch x 24 inch with installation
Removal of window AC to Right side
Demolishing of new csd Wall only window and 3 feet down and make sloping to new room
PVC panel on walls similar Shade as old CSD 10 ft height
Ceiling 2x2 in from floor tp roof height is 10 up to floor
Distempering both sides of wall or glass remove old and installed to new wall
7248424
GEM/2024/B/5706405
Two Packet Bid
Brick wall work closed to Entrance partition of new csd to
15 days
Jammu, Jammu And Kashmir
Total value wise evaluation
BOQ
4 documents required · 4 mandatory
50%
Exempted
14 Dec 2024
14 Dec 2024
4 Jan 2025
Demolishinf of Old CSD Wall dimensions is 17 witdth x 11ft height and ESM CELL entrance Door ONE Sided
Earthwork Digging 18x18 plinth or filling with concrete and construction of wall make 17ft width x 14 ft height with water proofing Cement plastering
Construction of Wall and closed Dorr old side and Shifting to new new side left side
Brick wall work closed to Entrance partition of new csd to new Room and closed by brick work 2 ventilation window
Construction of brick wall on top of ESM cell on top roof one side to shed level dimension is 15 width x 4 height x 4 inch covering gapping to roof
Floor Tiling Vitrified 24 inch x 24 inch with installation
Removal of window AC to Right side
Demolishing of new csd Wall only window and 3 feet down and make sloping to new room
PVC panel on walls similar Shade as old CSD 10 ft height
Ceiling 2x2 in from floor tp roof height is 10 up to floor
Distempering both sides of wall or glass remove old and installed to new wall
CONSTRUCTION WORK
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7248424.pdf
GEM_BID
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
docscanner_14-dec-2024_08-49_am_2024-12-14-09-11-11_fb3b3a28dfb1241656744ea9beb0b52f.pdf
BOQ
construction_2024-12-14-09-11-11_f5fbb6731de05077135fb265de94c490.csv.pdf
BOQ
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .