| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC S 79 OKHLA INDUSTRIAL AREA PHASE II NEW DELHI 110020 | SOUTH EAST | DELHI | 110020 | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.1 Cr+₹72.1 L (52.5%)Rejected-Finance 19 20 VARDHMAN INDUSTIRAL ESTATE LBS MARG VIKHROLI WEST MUMBAI MAHARASHTRA 400083 | MUMBAI SUBURBAN | MAHARASHTRA | 400083 | ₹2.1 Cr+₹72.1 L (52.5%) | L2 | Rejected-Finance L2 Bidder |
| 3 | L3₹2.4 Cr+₹1.1 Cr (78.1%)Rejected-Finance 9 C 8 SECTOR 7 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | ₹2.4 Cr+₹1.1 Cr (78.1%) | L3 | Rejected-Finance L3 Bidder |
| 4 | Rejected-Technical 501 DELTA TECHNOLOGY STREET HIRANANDANI GARDENS POWAI MUMBAI 400076 | MUMBAI SUBURBAN | MAHARASHTRA | 400076 | - | - | Rejected-Technical Not Meeting in NIT and Tender Criteria |
| 5 | Rejected-Technical 13 BANDAL COMPLEX PAUD ROAD PUNE PUNE MAHARASHTRA 411038 | PUNE | MAHARASHTRA | 411038 | - | - | Rejected-Technical Not Meeting in NIT and Tender Criteria |
Tender Value
₹2.5 Cr
EMD Value
₹5.0 L
Closing Date
13 Nov 2024, 6:00 pmClosed
SM (E-E)
JPNI Airport, Patna
Construction of New Terminal Building and Other Allied structures Phase I and II at Patna Airport SH SITC of Gas Based Fire Extinguishing System
2024_AAI_212335_1
AAI/ER/PAT/SM (E-E)/e-NIT-09/24-25/
Open Tender
Electrical Works
Item Rate
90 days
JPNI Airport
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹5.0 L
24 Jul 2025
23 Oct 2024
15 Nov 2024
24 Oct 2024
13 Nov 2024
24 Oct 2024
24 Oct 2024 - 3 Nov 2024
Amount
SUB-HEAD - GAS SUPPRESSION :
Supply, Installation, Testing & Commissioning of 34 Litres Capacity Seamless UL/FM/VDS listed Cylinder CCOE/PESO Approved, complete with valve assembly and pressure gauge with a safety burst disc for 25-70Bar pressure system.
Supply, Installation, Testing & Commissioning of 80 Litres Capacity Seamless UL/FM/VDS listed Cylinder CCOE/PESO Approved, complete with valve assembly and pressure gauge with a safety burst disc for 25-70Bar pressure system.
Supply, Installation, Testing & Commissioning of 120 Litres Capacity Seamless UL/FM/VDS listed Cylinder CCOE/PESO Approved, complete with valve assembly and pressure gauge with a safety burst disc for 25-70Bar pressure system.
Supply, Installation, Testing & Commissioning of 140 Litres Capacity Seamless UL/FM/VDS listed Cylinder CCOE/PESO Approved, complete with valve assembly and pressure gauge with a safety burst disc for 25-70Bar pressure system.
Supply of Cylinder Protective Cap for 25-70 Bar System
FK-5-1-12 Fire Protection fluid compound of carbon, fluorine and oxygen (CF3CF2C(O)CF(CF3)2). UL/FM/VDS listed , 25-70Bar pressure system.
Supply, Installation, Testing & Commissioning of Electric Control Head operated electrically from the Detection & Control System or locally with a manual lever on the control head for 25-70Bar pressure system. Shall be of the same make as of FACP & Suppression Panel.
Supply, Installation, Testing & Commissioning of Pressure Operated Control Head which allows for pressure actuation slave cylinders and is mounted directly on top of the slave cylinders valve. Shall be of the same make as of FACP & Suppression Panel.
Supply, Installation, Testing & Commissioning of Discharge Nozzles are designed to provide the proper flow rate and distribution of FK-5-1-12 to total flood a hazard area : 180 deg./ 360 deg., 13m X 13 m coverage
Supply, Installation, Testing and Commissioning of Discharge Hose, 1-1/2” (use with 34, 80, 120 & 140 Ltr. Cylinders)
Supply, Installation, Testing and Commissioning of Flexible Actuation Hose (Pilot pressure is directed to a pressure operated control head on each cylinder valve using 1/4 inch actuation hose)
Supply, Installation, Testing and Commissioning of Master Cylinder Adapter Kit used to actuate the Slave Cylinder.
Supply, Installation, Testing and Commissioning of 2" Manifold Check Valve installed at the discharge manifold to allow removal of any FK-5-1-12 cylinder from the manifold while still retaining a closed system.
Supply, Installation, Testing and Commissioning of Manifold Supervisory Switch for indication of discharge of system.
Supply, Installation, Testing and Commissioning of Cylinder Strap for Cylinder.
Supply, Installation, Testing and Commissioning of Brass Male Elbow.
Supply, Installation, Testing and Commissioning of Brass Male TEE.
Supply, Installation, Testing and Commissioning of Seamless pipes along with Elbow, T Joints, connectors, Hangers and its accessories for Suppression System.
Supply, Installation, Testing and Commissioning of Cylinder Bank with all accessories for Suppression System
Disconnecting Switch for time of mantanance.
SUB-HEAD - FIRE DETECTION :
Supply, Installation, Testing and Commissioning of UL Listed Addressable Main Fire Alarm 1 Loop. Capable of detection and sending the cross zone signals to the respective Gas release panel. UL Listed & FM approved. The Panel shall be of the same make as the main FACP & GSS.
Supply, installation, testing and commissioning addressable multi-criteria photo-thermal detector with sensitivity range of 0.5 to 4.0% obs/ ft. Intelligent multi criteria detection device shall include the ability to combine signal of the thermal sensor with photoelectric signal in an effort to react hastily in the event of a fire situation. Detector shall be able to distinguish between a fire and a false alarm condition. The detector shall have twin bi-color LED for 360 deg viewing. UL268, 7th Edition listed & FM approved- for detector & base
Supplying, installing, testing and commissioning approved make Addressable Manual Call Point (Break Glass Type). The device shall have an LED which shall blink in normal state & get steady on activation to monitor the heath status of the device. The device shall comply UL approval.
Supply, Installation, Testing and Commissioning of Manual Release Switch used as electrical activation device for gas extinguishing systems complete etc as required. UL listed & FM approved. The device shall be of the same make as the main FACP & GSS.
Supply, Installation, Testing and Commissioning of Manual Abort Switch used as electrical activation device for gas extinguishing systems complete etc as required. UL listed & FM approved. The device shall be of the same make as the main FACP & GSS.
Supply, installation, testing & commissioning of Sounder cum Strobe rated at 84 dBA @ 3m for Audible annunciation and 115cd flashintg at 1 Hz for visual indication. UL Listed
Supply, Installation, Testing and Commissioning of Addressable control module for the activation of sounder and gas release sign.UL Listed & FM approved
Supply, Installation, testing & commissioning of Addressable Relay module for 3rd Party equipment. UL Listed & FM approved
Supply, Installation, Testing and Commissioning of Battery 12V/ 7AH.
Supply, Installation, Testing and Commissioning of 24v Power Supply.
Supply, Installation, Testing and Commissioning of GAS RELEASE Signages Light
Supply, Installation, Testing and Commissioning of Photo-luminiscent Gas Release caution sign boards for approved locations.
Proving and laying of 2c x 1.5 sq mm FRLS Fire Survival armoured fire Cable along with accessories for Fire Alarm panel and other devices etc as required.
Prparation of drawings, Documentation and Training Charges.
Vimal Fire Controls private Limited (BID ID -766770)
SVS Buildwel Pvt Ltd (BID ID -761651)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .