Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹94,051.17Admitted-Finance | -5.00% | ₹94,051.17 | L1 | Admitted-Finance |
| 2 | L2₹94,546.17+₹495 (0.53%)Admitted-Finance | -4.50% | ₹94,546.17+₹495 (0.53%) | L2 | Admitted-Finance |
| 3 | L3₹99,001.23+₹4,950.06 (5.26%)Admitted-Finance | +0.00% | ₹99,001.23+₹4,950.06 (5.26%) | L3 | Admitted-Finance |
| 4 | L3₹99,001.23+₹4,950.06 (5.26%)Admitted-Finance | +0.00% | ₹99,001.23+₹4,950.06 (5.26%) | L3 | Admitted-Finance |
Tender Value
₹99,000
EMD Value
₹1,980
Closing Date
24 Aug 2026, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_320936_5
e-NIT No. 70 of REW Poonch 2026-27 Dated 14-08-2026
Open Tender
Civil Works
Percentage
30 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Division Poonch
₹1,980
17 Sept 2026
14 Aug 2026
25 Aug 2026
14 Aug 2026
24 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 6 | cum | 4,826.5 | ₹28,959 |
| 2 | Providing and fixing glazed shutters for doors, windows and clerestory windows
using 4mm thick float glass panes including ISI marked M.S. pressed butt
hinges bright finished of required size with necessary screws.
Second class deodar wood | 5.28 | SQM | 4,031.35 | ₹21,285.53 |
| 3 | Providing and fixing glazed shutters for doors, windows and clerestory windows
using 4mm thick float glass panes including ISI marked M.S. pressed butt
hinges bright finished of required size with necessary screws.
Second class Kail wood | - | SQM | 3,250.75 | - |
| 4 | Providing and fixing M.S. grills of required pattern in frames of windows etc.
with M.S. flats, square or round bars etc including priming coat with approved
steel primer all complete.
Fixed to openings / wooden frames with rawl plugs screws etc. | 70.99 | KG | 231.15 | ₹16,409.34 |
| 5 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm
angle iron and 3mm M.S. gusset plates at the junctions and corners, all
necessary fittings complete, including applying a priming coat of approved
steel primer.
Using flats 30x6mm for diagonal braces and central cross piece. | 1.95 | SQM | 5,338.5 | ₹10,410.07 |
| 6 | Carriage of sand bajri by MT 15 km and HL 50 mtr | 6.93 | cum | 544.49 | ₹3,773.32 |
| 7 | ADD COST OF CIB | 1 | NO | 1,000 | ₹1,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.89 MB
BOQ_1068943.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .