Executive Engineer ED I
Office of Ex Engineer EDI Basantbagh
Creation of 63 KVA 11/66.6KV Substation for Providing of Power Supply to IIM Jammu at Srinagar Athwajan
2024_PDD_260263_1
E NIT NO 041 OF ED-I
Open Tender
Electrical Works
Lump-sum
25 days
Office of Executive Engineer ED I
Please refer Tender documents.
5 documents required · 5 mandatory
₹200
Yes
Executive Engineer ED I
₹9,800
Yes
14 Nov 2024
15 Oct 2024
12 Nov 2024
15 Oct 2024
11 Nov 2024
15 Oct 2024
15 Oct 2024 - 16 Oct 2024
63 KVA DTR 11/6.6/.433 KV Level-2 (Double Ratio)
ST Poles 9 Mt SP-33
ST Poles 8 Mt SP-15
GI Channel (100x50x6mm) 8.5 Ft 2 No, (75x40x6mm) 8.5 Feet Long (8 No), (75x40x6mm) 5.5 Ft long (2 No) and GI Angle (50x50x6mm) 5.5 Feet Long (2 No) with back clamps and V-Cross Arm with F-Top and Back Clamps (2No)
1-Core 70 mm Sq LT XLPE Cable
LT Distribution Box for 63 KVA with 100 Amp MCCB 3P 16KA for incomer and 63 A MCCB 3P 16KA 1 No for Outgoing Ckts.
11 KV AB Switch 3 pole 200 A
11KV Horn Gap Fuse 200 A
11KV Polymer Insulators
Galvanized Nuts and Bolts of sizes
GI Pipe Earthing of Poles as per J-2
Earthing of DTR as per Standard
11KV Danger Board
Anti Climbing Devices
Al. Paint (2 Coat)
Red Oxide(1 Coat)
Cement Bottoming of 8 ST Poles (1:2:4 Mix)
Cement Bottoming of 9 ST Poles (1:2:4 Mix)
3 phase Prodigy Meter
Sundry item(Lugs/PG Clamp) etc
BUDOO ELECTRICALS AND SUPPLIERS (BID ID -2225221)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .