Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹9.5 L+₹13,815 (1.48%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹9.5 L+₹18,865 (2.02%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S Shiv Traders L1 | M/s Sharda Electrical L2 | JYOTI CONSTRUCTION AND SUPPLIER L3 |
|---|---|---|---|---|---|---|
| 1.01LABOUR AND EREECTION CHARGES:- | ||||||
| 1.02 | Installation/Fixing of 11 KV Fuse set on Transfromer Double Pole, All Materials Provided by Contractor. | 13 | Nos | 4,495 ₹58,435 Lowest | 4,500 ₹58,500 | 4,600 ₹59,800 |
| 1.03 | Labour Charges for earthing of CT LA VCB Of SUBSTATION completed for digging of 60 fit Borewell type pit (1.5-inch diameter) to install 60 fit long M.S. Pipe (60 fit long) with 1.5-inch diameter work followed by connection of M.S. Stirp 50X6 mm size for Suitable length to G.I. Pipe through proper welding ( Aluminium paint covering of welded joint) with tightening of nuts & bolts and fitting of spaces by homogeneous mixture of coke & sault against medium power transformer body and neutral earthing these includes connection of M.S Strip fot sepret common pit as there will be one pit of each earthing. All rewuired material will be provided by contractor. | 9 | Job | 34,950 ₹3,14,550 Lowest | 35,500 ₹3,19,500 | 35,650 ₹3,20,850 |
| 1.04 | Labour Charges for earthing of MEDIUM & POWER Transformers AND C&R PANNEL completed for digging of 60 fit Borewell type pit (1.5-inch diameter) to install 60 fit long M.S. Pipe (60 fit long) with 1.5-inch diameter work followed by connection of M.S. Stirp 50X6 mm size for Suitable length to G.I. Pipe through proper welding ( Aluminium paint covering of welded joint) with tightening of nuts & bolts and fitting of spaces by homogeneous mixture of coke & sault against medium power transformer body and neutral earthing these includes connection of M.S Strip fot sepret common pit as there will be one pit of each earthing AT 33/11 KV S/S CHHATOH. All required material will be provided by contractor. | 16 | Job | 34,950 ₹5,59,200 Lowest | 35,500 ₹5,68,000 | 35,650 ₹5,70,400 |
Tender Value
₹9.5 L
EMD Value
₹9,500
Closing Date
11 Sept 2025, 3:00 pmClosed
SE EDC II GORA BAZAR RAEBARELI
OFFICE OF SE EDC II GORA BAZAR RAEBARELI
ELECTRICAL WORK UNDER BUSINESS PLAN 2025-26 IN JURISDICTION OF EDD SALON
2025_MVVNL_1068882_1
TENDER NO. 48/EDCR-II/2025-26
Open Tender
Electrical Works
Item Rate
30 days
EDD SALON
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
ICICI BANK A/C 081205500344/ IFS CODE ICIC0000812
₹9,500
Yes
16 Sept 2025
27 Aug 2025
12 Sept 2025
6 Sept 2025
11 Sept 2025
6 Sept 2025
Amount
LABOUR AND EREECTION CHARGES:-
Installation/Fixing of 11 KV Fuse set on Transfromer Double Pole, All Materials Provided by Contractor.
Labour Charges for earthing of CT LA VCB Of SUBSTATION completed for digging of 60 fit Borewell type pit (1.5-inch diameter) to install 60 fit long M.S. Pipe (60 fit long) with 1.5-inch diameter work followed by connection of M.S. Stirp 50X6 mm size for Suitable length to G.I. Pipe through proper welding ( Aluminium paint covering of welded joint) with tightening of nuts & bolts and fitting of spaces by homogeneous mixture of coke & sault against medium power transformer body and neutral earthing these includes connection of M.S Strip fot sepret common pit as there will be one pit of each earthing. All rewuired material will be provided by contractor.
Labour Charges for earthing of MEDIUM & POWER Transformers AND C&R PANNEL completed for digging of 60 fit Borewell type pit (1.5-inch diameter) to install 60 fit long M.S. Pipe (60 fit long) with 1.5-inch diameter work followed by connection of M.S. Stirp 50X6 mm size for Suitable length to G.I. Pipe through proper welding ( Aluminium paint covering of welded joint) with tightening of nuts & bolts and fitting of spaces by homogeneous mixture of coke & sault against medium power transformer body and neutral earthing these includes connection of M.S Strip fot sepret common pit as there will be one pit of each earthing AT 33/11 KV S/S CHHATOH. All required material will be provided by contractor.
M/s Sharda Electrical (BID ID -5519767)
JYOTI CONSTRUCTION AND SUPPLIER (BID ID -5519774)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .