| Sl No | Description | Qty | Unit | M/S R.G. TRADERS L2 | M/S Gaurav Electricals L4 | BHARDWAJ ENTERPRISES L1 | M/S SHRIYA ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|
| 0.00Construction of Temporary 11 KV, LT Line, Installation of Distribution Transformer, Street Light fitting connection and Camp Connection etc. for Emergency works/V.I.P. Visits in Mela area during year 2025-26, which includes loading, carriage and unloading of materials from Naini store to work site and work site to Naini store, alongwith dismantling of line after work completion in Mela area, Prayagraj. | |||||||
| 1.00 | Construction of Temporary 11 KV overhead Line from nearest 11 Kv tapping point on STP 11 Mtr. long after erection of pole by ACSR weasel/Dog conductor with proper guarding (min 8 No. latching per span) and its earthing. | 0.75 | Ckt. Km. | 20,000 ₹15,000 | 18,500 ₹13,875 | 5,400 ₹4,050 Lowest | 18,000 ₹13,500 |
| 2.00 | Maintenance of 11 KV overhead line by providing maintenance gang round the clock at occasion. | 0.75 | Ckt. Km. | 20,000 ₹15,000 | 12,000 ₹9,000 | 3,206 ₹2,404.5 Lowest | 11,000 ₹8,250 |
| 3.00 | Laying of 11 KV 3x185 mm2 XLPE Cable in Mela area. | 170 | Mtr | 200 ₹34,000 | 110 ₹18,700 | 33 ₹5,610 Lowest | 105 ₹17,850 |
| 4.00 | Making of 11 Kv outdoor box 3x185 Sq mm(outdoor box will be provided by the contractor) | 6 | No | 3,000 ₹18,000 | 3,500 ₹21,000 | 900 ₹5,400 Lowest | 3,000 ₹18,000 |
| 5.00 | Dismantling of 11 KV overhead Line after completion of occasion and receive back complete line from work site to store Naini. | 0.75 | Ckt. Km. | 10,000 ₹7,500 | 15,000 ₹11,250 | 4,050 ₹3,037.5 Lowest | 14,000 ₹10,500 |
| 6.00 | Construction of four pole structure on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/ angles, painting (Post office RED on top) and earthing etc and Installation of G.O. 4 Nos. D.O. 2 Nos. fittings, making of Busbar on the top portion of structure with cutting, fabrication and mounting of channel/Angle on four pole. | 1 | Job | 20,000 ₹20,000 | 16,000 ₹16,000 | 4,800 ₹4,800 Lowest | 16,000 ₹16,000 |
| 7.00 | Construction of T/f plinth of size 1.5x1.5.x1.25 Mtr. with Ist class bricks of 0.95 meter height and 0.35 meter thick wall will be constructed. Rest wall should be 0.23 meter thickness. Brick work will be in ratio of 1:4 Cement and sand. In the hollow portion the sand should be filled from ground level up to 15 cm. below from the top of plinth. The cement, sand and stone ballast should be placed in ratio 1:2:4 and 2 nos. channels be grouted in the concrete. The T/f plinth should be plastered on all sides by 12mm thick in 1:6 Cement, and mortar. | 2 | No | 10,000 ₹20,000 | 14,000 ₹28,000 | 4,350 ₹8,700 Lowest | 14,000 ₹28,000 |
| 8.00 | Installation of 400 KVA Transformer on plinth and making all HT/LT connections from transformer to L.T Tailless unit and earthing of transformer. | 2 | No. | 10,000 ₹20,000 | 11,500 ₹23,000 | 3,450 ₹6,900 Lowest | 11,200 ₹22,400 |
| 9.00 | Installation of Tailless Unit by providing structure of channels with the help of 3/4 meter long M.S. Channel including mounting of 12 to 16 Nos. Tailless Unit 500/300 Amps. Also making of copper bus bar and its tapping, and earthing of structure by earth rod at two Point | 2 | Job | 5,000 ₹10,000 | 6,500 ₹13,000 | 1,860 ₹3,720 Lowest | 6,000 ₹12,000 |
Tender Value
₹19 L
EMD Value
₹19,000
Closing Date
10 Sept 2025, 2:00 pmClosed
Superintending Engineer
Superintending Engineer, E.U.D.C.-1, 57, George Town, Prayagraj
Refer to Tender Description
2025_PVVNV_1060174_2
05/SE/EUDC-I-PRA/2025-26
Open Tender
Electrical Works
Lump-sum
365 days
EUCD-I
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Account Number-0012002100504911
₹19,000
25 Sept 2025
27 Aug 2025
10 Sept 2025
27 Aug 2025
10 Sept 2025
27 Aug 2025
Amount
Construction of Temporary 11 KV, LT Line, Installation of Distribution Transformer, Street Light fitting connection and Camp Connection etc. for Emergency works/V.I.P. Visits in Mela area during year 2025-26, which includes loading, carriage and unloading of materials from Naini store to work site and work site to Naini store, alongwith dismantling of line after work completion in Mela area, Prayagraj.
Construction of Temporary 11 KV overhead Line from nearest 11 Kv tapping point on STP 11 Mtr. long after erection of pole by ACSR weasel/Dog conductor with proper guarding (min 8 No. latching per span) and its earthing.
Maintenance of 11 KV overhead line by providing maintenance gang round the clock at occasion.
Laying of 11 KV 3x185 mm2 XLPE Cable in Mela area.
Making of 11 Kv outdoor box 3x185 Sq mm(outdoor box will be provided by the contractor)
Dismantling of 11 KV overhead Line after completion of occasion and receive back complete line from work site to store Naini.
Construction of four pole structure on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/ angles, painting (Post office RED on top) and earthing etc and Installation of G.O. 4 Nos. D.O. 2 Nos. fittings, making of Busbar on the top portion of structure with cutting, fabrication and mounting of channel/Angle on four pole.
Construction of T/f plinth of size 1.5x1.5.x1.25 Mtr. with Ist class bricks of 0.95 meter height and 0.35 meter thick wall will be constructed. Rest wall should be 0.23 meter thickness. Brick work will be in ratio of 1:4 Cement and sand. In the hollow portion the sand should be filled from ground level up to 15 cm. below from the top of plinth. The cement, sand and stone ballast should be placed in ratio 1:2:4 and 2 nos. channels be grouted in the concrete. The T/f plinth should be plastered on all sides by 12mm thick in 1:6 Cement, and mortar.
Installation of 400 KVA Transformer on plinth and making all HT/LT connections from transformer to L.T Tailless unit and earthing of transformer.
Installation of Tailless Unit by providing structure of channels with the help of 3/4 meter long M.S. Channel including mounting of 12 to 16 Nos. Tailless Unit 500/300 Amps. Also making of copper bus bar and its tapping, and earthing of structure by earth rod at two Point
Operation and maintenance of above 11/0.4 KV, 2x400 KVA substation, round the clock from the date of energisation with the help of skilled operating staff (Operating Staff will be provided by the contractor). Two skilled manpower must be in each shift and minimum 3 shifts must be performed everyday)
Making of foundation plinth for D.G. Set of Size 14x4 ft. with the help of 1st Class Brick and its plastering with cement and Sand in ratio 1:6 which includes fixing of Change Over Switch on Sub Station Angle size 65x65x6 mm and its proper connection.
Fixing of Fire bucket stand with four nos. buckets including its grouting and two no fire extinguisher at various sub-stations in Mela area.
Laying of L.T. PVC cable 3.5x400 sq mm or equivalent size which also include maintenance and dismantling of cable after Mela.
Laying of L.T. PVC Cable 3½ x 240/150 sq. mm. or equivalent size inside sand, which also includes maintenance and dismantling of cable after Mela.
Laying/hanging of L.T. cable 3.5x70 Sq mm or equivalent size cable from transformer to L.T. line in Mela area.
Laying/hanging of L.T. cable 4X16sqmm/4X25 Sq mm or equivalent size cable from transformer to L.T. line in Mela area.
Laying of LT Cable 2X4/2X10 Sq mm. for 24 Hrs connections.
Construction of L.T. line single phase 4 wire by ACSR weasel/Dog conductor after erection of 9 Mtr. long S.T.P. alongwith guarding with the help of 6/8 SWG G.I. wire (minimum 8 No. latching per span on main roads and 4 No. latching per span in other area) & earthing of poles.
Maintenance of L.T. Line single phase, 4 wire by providing maintenance gang round the clock at occasion.
Dismantling of L.T. line single phase, 4 wire after completion of Mela period or as per instruction of mela administration and carriage back complete line material to Mela store.
Construction of L.T. line Three phase 6 wire by ACSR weasel/Dog conductor after erection of 9 Mtr. long S.T.P. alongwith guarding with the help of 6/8 SWG G.I. wire (minimum 6 Nos. latching per span ) & earthing of every tenth poles.
Maintenance of L.T. Line Three phase, 6 wire by providing maintenance gang for complete Mela Period or As per instruction of mela administration (Contractor will provide minimum 6 persons round the clock for maintenance)
Dismantling of L.T. line Three phase 6 wire after completion of Mela period or As per instruction of mela administration and carriage back complete line material to Mela store.
Mounting & fixing of LED 250 W/160W/110 W/70 Watt Street light fitting or equivalent L.E.D. fitting, on erected S.T.P. in proper position with bracket and clamps and making electrical connection. This also includes maintenance of street light fitting and replacement of fittings during the Mela period, dismantling of the fittings after Mela. (Street light fitting, Bracket and Clamps will be provided by the department).
Carriage & installation of 63/125 KVA DG Set in Mela Area (D.G. Set will be provided by the department and diesel, operation and maintenance will be provided by the contractor at his own cost).
Providing camp connection with M.C.B. and conduit in camp. (All material will be provided by the contractors).
14 watt led with conduit wiring
20 watt tube rod fitting with conduit wiring
20 Watt Rechargable LED light with conduit wiring
Providing 5 Amp Socket with switch Point connection (Standard make ISI approved) For Charging Mobile/ Battery for communication on rental basis.
Installation of Distribution board of size 2.5'x2' on wooden board with cutout of 200/100/63 amp as per requirement of site for three phase along with neutral link on rental basis. The distribution board should be fixed on iron angle frame at the height of 5' from ground level.
Installation of Single Phase/Three Phase (as per requirement) Distribution board having capacity of 32/16/5 amp on wooden/PVC board on rental basis.
Painting of ST pole in Mela area. (Existing & New erected)
Operation & maintenance of High mast mobile generator during mela period, with its carriage from Naini store to entire mela area as per requirement/ instruction by department. (Diesel will be provided by the contractor)
Electrification of mela area (Chhat Puja & Dev Dipawali) on 12Ft Bamboo and Balli in proper span in mela area by providing and installation of LED Bulb/Tube Rod on Balli and its wiring and connection with nearest LT line for proper illumination in mela area on rental basis.(All materials will provided by Contractor on rental basis)
Providing and fixing of electrically insulated flex sheet in Sangam area on Rental Basis (as per design provided by department).
M/S R.G. TRADERS (BID ID -5524301)
M/S SHRIYA ENTERPRISES (BID ID -5525363)
M/S Gaurav Electricals (BID ID -5525508)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .