| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.8 LAccepted-AOC 37 222 BUNDU KATRA AGRA UP | AGRA | UP | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹31.0 L+₹18,870.55 (0.61%)Rejected-AOC 131 SHINGANAPUR ROAD KOLKI KOLKI SATARA MAHARASHTRA 415523 | SATARA | MAHARASHTRA | 415523 | L2 | Rejected-AOC Not Lowest | |
| 3 | L3₹31.0 L+₹18,930.85 (0.61%)Rejected-AOC | L3 | Rejected-AOC Not Lowest | |
| 4 | L4₹32.9 L+₹2.1 L (6.69%)Rejected-AOC | L4 | Rejected-AOC Not Lowest | |
| 5 | L5₹34.7 L+₹3.8 L (12.5%)Rejected-AOC | L5 | Rejected-AOC Not Lowest |
Tender Value
Refer Docs
EMD Value
₹65,000
Closing Date
12 Apr 2021, 6:00 pmClosed
BhraTPUR
GE Bharatpur
MO of water supply installation under AOR of GE BHRATpur
2021_MES_431222_1
8024/E8
Open Tender
Miscellaneous Works
Item Rate
335 days
BhraTPUR
Class D category d(v)
7 documents required · 7 mandatory
₹500
Yes
GE Bharatpur
₹65,000
Yes
17 May 2021
17 Mar 2021
14 Apr 2021
17 Mar 2021
12 Apr 2021
28 Mar 2021
18 Mar 2021 - 20 Mar 2021
Amount
Manning and Operation of water supply installation equipment’s such as operation of pump and motor, DG Set, operation of valves, for pumping, including Sundays & holidays. Cleaning and dusting of all equipment’s including first hand minor repair such as fixing of gland, replacement of packings, repair of electric junction connection etc, by deploying of One Skilled FGM per shift of 08 hours for Three shift in a day on all days including Sundays and Holidays complete for the DG set and Mallah pump house all as directed by Engineer-in-charge and having following equipment’s : (a) Centrifugal pump set -03 Nos (b)DG Set 70 KVA Capacity (c ) Chloronome plant Shift timings are as under : (i)First shift : 06.00 to 14.00 Hours (ii)Second shift : 14.00 to 22.00 Hours (iii)Third shift : 22.00 to 06.00 Hours Man power to be employed : (i) FGM (Skilled) - 03 Nos (One FGM for each shift)
Manning and Operation of section Hospital generator set and water supply installation of Kanjoli line pump House equipment’s such as DG Set operation of valves, for pumping, including Sundays & holidays for 24 hrs daily in three shifts Cleaning and dusting of all equipment’s such as fixing of gland, replacement of packings etc, by deploying of One Semi skilled Mate FGM per shift of 08 hours for Three shift in a day on all days including Sundays and Holidays complete for the Kanjoli Line Pump House and Section Hospital stand by DG SET of 62.5 KVA capacity all as directed by Engineer-in-charge. Shift timings are as under : (i)First shift : 06.00 to 14.00 Hours (ii)Second shift : 14.00 to 22.00 Hours (iii)Third shift : 22.00 to 06.00 Hours Man power to be employed : (i) Mate FGM (Semi Skilled) - 03 Nos (One Mate FGM for each shift)
Manning and Operation of RO plant(Reverse Osmosis) of capacity 500 Ltrs per/ Hour including maintain all necessary filters, Anti scaling dosing system, Booster pump and all control valves including Sundays & holidays for 16 hrs daily in two shifts Cleaning and dusting of all equipment’s such as fixing of gland, replacement of packings etc, by deploying of One Semi skilled Mate FGM per shift of 08 hours for Two shift in a day on all days including Sundays and Holidays complete near Airawat mess, Kanjoli Line all as specified and directed. all as directed by Engineer-in-charge two shifts per day Shift timings are as under : (i)First shift : 06.00 to 14.00 Hours (ii)Second shift : 14.00 to 22.00 Hours Man power to be employed : (i) Mate FGM (Semi Skilled) - 02 Nos (One Mate FGM for each shift)
Manning and Operation of all controlling of sluice valves of distribution pipe line of supply/pumping time at morning and evening time of entire Kanjoli Line area including Sundays & holidays. Cleaning and dusting of all equipment’s including first hand minor repair such as fixing of gland, replacement of packings etc, by deploying of One Semi skilled Valve Man per shift of 08 hours for one shift in a day on all days including Sundays and Holidays complete all as specified and directed. all as directed by Engineer-in-charge Shift timings are as under : (i)Moring Time : 04.30 to 08.30 Hours (ii)Evening Time : 04.00 to 08.00 Hours Note : One shift of 08 Hours to be considered 04 Hours in morning and 04 Hours in evening supply hours Man power to be employed : (i) Valve Man (Semi Skilled) - 01 No (One Valve Man for each shift)
Manning and Operation of all controlling of sluice valves of distribution pipe line of supply/pumping time at morning and evening time of entire Sewar Fort area including Sundays & holidays. Cleaning and dusting of all equipment’s including first hand minor repair such as fixing of gland, replacement of packings etc, by deploying of One Semi skilled Valve Man per shift of 08 hours for one shift in a day on all days including Sundays and Holidays complete all as specified and directed. all as directed by Engineer-in-charge Shift timings are as under : (i)Moring Time : 04.30 to 08.30 Hours (ii)Evening Time : 04.00 to 08.00 Hours Note : One shift of 08 Hours to be considered 04 Hours in morning and 04 Hours in evening supply hours. Man power to be employed : (i) Valve Man (Semi Skilled) - 01 No (One Valve Man for each shift)
Day to day maintenance and petty repairs of pipe line work for Kanjoli Line area of GE Bharatpur attending daily complaints lodged by the complaints and registering of complaints at complaint cell by deploying of One skilled pipe fitter per shift of 08 hours for one shift in a day on all days excluding Sundays and Holidays complete all as specified and directed. Shift timings are as under : (i)First shift : 09.00 to 05.00 Hours Man power to be employed : (i) Pipe Fifter(Skilled) - 01 No (One Pipe Fifter for each shift) (a) The shift time will be decided by JE/Engineer-in-Charge and can be changed at any time as per the requirement. (b) The work entrusted by JE/Engineer-in-Charge shall be completed within the time specified by JE/Engineer-in-Charge. (c) The rate quoted is deemed to be inclusive of the cost of complaint of slips and cost of T&P for maintenance/ cleaning work for day to day maintenance (d) Stores viz fitting/fixtures, shall be issued by department for replacing unserviceable fittings where required.
Day to day maintenance and petty repairs of pipe line work for KLP Location area of GE Bharatpur attending daily complaints lodged by the complaints and registering of complaints at complaint cell by deploying of One skilled pipe fitter per shift of 08 hours for one shift in a day on all days excluding Sundays and Holidays complete all as specified and directed. Shift timings are as under : (i)First shift : 09.00 to 05.00 Hours Man power to be employed : (i) Pipe Fifter(Skilled) - 01 No (One Pipe Fifter for each shift) (a) The shift time will be decided by JE/Engineer-in-Charge and can be changed at any time as per the requirement. (b) The work entrusted by JE/Engineer-in-Charge shall be completed within the time specified by JE/Engineer-in-Charge. (c) The rate quoted is deemed to be inclusive of the cost of complaint of slips and cost of T&P for maintenance/ cleaning work for day to day maintenance (d) Stores viz fitting/fixtures, shall be issued by department for replacing unserviceable fittings where required.
Day to day maintenance and petty repairs of pipe line work for Sewar Fort area of GE Bharatpur attending daily complaints lodged by the complaints and registering of complaints at complaint cell by deploying of One skilled pipe fitter per shift of 08 hours for one shift in a day on all days excluding Sundays and Holidays complete all as specified and directed. Shift timings are as under : (i)First shift : 09.00 to 05.00 Hours Man power to be employed : (i) Pipe Fifter(Skilled) - 01 No (One Pipe Fifter for each shift) (a) The shift time will be decided by JE/Engineer-in-Charge and can be changed at any time as per the requirement. (b) The work entrusted by JE/Engineer-in-Charge shall be completed within the time specified by JE/Engineer-in-Charge. (c) The rate quoted is deemed to be inclusive of the cost of complaint of slips and cost of T&P for maintenance/ cleaning work for day to day maintenance (d) Stores viz fitting/fixtures, shall be issued by department for replacing unserviceable fittings where required. Note for Srl Item No 01 to 08:- The rate quoted shall not be less than minimum wages as notified by Govt of India/State Govt/ Local body whichever is higher including all statutory provisions such as EPF, ESIC, Bonus, taxes etc as applicable. In case the rates quoted are less than the minimum wages as notified by the Govt of India /State govt/ Local body whichever is higher including all statutory provisions such as EPF, ESIC, Bonus, taxes etc as applicable, his tender will be treated as non bonafide and will not be considered for acceptance. In such case, the lowest tenderer shall be determined by the lowest amount amongst valid/bonafide bids only
PD GUPTA AND COMPANY
Vishal Traders
Skyline Encon
DIAMOND ELECTRICALS
M/S MAKHIJA TRADERS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .