| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹34.7 LAccepted-AOC | 1 | Accepted-AOC QUALIFIED IN 1ST LOWEST AND AGREEMENT DRAWN | |
| 2 | 2₹37.8 L+₹3.1 L (9.01%)Rejected-Finance | 2 | Rejected-Finance DISQUALIFIED | |
| 3 | 3₹37.9 L+₹3.2 L (9.15%)Rejected-Finance | 3 | Rejected-Finance DISQUALIFIED | |
| 4 | 4₹38.1 L+₹3.4 L (9.72%)Rejected-Finance | 4 | Rejected-Finance DISQUALIFIED | |
| 5 | 5₹38.5 L+₹3.8 L (11.1%)Rejected-Finance | 5 | Rejected-Finance DISQUALIFIED |
Tender Value
₹48.2 L
EMD Value
₹48,220
Closing Date
26 May 2026, 5:30 pmClosed
Divisional Officer
RURAL WORKS DIVISION, KORAPUT
Construction of R.I. Office-Cum-Residential building at Boipariguda under Boipariguda Tahasil for the year 2023-24.
2026_CERWI_129383_1
SERWKPT ONLINE 01/2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
Koraput
2 documents required · 2 mandatory
₹6,000
₹48,220
Yes
Superintending Engineer RWD Koraput
9 Aug 2026
16 May 2026
28 May 2026
16 May 2026
26 May 2026
16 May 2026
16 May 2026 - 26 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in foundation hard soil including moorum, stoney earth mixed with boulders with all leads and lifts including dressing and levelling the bed and depositing the excavated earth away from the work site with all leads and lifts including cost of all labour and T&P and cess required for the work and etc. complete in all respect and as per the direction by the Engineer-in-charge.(Ground Floor) | 153.6 | cum | 282.9 | ₹43,454.01 |
| 2 | Supplying, filling in foundation and plinth with sand in layers well watered and rammed including cost, conveyance, royalty of all the materials required for the work labour with T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.(Ground Floor) | 76.95 | cum | 533.4 | ₹41,045.66 |
| 3 | Cement Concrete of proportion(1:3:6) in foundation and plinth using 4cm size clean hard black granite metal of approved quality from approved quarry including hoisting, lowering and laying in layers not exceeding 15cm thick to the required level, ramming watering and curing etc.complete including cost, conveyance, royalty taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.(Ground Floor) | 47.66 | cum | 5,621.2 | ₹2,67,917.63 |
| 4 | R.R.H.G stone masonry in cement mortar (1:6) in foundation and plinth with hard black broken granite stone of approved size and quality form approved quarry including splays cutting, circular moulding, chamfering and cur belling, watering and curing etc. complete including cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.(Ground Floor) | 61.28 | cum | 4,446.1 | ₹2,72,448.12 |
| 5 | Cement concrete of proportion (1:2:4) using 12mm size hard granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete and compacting in layers not exceeding 15cm thick with proper packing and ramming each layer of concrete by means of vibrator including watering and curing etc.complete including cost, conveyance, royalty taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.(Ground Floor) | 14.44 | cum | 7,299.1 | ₹1,05,377.11 |
| 6 | (First Floor) | 0.26 | cum | 7,745.1 | ₹2,013.73 |
| 7 | R.C.C work of M-25 grade with 20mm and down graded clean hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete with necessary slope and smoothness to receive tar felting or terracing, watering and curing for four weeks, centring, shuttering and finishing the exposed surface and ceiling smooth to receive white washing or painting providing grooves or beads and fan hooks as per requirement in ceiling where necessary, cost of water, including cost, conveyance, royalty taxes of all the materials and labour, T&P and cess etc. complete in all respect but excluding cost of M.S rods or Tor steel and binding wire 18 to 20 gauge and labour charges for straightening, cutting, bending and binding and tying the grills and placing in proper position as per specification and direction of the Engineer-in-charge. (Ground Floor) (Column base) | 15.62 | cum | 6,335.6 | ₹98,949.4 |
| 8 | (Ground Floor)(Columns & Beams) | 11.42 | cum | 14,201.7 | ₹1,62,155.01 |
| 9 | (First Floor)(Columns & Beams) | 9.03 | cum | 15,937.2 | ₹1,43,849.17 |
| 10 | (Second Floor)(Columns & Beams) | 1.84 | cum | 17,994.9 | ₹33,020.64 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_591568.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.09 MB
Tendernotice_2.pdf
PDF • 1.70 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_591568.xls
BOQ • 0.27 MB
Corri_2_2627.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .