Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance | L1 | Accepted-Finance Being the lowest bidder L1 | |
| 2 | L2₹5.0 L+₹3,331.20 (0.67%)Accepted-Finance | L2 | Accepted-Finance Being L2 | |
| 3 | L3₹5.4 L+₹48,320 (9.74%)Accepted-Finance | L3 | Accepted-Finance Being L3 | |
| 4 | L4₹5.6 L+₹65,818.48 (13.3%)Accepted-Finance | L4 | Accepted-Finance Being L4 | |
| 5 | L5₹5.8 L+₹80,320 (16.2%)Accepted-Finance | L5 | Accepted-Finance Being L5 |
Tender Value
₹8.2 L
Closing Date
22 Jun 2023, 6:00 pmClosed
DFO Doda
Forest Compex Doda
Fencing work DRSM and construction of inspection path in Siraj Range of Doda Forest Division for the year 2023-24
2023_FD_214817_1
e NIT No 06 of 2023-24 dt. 02/06/2023
Open Tender
Civil Works
Item Rate
30 days
Siraj Range in Comptt 23 siraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
DFO Doda
Exempted
24 Jun 2023
2 Jun 2023
23 Jun 2023
2 Jun 2023
22 Jun 2023
2 Jun 2023
Amount
858 Nos. Wooden Fence Posts & 18965 MTR Barbed wire from nearest possible road side to work site of closure. Involving cutting of bushes along the proposed periphery of closure 6864 Rft through mannual labour. Extraction of wooden posts from fallen trees using manual labour Transportation/ carriage of wooden posts from Forests to work site . Digging of 858 Nos. Pits mannually of size 1'-6''x1'x1' at 8' apart along the wooden fencing line. Fixation of Wooden Fence Posts, 858 Nos.nto the excavated pits manually. Also includes refilling of excavated soil into pits and complete ramming of the Wooden Fence Posts. 5 strands with Criss cross along the fixed Wooden Fence Posts covering 6864 rft. mannually & formation of verticle crosses with G.I. Wire cut pieces at biotic sensitive points where ever needed. 858 Wooden Fence Posts with ready mix synthetic Enamel paint of approved brand & manufacture in all shades to give an even shade on all sides of each fence posts manually. Enumeration of wooden posts using red poind. Procurement of iron sign board made of MS sheet size (40x40x6 mm thick) embaded into 2 Nos. Verticle Angle iron size 7' length including painting/ writting, carriage upto closure site and its fixation etc. (Timber/Wood for the fence post will be provided by the forest deparment and the cost will be deducted from the payment to be made to the contractor).
Soil and Moisture conservation works, the rates including cost, collection, carriage of stone to work site fencing/dressing of stone and preparation of bed at site to be identifiied by the Forest staff.
Construction of inspection path (02 Km) with standard verification in comptt. 23/Sj of Siraj Range under CAMPA for the year 2023-24. The rates include the cost and carriage of the material/labour charges.
USMAN ALI
MOHAN SINGH
Momin Jaffer Sheikh
Abdul Wahid
MOHD ASLAM
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .