| Sl No | Description | Qty | Unit | A.K.B RAJA ENTERPRISES L1 | Ramaganapathy Enterprises L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for clearing the spillage coal on walkway return side under the belt to the entire length of the conveyor, deck sheet,head end and tail end of the Conveyor-43,46,RC-1, BFD-9A & 9B and Primary Crusher floor including hire charges for T&P etc., complete. | 200 | Activity | 16,50,000 ₹19,47,000 Lowest | 17,20,000 ₹20,29,600 |
| 2.00 | Charges for assisting work for providing belt joint in slope Conveyor-43,46,BFD-9A&9B,RC-1 including arresting the belt by providing clamps,lifting the counter weight, dismantling the idlers and idler frames and skirt board assembly and refixing the same after vulcanizing the joint including T&P hire charges and cost of consumables etc.,complete. | 6 | No. | 3,58,800 ₹4,23,384 Lowest | 3,73,200 ₹4,40,376 |
| 3.00 | Charges for assisting work for pulley lagging works in Conveyors-43,46,RC-1 BFD-9A & 9B including arresting the conveyor belt lifting the counter weight and normalizing the system after pulley lagging,trial operation including T&P hire charges and cost of consumables etc., complete. | 6 | No. | 3,58,800 ₹4,23,384 Lowest | 3,73,200 ₹4,40,376 |
| 4.00 | Charges for overhauling and inspection of pulley bearings and replacement if necessary in tail pulley/tail snub pulley/bend pulley and take up movable pulley in Conveyors-43,46,BFD-9A&9B,RC-1 including arresting the conveyor belt, lifting the counter weight and normalizing, the system after bearing,overhauling, trial operation including the cost of consumables and T&P hire charges etc., complete. | 8 | Operation | 7,60,000 ₹8,96,800 Lowest | 7,90,400 ₹9,32,672 |
| 5.00 | Charges for overhauling and inspection of pulley bearing and replacement if necessary in head pulley/head snub pulley/ drive pulley in conveyors 43, 46,BFD-9A & 9B and RC-1, including arresting the conveyor belt,lifting the counter weight and normalizing, the system after bearing overhauling, trial operation including the cost of consumables and T&P hire charges etc., complete. | 8 | Operation | 8,54,800 ₹10,08,664 Lowest | 8,88,800 ₹10,48,784 |
| 6.00 | Charges for overhauling and inspection of resilient coupling in Conveyors-43 & 46 and including arresting the conveyor belt, lifting the counter weight,dismantling the resilient coupling, arranging for inspection, removal of old grease, cleaning the gear teethes, packing the new grease and normalizing the system,trial operation including the cost of consumables and T&P hire charges etc.,complete. | 4 | Operation | 3,06,000 ₹3,61,080 Lowest | 3,18,400 ₹3,75,712 |
Tender Value
Refer Docs
EMD Value
₹30,300
Closing Date
2 Jan 2026, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ECHP-I- Upkeepment of conveyors and its related equipments for attending preventive mechanical maintenance works in Conveyor-43,46,RC-1,BFD-9A9B and PC-1A 1B.
2025_EB_633250_1
CE/SE/MI/TTPS/44/2026-2027
Open Tender
Miscellaneous Works
Works
365 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹30,300
Yes
24 Mar 2026
17 Dec 2025
3 Jan 2026
17 Dec 2025
2 Jan 2026
17 Dec 2025
Charges for clearing the spillage coal on walkway return side under the belt to the entire length of the conveyor, deck sheet,head end and tail end of the Conveyor-43,46,RC-1, BFD-9A & 9B and Primary Crusher floor including hire charges for T&P etc., complete.
Charges for assisting work for providing belt joint in slope Conveyor-43,46,BFD-9A&9B,RC-1 including arresting the belt by providing clamps,lifting the counter weight, dismantling the idlers and idler frames and skirt board assembly and refixing the same after vulcanizing the joint including T&P hire charges and cost of consumables etc.,complete.
Charges for assisting work for pulley lagging works in Conveyors-43,46,RC-1 BFD-9A & 9B including arresting the conveyor belt lifting the counter weight and normalizing the system after pulley lagging,trial operation including T&P hire charges and cost of consumables etc., complete.
Charges for overhauling and inspection of pulley bearings and replacement if necessary in tail pulley/tail snub pulley/bend pulley and take up movable pulley in Conveyors-43,46,BFD-9A&9B,RC-1 including arresting the conveyor belt, lifting the counter weight and normalizing, the system after bearing,overhauling, trial operation including the cost of consumables and T&P hire charges etc., complete.
Charges for overhauling and inspection of pulley bearing and replacement if necessary in head pulley/head snub pulley/ drive pulley in conveyors 43, 46,BFD-9A & 9B and RC-1, including arresting the conveyor belt,lifting the counter weight and normalizing, the system after bearing overhauling, trial operation including the cost of consumables and T&P hire charges etc., complete.
Charges for overhauling and inspection of resilient coupling in Conveyors-43 & 46 and including arresting the conveyor belt, lifting the counter weight,dismantling the resilient coupling, arranging for inspection, removal of old grease, cleaning the gear teethes, packing the new grease and normalizing the system,trial operation including the cost of consumables and T&P hire charges etc.,complete.
Ramaganapathy Enterprises (BID ID -1551569)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_757624.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].