Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC DASPUR PASCHIM MEDINIPUR WEST BENGAL PIN 721211 | DASPUR | PASCHIM MEDINIPUR | WEST BENGAL | 721211 | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹3.2 L+₹11,040 (3.60%)Rejected-Finance SCHOOL BAZAR MIDNAPUR | MEDINIPUR EAST | WEST BENGAL | 721130 | L2 | Rejected-Finance 2nd Lowest Bidder. | |
| 3 | L3₹3.3 L+₹22,080 (7.19%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest Bidder. | |
| 4 | Rejected-Technical | - | Rejected-Technical 1) Performance towards the execution of the entrusted AMC for air conditioning machines is not satisfactory at all. 2) The pre-bid meeting has not been attended, and filled out Annex E not found. 3) Balance sheet not found. |
Tender Value
Refer Docs
EMD Value
₹6,238
Closing Date
4 May 2024, 4:00 pmClosed
OFFICE OF THE SUPERINTENDING ENGINEER,SWEC,PWD
OFFICE OF THE SUPERINTENDING ENGINEER (P.W.D) South-Western Electrical Circle PWD Compound, Midnapore, Paschim Medinipur
Annual Comprehensive maintenance of Air- Conditioning System at different Sites under Ghatal Electrical section PWDte.
2024_WBPWD_688625_1
WBPWD/SE/SWEC/NIQ01/2024-25
Open Tender
ELECTRICAL WORKS M/R
Item Rate
365 days
MIDNAPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,238
OFFICE OF THE SUPERINTENDING ENGINEER,SWEC,PWD
18 Dec 2025
25 Apr 2024
6 May 2024
25 Apr 2024
4 May 2024
30 Apr 2024
29 Apr 2024
Amount
Annual comprehensive maintenance contract of existing Split & Window type (1.5Tr / 2.0 Tr Capacity) A.C. machine at different sites under ghatal Electrical Section under Midnapur Electrical Sub Division P.W.Dte. As per detail terms & conditions furnished below :-
a) 1.5/ 2.0Tr. Split type AC Machine.- 82 Nos. (Quantity- 82 Nos x 12 Months = 984 Nos)
b) 1.5/2.0 Tr. Window type AC Machine.- 10 Nos. (Quantity- 10 Nos x 12 Months = 120 Nos)
Allocation :- 1) Ghatal Hospital HDU - 17 Nos. (1.5 Tr. Split type) 2) Ghatal Hospital Labour Ward - 2 Nos. ( 2TR Split type) 3) Ghatal Hospital N.S Room - 1 No. (1.5 Tr. Split type) 4) Ghatal Hospital Superintendent Office- 02 Nos ( 01 no. 1.5TR Split and 1 no 2Tr. split type) 5) Ghatal Hospital Assistant Superintendent Office - 01 No. ( 1.5 TR Split type) 6) Ghatal Hospital Office room no 5 - 02 Nos (02 nos. 1.5TR Split type) 7) Ghatal Hospital pathology section- 02 Nos. (02 nos 1.5TR Split type) 8) Ghatal Hospital Blood bank -06 Nos. (04 nos 2TR window type and 02 nos 1.5 Tr split type) 9) Ghatal Hospital New OPD - 2 Nos (01 no 2TR Window and 1 no 1.5 tr window) 10) Ghatal hospital RKS - 01 No. (1 no 2 Tr Split type) 11) Ghatal hospital cold chain room -1 Nos. (01 no 1.5TR Split) 12) Ghatal hospital room no 21 - 01 No (01 no. 1.5 TR Split) 13) Treasury office - 14 Nos (10 nos. 1.5 TR Split type and 4 nos 2 Tr split type) 14)ARTO Office and meeting Hall- 10 Nos. (06 nos 1.5TR Split & 04 nos 2TR Window type) 15) SDO main Building- 04 Nos ( 02 no. 1.5TR Split and 2 no 2Tr. split type 16) S.D.O Office- 02 Nos ( 2 nos 2Tr Split type) 17) C.R Division Court- 05 Nos ( 02 no. 1.5TR Split and 3 nos 2Tr. split type) 18) ADJ Court - 3 Nos ( 3 Nos 1.5 Tr Split type) 19) J.R Div Court - 05 Nos (5 nos 1.5 Tr Split type ) 20) JM court - 05Nos ( 03 no. 1.5TR Split and 2 nos 2Tr. split type) 21) ACJM Court - 05 Nos ( 5 nos 1.5 Tr split type) 22) Server Room- 01 no ( 1 no 1.5 tr split)
SCOPE OF WORK AND TERMS & CONDITION:-
A) Routine checking and servicing (Preventive maintenance). The rate are inclusive of all taxes. i) Checking & servicing of all mechanical & electrical parts of the A.C.Machine, refrigerant system, condenser & cooling system etc. twice in each month. ii) Checking of performance of each machine, Load Current (Amp) , CFM, grill temperature¸ room temperature etc. twice in a month & these shall be noted, in Log Book. All entries be countersigned by the Agency and the concerned Junior Engineer in the Log Book. iii) In every three months, the Outdoor unit should be thoroughly cleaned and washed by vacuum cleaner and jet spray. iv) All machine shall be numbered according to their location, made and as per direction of E.I.C & Log book be maintained accordingly. v) Cleaning of filters twice in each month. vi) Lubricating the bearing of the motor & fan as and when required vii) Checking the electrical incomer upto incoming M.C.B incl. starter, switches etc. in each month. Any fault located should be brought to the notice of the Asstt. Engineer & Junior Engineer immediately. viii) Checking & repairing of all parts which have not been specified but necessary to keep the machine satisfactory running condition. ix) Agency must be provide a trained attender for operation of ductable type AC machine. x) If any fire hazard occurred due to poor maintenance of the Split/WindowAir Conditioning machine, the liability will goes to solely on the concerned maintenance agency.
B) Overhauling: i) Through overhauling of the machine part by part once in a year. ii) Cleaning & painting of the machine body, base tray etc. once in a year. iii) Cleaning & discalling of condenser unit, cooling coil etc. and gas leak test once & when required in a year. iv) Overhauling shall preferably be done during winter season and must be noted in the Log Book.
C) Supply & Repairing: This comprehensive contract covers preventive & corrective maintenance of A.C. machine/ spare parts as required so as to keep the A.C. machine operative/ functioning round the clock and for ensuring uninterrupted & trouble - free performance of the equipment. i) Replenishing refrigerant required as a result of a leak in system arising out of fair wear & tear as per requirement. ii) Supply of refrigerant shall be made as & when required by the Agency in his own cost for all AC Machine.. iii) Repair of microprocessor controls & to be replaced free of cost for all AC Machine. iv) Replacement capacitor (P2 type) incl. of all spare parts, including compressors (Except Ductable Split type AC machine), shall be made by the Agency for smooth running of the machine at his cost for all AC Machine. v) Filters be changed except nylon filter once in a year & the new once shall be approved by the EIC. vi) Replace/ repair of all spare parts of ductable split type (Like- Refrigerent, blower motor, remote sensing unit, controler, ducting, damper unit, all kind of valve, communication card, contactor and other electrical accerise etc) are to be made agency own cost. vii) No major parts shall be removed without permission of concerned Asstt. Engineer. Challan shall be obtained from Junior Engineer while taking away machine or parts from site for repairing and materials shall be returned/ repaireed within three days to worksite in Co’s challan.
D) Attendance of break down: i) Break downs to be attended by experienced AC machines immediately after receiving initiation from the Junior Engineer, Asstt. Engineer and the authority concerned. ii) AC machine must be provided with cell phone with contact no. iii) Nature of break down with date shall be recorded in the Log Book.
E) TERMS & CONDITION. i) All payments shall be made as per Govt. rules. ii) Agency may raise bills for quarterly payment. He shall submit service challan and Monthly Log Sheet (Format given by department) duly filled & countersigned by the Junior Engineer,& Asstt. Engineer mentioning therein the performance of the machine with grill temperature, room temperature at the time of servicing along with the log book duly signed by the JE & AE concerned. iii) No extra payment shall be made for repairing & replacement of machine parts or refrigerant. iv) The Log Book shall be kept upto-date & ready at Junior Engineer Chamber for verification by higher authority at any time & to be produced whenever demanded by the EIC for verification. v) The Executive Engineer reserves the right to terminate the contract at any time with one month notices. vi) If the Agency fails to make a break down machine operational with in 24 Hrs. or fails to provide replacement of the machine from his own working machine (loan machine), deduction from the bill will be made @`20/- for each day for split machine @ 200/- for each day for ductable type AC machine in excess of 24 Hrs.
SREE KRISHNA ELECTRICAL
BLOOMING ENTERPRISE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .