| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC PANDAVESWAR BARDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDHAMAN | WEST BENGAL | 713346 | ₹15.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹15.8 LRejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | ₹15.8 L | L2 | Rejected-Finance L2 |
| 3 | L3₹16.0 LRejected-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹16.0 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | ANIESH KHAN L1 | SABIR CONSTRUCTION L2 | NANDI ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Lifting of failed 3 nos. of 500 GPM 180 Mtr Head pump and lowering of repaired 03 nos. of 500 GPM 180 Mtr Head pump at no 2 pit . (Inclusive of EPF/CMPF) | ||||||
| 1.01 | Collection and shifting of repaired 500 GPM 180 Mtr Head pump from khottadih to site and fitting (For 3 nos of pumps) | 12 | Skilled manshift | 1,378.52 ₹16,542.24 | 1,399.47 ₹16,793.64 | 1,418.36 ₹17,020.32 |
| 1.02 | Collection and shifting of repaired 500 GPM 180 Mtr Head pump from khottadih to site and fitting(For 3 nos of pumps) | 216 | Semi-skilled manshift | 1,330.39 ₹2.9 L | 1,350.61 ₹2.9 L | 1,368.84 ₹3.0 L |
| 1.03 | Shifting of electricals along with cable of pump(For 3 nos of pumps) | 6 | Skilled manshift | 1,378.52 ₹8,271.12 | 1,399.47 ₹8,396.82 | 1,418.36 ₹8,510.16 |
| 1.04 | Shifting of electricals along with cable of pump(For 3 nos of pumps) | 48 | Semi-skilled manshift | 1,330.39 ₹63,858.72 | 1,350.61 ₹64,829.28 | 1,368.84 ₹65,704.32 |
| 1.05 | Collection and shifting of failed 500 GPM 180 Mtr Head pump from u/g site to workshop(For 3 nos of pumps) | 6 | Skilled manshift | 1,378.52 ₹8,271.12 | 1,399.47 ₹8,396.82 | 1,418.36 ₹8,510.16 |
| 1.06 | Collection and shifting of failed 500 GPM 180 Mtr Head pump from u/g site to workshop(For 3 nos of pumps) | 66 | Semi-skilled manshift | 1,330.39 ₹87,805.74 | 1,350.61 ₹89,140.26 | 1,368.84 ₹90,343.44 |
| 1.07 | Supply of MS Nut Bolt(For 3 nos of pumps) | 3 | LS | 3,500 ₹10,500 | 3,553.2 ₹10,659.60 | 3,601.15 ₹10,803.45 |
| 2.00Rearrangement of pump for sand stowing at No. B pit under Pandaveswar Colliery. (Inclusive of EPF/CMPF) | ||||||
| 2.01 | Transportation of failed MLA 6 stage pump from underground site at 39L/8D at No. B Pit to workshop for repairing along with burnt 200 HP starter(Skilled Manshift) | 3 | Skilled manshift | 1,378.52 ₹4,135.56 | 1,399.47 ₹4,198.41 | 1,418.36 ₹4,255.08 |
Tender Value
₹15.6 L
EMD Value
₹19,500
Closing Date
20 Feb 2026, 9:00 amClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Lifting of failed Pumps and lowering of repaired Pumps, rearrangement of pump for sand stowing, replacement of damaged shaft range pipes with new MS pipe for pumping purpose of pandaveswar Colliery
2026_ECL_352774_1
GM-PND/EandM/25-26/273/1557 dated 09/02/2026
Open Tender
Electrical and Maintenance Works
30 days
Pandaveswar Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹19,500
17 Mar 2026
10 Feb 2026
21 Feb 2026
10 Feb 2026
20 Feb 2026
10 Feb 2026
10 Feb 2026 - 13 Feb 2026
Lifting of failed 3 nos. of 500 GPM 180 Mtr Head pump and lowering of repaired 03 nos. of 500 GPM 180 Mtr Head pump at no 2 pit . (Inclusive of EPF/CMPF)
Collection and shifting of repaired 500 GPM 180 Mtr Head pump from khottadih to site and fitting (For 3 nos of pumps)
Collection and shifting of repaired 500 GPM 180 Mtr Head pump from khottadih to site and fitting(For 3 nos of pumps)
Shifting of electricals along with cable of pump(For 3 nos of pumps)
Shifting of electricals along with cable of pump(For 3 nos of pumps)
Collection and shifting of failed 500 GPM 180 Mtr Head pump from u/g site to workshop(For 3 nos of pumps)
Collection and shifting of failed 500 GPM 180 Mtr Head pump from u/g site to workshop(For 3 nos of pumps)
Supply of MS Nut Bolt(For 3 nos of pumps)
Rearrangement of pump for sand stowing at No. B pit under Pandaveswar Colliery. (Inclusive of EPF/CMPF)
Transportation of failed MLA 6 stage pump from underground site at 39L/8D at No. B Pit to workshop for repairing along with burnt 200 HP starter(Skilled Manshift)
Transportation of failed MLA 6 stage pump from underground site at 39L/8D at No. B Pit to workshop for repairing along with burnt 200 HP starter(Semi Skilled Manshift)
Transportation of repaired Pluro-II 6 stage pump, suction bend and repaired starter from (underground) No. 2 Pit to 39L/8D at No B Pit and fitting it on bedplate(Skilled Manshift)
Transportation of repaired Pluro-II 6 stage pump, suction bend and repaired starter from (underground) No. 2 Pit to 39L/8D at No B Pit and fitting it on bedplate(Semi Skilled Manshift)
Supply of MS Nut Bolt, MS Washer, Oxygen, DA, Hacksaw blade, hammer etc.
Laying & reorganization of MS pipe 6" & foot valve for the repaired pump for suction and delivery pipeline and starting of pump in all respect (Skilled Manshift)
Laying & reorganization of MS pipe 6" & foot valve for the repaired pump for suction and delivery pipeline and starting of pump in all respect (Semi Skilled Manshift)
Transportation of repaired MLA 6 stage pump from workshop to underground at No. 2 Pit (Skilled Manshift)
Transportation of repaired MLA 6 stage pump from workshop to underground at No. 2 Pit (Semi Skilled Manshift)
Replacement of damaged shaft range pipe of 6-inch dia. With new MS pipe at winding shaft to provide smooth water supply to vertical boilers at Pit no. B under Pandaveswar Colliery. (Inclusive of EPF/CMPF)
Collection of 6" MS pipe from Area Atore-16 nos. for 96 mtr. by vehicle
Duggi cutting for Crane support foundation
Fitting of pulley at Head gear and laying of flexible wire rope
Dismantling of old and damaged pipe from winding Shaft of Pit No. B
Lowering and replacement of 6" MS pipe to existing bunton at Pit No. B
Supply and fitting of 32 nos. (Approx.) MS Flange, 6" Bend-03 nos. etc.
Fitting of 32 Flanges (04 Head engaged in one shift for fitting of 16 Flange)
64 nos. of Joint cutting from rejected conveyor belt( 01 Head for cutting 10 joints)
Miscellaneous job like alignment of pipeline, floor cutting, floor levelling, supporting job and leakage rectification
Supply of MS Nut Bolt, MS Washer of different sizes- 1. Nut Bolt 5/8" X 3 inch- 128 nos with washer
Gas cutting job during dismantling including welder and DA oxygen etc.
Supply for fitting of MS Flanges of 6" size as per requirement of pipeline
Supply for fitting of 6" Size MS Bend 03 nos.
Hiring of crane for lowering of pipe in shaft lowering
Rearrangement of pumping system for advancement of section face at No. 2 Pit of Pandaveswar Colliery(Inclusive of EPF/CMPF)
Transportation of 4" MS Pipe along with bedplate and motor, starter, 70 sq.mm cable, switch from 1D to 2D - 42 nos. along with fitting with joints & MS Nut Bolt(Skilled Manshift)
Transportation of 4" MS Pipe along with bedplate and motor, starter, 70sq.mm cable, switch from 1D to 2D - 42 nos. along with fitting with joints & MS Nut Bolt(Semi-Skilled Manshift)
Transportation of failed PI-II 3 stage pump from 39L/1D to workshop(Skilled Manshift)
Transportation of failed PI-II 3 stage pump from 39L/1D to workshop(Semi-Skilled Manshift)
Transportation of repaired PI-II 3 stage pump from 40L/2D to workshop and fitting it on bedplate along with motor, joining of cables with starter, switch and starting of pump in all respect(Skilled Manshift)
Transportation of repaired PI-II 3 stage pump from 40L/2D to workshop and fitting it on bedplate along with motor, joining of cables with starter, switch and starting of pump in all respect(Semi-Skilled Manshift)
Collection and lowering of 6" MS Pipe from Workshop - 12 nos. Lowering of 6" MS Pipe size and transporting to site at No. 2 Pit . Lowering and transporting of 23 Nos. 6" MS Pipes in 1 shift requires 12 heads(Skilled Manshift)
Collection and lowering of 6" MS Pipe from Workshop - 12 nos. Lowering of 6" MS Pipe size and transporting to site at No. 2 Pit . Lowering and transporting of 23 Nos. 6" MS Pipes in 1 shift requires 12 heads(Semi-Skilled Manshift)
Transportation of 12 nos. of 6" MS Pipe on trolley through haulage line upto site and laying on proposed way(Skilled Manshift)
Transportation of 12 nos. of 6" MS Pipe on trolley through haulage line upto site and laying on proposed way(Semi-Skilled Manshift)
Joining of MS Pipe 12 nos. at No.2 Pit(Skilled Manshift)
Joining of MS Pipe 12 nos. at No.2 Pit(Semi-Skilled Manshift)
Lowering of Pluro-II 6 stage pump at 38L/3D along with bedplate, motor, sluice valve, NRV, cable, starter by 2 pillars and fitting it on gthe next foundation and starting of pump(Skilled Manshift)
Lowering of Pluro-II 6 stage pump at 38L/3D along with bedplate, motor, sluice valve, NRV, cable, starter by 2 pillars and fitting it on gthe next foundation and starting of pump(Semi-Skilled Manshift)
Lowering of 4 nos. R-10D pump and 02 nos. Auxiliary Fan stage pump at section face along with motor , cable, starter by 3 pillars and fitting it on the next foundation and statrting of pump and auxilliary fan(Skilled Manshift)
Lowering of 4 nos. R-10D pump and 02 nos. Auxiliary Fan stage pump at section face along with motor , cable, starter by 3 pillars and fitting it on the next foundation and statrting of pump and auxilliary fan(Semi-Skilled Manshift)
Supply of MS Nut Bolt, Lugs, MS washer, GI wire for anchoring etc.
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.44 MB
BOQ_365571.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid