Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.1 LAdmitted-Finance | -37.30% | ₹5.1 L | L1 | Admitted-Finance |
| 2 | L2₹5.2 L+₹18,406.81 (3.64%)Admitted-Finance | -35.02% | ₹5.2 L+₹18,406.81 (3.64%) | L2 | Admitted-Finance |
| 3 | L3₹6.0 L+₹91,307.44 (18.0%)Admitted-Finance | -25.99% | ₹6.0 L+₹91,307.44 (18.0%) | L3 | Admitted-Finance |
| 4 | L4₹7.1 L+₹2.0 L (40.1%)Admitted-Finance | -12.13% | ₹7.1 L+₹2.0 L (40.1%) | L4 | Admitted-Finance |
Tender Value
₹8.1 L
EMD Value
₹16,146
Closing Date
8 Jul 2026, 6:00 pmClosed
EE PHED City Div IV (S) Jaipur
EE PHED City Div IV (S) Jaipur
Repair and preventive maintenance of pipelines under Jurisdiction of Kaveri path JEN Choki City Sub Division XI (S), Mansarover Under City Division IV (S) Jaipur.
2026_PHCJA_571845_1
NIT-08/2026-27
Open Tender
Repair and Maintenance Works
Percentage
365 days
EE PHED City Div IV (S) Jaipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EE PHED City Div IV (S) Jaipur DDO Code 32164
₹16,146
Yes
13 Jul 2026
29 Jun 2026
9 Jul 2026
29 Jun 2026
8 Jul 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintenance of pipelines irrespective of size and material which includes repairing of bursts and leakages, pollution control, survey and removal of choking, disconnection of illegal connections, collection and recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution/ rising main pipelines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of black top, WBM and CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jjointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job, contractor will use their own T&P. Contractor with his own resources shall arrange de-watering, JCB and tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipeline network of rising and distribution pipeline network within the scope of work for per km pipeline per month. Jointing material shall be provided by the department. Minimum labour for a following kms pipelines to be deployed: (Qty =12 months X 62 kms=744) | - | - | - | - |
| 2 | 51 km to 100 km - one fitter-II & two beldar | - | Per KM Per Month | 666.95 | - |
| 3 | Daily/ periodical operation of valves at supply times for specified by department per sluice valve per month. (Valve rod and cap to be arranged by contractor) | - | - | - | - |
| 4 | 80-300mm (10 Nos For 12 Months) | - | Each | 1,016.95 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
TD08.pdf
Tender Documents • 0.69 MB
BOQ_1017551.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .