Tender Value
₹3.1 L
EMD Value
₹3,125
Closing Date
11 Mar 2024, 3:00 pmClosed
The BDO (V.P) Union office Thiruppathur
The BDP (V.P) Union office Thiruppathur
Deepening Desilting and Construction of Leading Channel at Veerani Oorani at A. Thekkur village in A.Thekkur(p.t)
2024_RDTN_442181_1
AGAMT/TPR/A.Thekkur Veerani Oorani
Open Tender
Civil Works
Item Wise
Thiruppathur
Please refer NIT
3 documents required · 3 mandatory
₹0
₹3,125
Yes
25 May 2024
6 Mar 2024
11 Mar 2024
6 Mar 2024
11 Mar 2024
6 Mar 2024
Amount
Deepening Desilting and Construction of Leading Channel at Veerani Oorani at A. Thekkur Village in A.Thekkur panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioni
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as storing shuddering and balling out water in necessary etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering items including cost & conveyance of all materials to site and all labour charges etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
B.Subbulakshmi
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .