Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC 1 1A VANSITART ROW 2ND FLOOR ROOM NO 2 KOL 700 001 | KOLKATA | KOLKATA | WEST BENGAL | 700001 | ₹2.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.4 CrRejected-Finance 4 HO CHI MINH SARANI KOLKATA 700071 | KOLKATA | KOLKATA | WEST BENGAL | 700071 | ₹2.4 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹2.4 CrRejected-Finance 1 1 A VANSATTART ROW 3RD FLOOR ROOM NO 2A | ₹2.4 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹2.5 CrRejected-Finance BALITIKURI KALITALA DAMODAR APARTMENT 2ND FLOOR HOWRAH 711113 WEST BENGAL | HOWRAH | HOWRAH | WEST BENGAL | 711113 | ₹2.5 Cr | L4 | Rejected-Finance L4 |
Tender Value
₹2.4 Cr
EMD Value
₹4.8 L
Closing Date
9 Mar 2026, 3:00 pmClosed
SE/SWC, PHE Dte.
33 and 33/1, Chetla Central Road, CIT Market, 2nd Floor, Kolkata 700027
Operation and maintenance of 148 nos. Integrated water supply scheme of Kakdwip Block under Kakdwip Sub-Division under Alipore Division, P.H. Engineering Dte.
2026_PHED_1003107_3
12/2025-2026/SE/SWC/WBPHED
Open Tender
CIVIL WORKS
365 days
South 24 Paranas
Please refer Tender documents.
4 documents required · 4 mandatory
₹4.8 L
13 May 2026
10 Feb 2026
11 Mar 2026
10 Feb 2026
9 Mar 2026
11 Feb 2026
Operation and Maintenance of Various Integrated Water Supply Schemes under Kakdwip Sub - Division of Alipore Division, P.H.E. Dte. The Agency will impart sufficient knowledge based to the representatives of the schools, so as to maintain the whole system in letter and sprit. this does not include any spares and raw materials for Operation & Maintenance of the schemes. The agency should take adequate care for proper operation and day to day - weekly - monthly preventive maintenance to keep system healthy. All the machines and apparatus electrical panel board, switch, gears etc. to be monitored and checked for its proper functioning. The agency should also ensure the preventive maintenance schedule. The work should comprise of monthly scheme visit including water sample collection and submission of the same at PHE Laboratory, periodical disinfection, cleaning and checking of solar cell, pump controller, battery, pumps and plumbing accessories etc. Efficient fault booking system must be maintained by the agency keeping close liason between schools and EIC. Fault indified should be rectifited within 72 hours. Materials required for maintenance work should be issued from the Sub Divisional Store on submission of requisition approved by EIC and all unservicable materials must be returned back to Sub Divisional Store. (No additional carriage is admissible in this regard) (This item should be done after Repair of the damaged Integrated Water Supply Schemes) 148 nos. x 12 months = 1776 nos.
Replacing the damaged 1.00 HP capacity DC Solar Photovoltaic Submersible Pump set (900 watt., designed to use with solar power) by new one including supplying to site, fixing and return back the damaged pump to the Sub - Divisional store including transporation charges of road ways as well as water ways, labour charges of withdrawal of the damaged one and lowering of the new one and maintenance for the duration of f 12 (twelve) months from the installation date.
Replacing the damaged Pump controller for successful operation of the 1.00 HP capacity Solar Photovoltaic Submersible Pump set by new one including supplying to site, fixing and return back the damaged pump controller to the Sub - Divisional Store including transportation charges of road ways as well as water ways, labour charges and maintenance for the duration of f 12 (twelve) months from the installation date.
Replacing the damaged 250 watt. Pack capacity Solar Photovoltaic array panel by new one including supplying to site, fixing including transportation charges of road ways as well as water ways, labour charges and maintenance for the duration of 12 (twelve) months from the installation date.
Replacing the damaged Electric Cable, 3 Core 4 sqm. For submersible Pump by new cable including supplying to site, fixing including transportation charges of road ways as well as water ways, labour charges and maintenance for the duration of 2 (two) months from the installation date.
Supplying fitting fixing of Brass Cylinder - 50 mm for India Mark - II Pump Set.
Supplying fitting fixing 2500 ltr. Capacity multi layer HDPE, water storage tank with closed top.
Supplying, fitting and fixing PVC pipes of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads,fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately)
(a) For Exposed Work PVC Pipes (Dia)
i) 15 mm dia.
ii) 25 mm dia.
Supplying, fitting and fixing bib cock or stop cock.
(e) PTMT (Polytetra Bib Cock / Stop Cock ( Prayag or equivalent) 15 mm
(Z) Compact Compact Ball Valve with SS Handle For CPVC/ UPVC Fittings.
Surging of existing tube well with chemical treatment and bucket wash (prior to use of compressor machine) and developing the tube well with compressor machine at least 3 (three) days at 8 (eight) hours per day till the yield is obtained at least by 75% of the total specified yield of the tube well (measured by 'V' notch tank) and draw down is within the permissible limit of 10% variation and water so obtained after such washing and developing will be free from sand and bacteria for which test report from the Public Analyst is to be obtained. (The rate is inclusive of all labour and materials including hire charges of tools and plants and cost of materials.) (a) For tube well from 40 mm to 100mm top enlarged to have yield from 1500 to 3000 gallons per hour as per size and yield.
Add @ 18% GST on item no. 8,9,10,11 i.e. on Rs.8,95,844.00
Add Cess @ 1% on item no. 8,9,10,11 and on GST i.e. on Rs.10,57,095.92
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
Tendernotice_2.pdf
PDF • 0.52 MB
BOQ_2458783.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid