Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.0 Cr+₹22.2 L (3.27%)Rejected-Finance 86 PURUSOTTAM ROY STREET KOLKATA 700007 | KOLKATA | BANKURA | WEST BENGAL | 700007 | L2 | Rejected-Finance L2 | |
| 3 | L3₹7.3 Cr+₹49.1 L (7.22%)Rejected-Finance 159 KAILASH GHOSHI ROAD KOLKATA WEST BENGAL 700008 | KOLKATA | KOLKATA | WEST BENGAL | 700008 | L3 | Rejected-Finance L3 | |
| 4 | L4₹7.7 Cr+₹90.4 L (13.3%)Rejected-Finance 1 PARSWADA POST SHAHAGANJ VILLAGE | INDORE | INDORE | MADHYA PRADESH | L4 | Rejected-Finance L4 | |
| 5 | L5₹9.9 Cr+₹3.1 Cr (45.6%)Rejected-Finance 2ND FLOOR 39 4166 SHEMA BUILDING M G ROAD RAVIPURAM KOCHI ERNAKULAM KERALA 682016 | KOCHI | ERNAKULAM | KERALA | 682016 | L5 | Rejected-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
7 Aug 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
D.G. (WS)
5, S. N. BANERJEE ROAD, KOLKATA-700013
Operation and maintenance of 50 MGD capacity Water Treatment Plant and 110 MGD Capacity Raw Water Pumping Station of Garden Reach Water Works.
2020_KMC_289151_1
KMC/WS/GRWW/T-01(R-1)/2020-21
Open Tender
Project Work
Lump-sum
730 days
Garden Reach Water Works
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10 L
OFFICE OF THE DIRECTOR GENERAL (WATER SUPPLY)
2 Feb 2021
10 Jul 2020
10 Aug 2020
10 Jul 2020
7 Aug 2020
17 Jul 2020
14 Jul 2020
180 days
Amount
Operation & Maintenance of 50 MGD capacity Water Treatment Plant, Clear Water Pump House and 110 MGD Capacity Raw Water Pumping Station of Garden Reach Water Works, KMC {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 50 MGD Drinking Water } and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document.) IN ORDER TO MAINTAIN THE UNINTERRUPTED PRODUCTION OF POTABLE WATER FROM 50 MGD WTP and 110 MGD Capacity Raw Water Pumping Station. (For the period of first 12 months).
Labour component (38% of Total cost) : This monthly cost remains unaltered from the date of commencement of work till a new order (as per circular of mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the first increment will be in effect.
Other than labour component (62% of Total cost) : This monthly cost remains unaltered from the date of commencement of work till end of first twelve months. This also indicates the base cost upon which monthly cost of second year will be determined.
Operation & Maintenance of 50 MGD capacity Water Treatment Plant, Clear Water Pump House and 110 MGD Capacity Raw Water Pumping Station of Garden Reach Water Works, KMC {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 50 MGD Drinking Water } and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document.) IN ORDER TO MAINTAIN THE UNINTERRUPTED PRODUCTION OF POTABLE WATER FROM 50 MGD WTP and 110 MGD Capacity Raw Water Pumping Station(For the period of subsequect 12 months).
Labour component (38% of Total cost) : This monthly cost remains unaltered from the commencement of just previous determined rate till a new order (as per circular of Mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the next increment will be in effect.
Other than labour component (62% of Total cost) :This monthly cost is increased at the rate of five percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined.
OM CORPORATION
POWER INDIA
VA Tech Wabag Limited
VOLTAS LIMITED
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .