Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.4 LAccepted-AOC | ₹16.4 L Quoted ₹15.9 L | L1 | Accepted-AOC M/s priyanka enterprises awarded this tender after negotiation with project tender committee. |
| 2 | L2₹16.8 L+₹94,809.95 (5.96%)Rejected-AOC | ₹16.8 L+₹94,809.95 (5.96%) | L2 | Rejected-AOC M/s priyanka enterprises awarded this tender after negotiation with project tender committee.So L2 BIDDER REJECTED. |
| 3 | L3₹17.3 L+₹1.4 L (8.78%)Rejected-AOC | ₹17.3 L+₹1.4 L (8.78%) | L3 | Rejected-AOC M/s priyanka enterprises awarded this tender after negotiation with project tender committee.So L3 bidder rejected. |
| Sl No | Description | Qty | Unit | PRIYANKA ENTERPRISES L1 | M/S R.P. CONSTRUCTION CO. L2 | M/S R L ENGINEERING L3 |
|---|---|---|---|---|---|---|
| 1.00 | Routine & Breakdown Maintenance of lighting/illumination systems of main plant and BOP area as per scope of work part B serial no. 01 to 29. 138 jobs for Morning shift (06:00 to 14:00 hrs) & 138 jobs for evening shift (14:00 hrs to 22:00 hrs ) & 26 jobs for night emergency. | 302 | No. | 1,021 ₹3,08,342 Lowest | 1,115 ₹3,36,730 | 1,181 ₹3,56,662 |
| 2.00 | Routine & Breakdown Maintenance & Upkeeping of boundary wall lighting, plant and offices lighting and their switching ON/OFF of lighting fixtures and panels, Dewatering pump of 2x110 MW PTPP Parichha as per scope of work | 4.6 | No. | 60,551 ₹2,78,534.6 | 57,200 ₹2,63,120 Lowest | 67,579 ₹3,10,863.4 |
| 3.00 | Re-sagging of old conductor, 3 phase & 4 wires per meter. | 1 | RM. | 16 ₹16 | 13.5 ₹13.5 Lowest | 18 ₹18 |
| 4.00 | Stringing & sagging of new ACSR weasel conductor along-with supply of conductor. | 1 | RM. | 40 ₹40 | 37.25 ₹37.25 Lowest | 45 ₹45 |
| 5.00 | Chopping & cutting of tree branches. | 1 | Job | 13,140 ₹13,140 | 12,170 ₹12,170 Lowest | 14,655 ₹14,655 |
| 6.00 | Removing the bird nest & waste material from pole. | 1 | Job | 4,621 ₹4,621 | 4,280 ₹4,280 Lowest | 5,158 ₹5,158 |
| 7.00 | Supply & fixing /replacement of phase separator. | 1 | No. | 16 ₹16 | 15 ₹15 Lowest | 48 ₹48 |
| 8.00 | Straightening & strengthening of poles with grouting & plinth making at required level. | 1 | No. | 1,793 ₹1,793 | 1,660 ₹1,660 Lowest | 2,001 ₹2,001 |
| 9.00 | Dismantling of single pole as per scope of work. | 1 | No. | 1,280 ₹1,280 | 1,185 ₹1,185 Lowest | 1,429 ₹1,429 |
| 10.00 | Erection of single pole as per scope of work. | 1 | No. | 2,498 ₹2,498 | 2,310 ₹2,310 Lowest | 2,788 ₹2,788 |
Tender Value
₹16.0 L
EMD Value
₹20,000
Closing Date
28 Jul 2025, 11:00 amClosed
SE OMC-IV BTPS PTPP
O/o SE OMC IV BTPS PTPP
Routine Breakdown and Misc. Electrical Maintenance of lighting/illumination/Battery Battery charger/DG set/ DC System/Exhaust fans/EOT Hoist of main plant and BOP area of BTPS PTPP Parichha
2025_RVUNL_1052114_1
N-PAR////6000008836_00
Open Tender
Electrical Works
Lump-sum
138 days
2X210 MW BTPS
As per PQC
2 documents required · 2 mandatory
₹1,180
Dy. CAO, CFA BO, PTPP, Parichha,JHANSI
₹20,000
15 Nov 2025
27 Jun 2025
28 Jul 2025
27 Jun 2025
28 Jul 2025
27 Jun 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .