Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC GSTIN: 19AGWPB6057E2Z3, 19AGWPB6057EZZ3MALDA 732101 | MALDA | MALDA | WEST BENGAL | 732101 | ₹6.0 L | L1 | Accepted-AOC L1-Accepted |
| 2 | L2₹6.0 LRejected-Finance GSTIN: 19AHCPT1950H1Z6, 19AHCPT1950H1ZGMALDA MOKDUMPUR SOUTH MALANCHA PALLY | MALDA | MALDA | WEST BENGAL | ₹6.0 L | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹6.0 LRejected-Finance GSTIN: 19AACCH9135N1Z1, 19AACFD3344C1ZV, 19AACFO0832E1ZL, 19ADAPG5283A1ZX, 19AEEPD6034P1Z8, 19AEXPC3746A1ZG, 19AGVPD9724H1ZT, 19AMFPD7752B1Z8, 19ANXPD9601L1ZB, 19AOXPD9320B1ZU, 19CAFPD9818Q1ZX, 19CEVPD1860E1ZC, 19CMLPD0247B1ZG00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 UDYAM WB 23 0013338 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | ₹6.0 L | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | DEY ENTERPRISE L3 | SHREE BISHNU CONSTRUCTION L1 | MAA BHABOTARINE ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.00PART-A Labour charges for 2 (Two) nos operating personnel for operation of pumping machinery of each pump house by manual panel including operation of valves, disinfection arrangement, internal/ external illuminations as per specification and round the clock guarding of the whole installation with all accessories. | ||||||
| 1.01 | For P/H- I | 365 | days | 1,196 ₹4.4 L | 1,192 ₹4.4 L | 1,195 ₹4.4 L |
| 1.02 | ESIC Contribution for Employers for Sl No. 1 @3.25% | 365 | Days | 30.23 ₹11,033.95 | 30.23 ₹11,033.95 | 30.23 ₹11,033.95 |
| 1.03 | EPF Contribution for Employers for Sl No. 1 @13% (For Establishment having 20 employees or more) | 365 | Days | 120.9 ₹44,128.50 | 120.9 ₹44,128.50 | 120.9 ₹44,128.50 |
| 2.00PART-B Supervision charges for electrical installation by licensed electrician as per IE Rules, 1956 read with latest amendments, overhead expenditures as per specification and direction of E.I.C. | ||||||
| 2.01 | For P/H- I | 12 | Months | 8,695 ₹1.0 L | 8,682 ₹1.0 L | 8,690 ₹1.0 L |
| 3.00 | Add Cess @ 1% | 1 | item | 5,960.42 ₹5,960.42 | 5,944.26 ₹5,944.26 | 5,956.17 ₹5,956.17 |
Tender Value
Refer Docs
EMD Value
₹12,150
Closing Date
27 Jan 2025, 4:30 pmClosed
Executive Engineer, Malda Mechanical Division,PHED
Office of the Executive Engineer, Malda Mechanical Division, PHE Dte., Daulatpur PHE Complex, Maliha, Malda- 732102
Operation and Guarding of pumping machinery (Manual Operation) including all allied electro-mechanical components installed at RAIGANJ HOSPITAL W/S Scheme in the district of Uttar Dinajpur under MLMD, PHE Dte.
2025_PHED_798103_23
WBPHED/EE/MLMD/NIeT_35 of 2024-2025
Open Tender
Electrical Work/ Equipment
365 days
Daulatpur PHE Complex, Maliha, Malda
Please refer Tender documents.
4 documents required · 4 mandatory
₹12,150
Yes
26 May 2026
11 Jan 2025
29 Jan 2025
11 Jan 2025
27 Jan 2025
11 Jan 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid