| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 0.04₹4.9 LAccepted-Finance | ₹4.9 L | 0.04 | Accepted-Finance less |
| 2 | 0.55₹4.9 LRejected-Finance | ₹4.9 L | 0.55 | Rejected-Finance more |
| Sl No | Description | Qty | Unit | VELAYATHAM RAMESH L2 | BALASUBRAMANIAN G L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank within initial lead of 10 M and initial lift of 2M in hard stiff clay, stiff black cotton, soil, hard red earth, shales, murrams gravel stoney earth and earth mixed with small size boulders and hard gravelly soil as per SS 20B for foundation. | 85 | m3 | 205 ₹17,425 | 205 ₹17,425 |
| 2.00 | Supplying and filling in foundation and basement with filling M SANDin layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. | 11 | m3 | 1,750 ₹19,250 | 1,698 ₹18,678 |
| 3.00 | Cement concrete 1:4:8 ( one cement fourand and eight aggregate ) mix using 40mm ISS size HBG metal including cost conveyance of all materials to site including conveyance of all materials the work site and all other incidental charge for laying, compacting, curing etc. complete. | 11 | m3 | 5,400 ₹59,400 | 5,379 ₹59,169 |
| 4.00 | Centering for side and soffits of plain surface including strutting 3m high using MS Steel of size 90cm and 10 gauge fitted with MS angle of size 25 x25 x 3mm laid over silver oak (C wood) fasts of size 10 X6.50cm spaced at about 90 c/c and supported by casuarinas props 10 to 13cm dia spaced at 75cm c/c complying with standard specification. | 222 | m2 | 460 ₹1.0 L | 460 ₹1.0 L |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 26 | m3 | 6,800 ₹1.8 L | 6,752 ₹1.8 L |
| 6.00 | Plastering with cement mortar (1:5) 12mm ,thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (S.I.306) | 42 | m2 | 270 ₹11,340 | 270 ₹11,340 |
| 7.00 | Supplying and fabrication of steel including cost of binding wire, labour charges,etc., complete as per standard specification. | 60 | Kg | 89 ₹5,340 | 89 ₹5,340 |
| 8.00 | Reinforced cement concrete 1:1.5:3( one cement one and halfsand and threeaggregate )mix using 20mm HBG metal including curing and cost and Conveyance of all materials to site and all labour charges etc., completed as per standard specification. | 1 | m3 | 9,100 ₹9,100 | 9,001 ₹9,001 |
| 9.00 | Plain Cement Concrete 1:1.5:3 (one cement, One and Half sand and Three hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 2 | m3 | 7,550 ₹15,100 | 7,396 ₹14,792 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
27 Feb 2026, 3:00 pmClosed
COMMISSIONER VIRUDHACHALAM
VIRUDHACHALAM MUNICIPALITY
Providing Storm water drain at Vadakku veerapandiyan street ward no.09 in Vridhachalam Municipality
2026_MAWS_661447_1
4551/2025/E1-GF1
Open Tender
Civil Works
90 days
WORKS
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹5,000
Yes
11 Mar 2026
19 Feb 2026
27 Feb 2026
19 Feb 2026
27 Feb 2026
19 Feb 2026
Earth work excavation and depositing on bank within initial lead of 10 M and initial lift of 2M in hard stiff clay, stiff black cotton, soil, hard red earth, shales, murrams gravel stoney earth and earth mixed with small size boulders and hard gravelly soil as per SS 20B for foundation.
Supplying and filling in foundation and basement with filling M SANDin layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification.
Cement concrete 1:4:8 ( one cement fourand and eight aggregate ) mix using 40mm ISS size HBG metal including cost conveyance of all materials to site including conveyance of all materials the work site and all other incidental charge for laying, compacting, curing etc. complete.
Centering for side and soffits of plain surface including strutting 3m high using MS Steel of size 90cm and 10 gauge fitted with MS angle of size 25 x25 x 3mm laid over silver oak (C wood) fasts of size 10 X6.50cm spaced at about 90 c/c and supported by casuarinas props 10 to 13cm dia spaced at 75cm c/c complying with standard specification.
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Plastering with cement mortar (1:5) 12mm ,thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (S.I.306)
Supplying and fabrication of steel including cost of binding wire, labour charges,etc., complete as per standard specification.
Reinforced cement concrete 1:1.5:3( one cement one and halfsand and threeaggregate )mix using 20mm HBG metal including curing and cost and Conveyance of all materials to site and all labour charges etc., completed as per standard specification.
Plain Cement Concrete 1:1.5:3 (one cement, One and Half sand and Three hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.29 MB
BOQ_793913.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid