Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAdmitted-Finance | ₹11.7 L | L1 | Admitted-Finance |
| 2 | L2₹13.5 LAdmitted-Finance | ₹13.5 L | L2 | Admitted-Finance |
| 3 | L3₹25.1 LAdmitted-Finance | ₹25.1 L | L3 | Admitted-Finance |
| 4 | L4₹27.3 LAdmitted-Finance | ₹27.3 L | L4 | Admitted-Finance |
| 5 | L5₹27.5 LAdmitted-Finance | ₹27.5 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Patiaya Enterprises L11 | M/S NEW TRIKUTA TECHNOCRATES L16 | SUMIT SHARMA GOVT CONTRACTOR L13 | nicod ltd L6 | M/S A A ENTERPRISES L17 | M/s GCS Associates L8 | M/S DAYAL BUILD TECH L14 | M/s MEHRA ASSOCIATES L7 | JANAID AHMED L1 | M/S star Electrical L9 | M/S SIGMA CONSTRUCTION L15 | M/S SALARIA ENTERPRISES L5 | M/S NEELKANTH HARDWARE STORE L2 | M/S SURYA ENTERPRISES L3 | M/S SWASTIC ELECTRICAL CONTRACTOR AND SUPPLIERS L12 | RATHER ELECTRICALS AND CONTRACTOR L10 | M/S KUNDAL ELECTRICAL WORKS AND SUPPLIERS L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Auto-Transformers/Power Transformers /Auxillary Transformers:- A) Checking of Auto starting of fans, External cleaning of radiators,oil pumps OFAF/ONAF,Cleaning and checking of marshalling boxes of transformer/reactor and OLTC, (ii) Tightening of terminations, Checking of OLTC driving mechanism, Electrical checking/ testing of pressure relief device, Buchholz relay, OLTC surge relay/ checking of alarm/ trip and checking/ replacement of the gaskets of the terminal box, Checking / Tightning of earthing connections, Checking of earth resistance of Neutral, Replacement of Silca Gel of breathers and oil topping of transformers and tightning of bushing clamps on HV/IV/LV sides of 4X66.67mva, 4X40 mva, auto transformers and 20MVA to 50MVA power transformers including tandelta testing of bushing/ winding & DGA/ BDV/PPM testing of transformer oil.other tests on the transformer like ratio test, IR value/ Magnetic balance/ short circuit test etc. Checking of space heater and illumination | ||||||||||||||||||||
| 1.01 | 66.67 MVA 1 Ø, 220/132 KV | 1 | No. | 21,000 ₹21,000 | 72,000 ₹72,000 | - | 30,100 ₹30,100 | 1,00,000 ₹1 L | 27,800 ₹27,800 | 65,000 ₹65,000 | 30,200 ₹30,200 | 20,800 ₹20,800 | 29,400 ₹29,400 | 70,000 ₹70,000 | 30,000 ₹30,000 | 25,100 ₹25,100 | 35,000 ₹35,000 | 50,000 ₹50,000 | 55,000 ₹55,000 | 30,000 ₹30,000 |
| 1.02 | 40MVA 1 Ø, 220/132 KV | 1 | No. | 35,500 ₹35,500 | 72,000 ₹72,000 | - | 29,100 ₹29,100 | 1,00,000 ₹1 L | 25,500 ₹25,500 | 65,000 ₹65,000 | 29,200 ₹29,200 | 22,600 ₹22,600 | 29,400 ₹29,400 | 70,000 ₹70,000 | 30,000 ₹30,000 | 22,995 ₹22,995 | 35,000 ₹35,000 | 48,000 ₹48,000 | 55,000 ₹55,000 | 29,000 ₹29,000 |
| 1.03 | 50 MVA 132/66 KV | 1 | No. | 19,000 ₹19,000 | 72,000 ₹72,000 | - | 28,100 ₹28,100 | 1,00,000 ₹1 L | 25,000 ₹25,000 | 65,000 ₹65,000 | 28,200 ₹28,200 | 19,600 ₹19,600 | 25,000 ₹25,000 | 70,000 ₹70,000 | 29,000 ₹29,000 | 19,985 ₹19,985 | 30,000 ₹30,000 | 45,000 ₹45,000 | 54,000 ₹54,000 | 28,000 ₹28,000 |
| 1.04 | 20 MVA 132/66 KV | 1 | No. | 15,000 ₹15,000 | 72,000 ₹72,000 | - | 25,100 ₹25,100 | 1,00,000 ₹1 L | 21,400 ₹21,400 | 65,000 ₹65,000 | 25,200 ₹25,200 | 15,200 ₹15,200 | 18,750 ₹18,750 | 70,000 ₹70,000 | 26,000 ₹26,000 | 14,980 ₹14,980 | 28,000 ₹28,000 | 35,000 ₹35,000 | 52,000 ₹52,000 | 25,000 ₹25,000 |
| 1.05 | 50 MVA 132/66 KV | 1 | No. | 16,000 ₹16,000 | 72,000 ₹72,000 | - | 28,100 ₹28,100 | 1,00,000 ₹1 L | 23,700 ₹23,700 | 65,000 ₹65,000 | 28,200 ₹28,200 | 14,700 ₹14,700 | 25,000 ₹25,000 | 70,000 ₹70,000 | 27,000 ₹27,000 | 20,100 ₹20,100 | 28,000 ₹28,000 | 50,000 ₹50,000 | 52,000 ₹52,000 | 28,000 ₹28,000 |
| 1.06 | 50MVA, 132/33KV | 1 | No. | 16,000 ₹16,000 | 72,000 ₹72,000 | - | 27,100 ₹27,100 | 1,00,000 ₹1 L | 22,600 ₹22,600 | 65,000 ₹65,000 | 27,200 ₹27,200 | 14,000 ₹14,000 | 25,000 ₹25,000 | 70,000 ₹70,000 | 27,000 ₹27,000 | 20,050 ₹20,050 | 28,000 ₹28,000 | 50,000 ₹50,000 | 52,000 ₹52,000 | 27,000 ₹27,000 |
| 1.07 | 20 MVA 132/33 KV | 1 | No. | 15,000 ₹15,000 | 72,000 ₹72,000 | - | 25,100 ₹25,100 | 1,00,000 ₹1 L | 17,900 ₹17,900 | 65,000 ₹65,000 | 25,200 ₹25,200 | 15,700 ₹15,700 | 19,000 ₹19,000 | 70,000 ₹70,000 | 26,000 ₹26,000 | 15,070 ₹15,070 | 24,555 ₹24,555 | 45,000 ₹45,000 | 52,000 ₹52,000 | 25,000 ₹25,000 |
| 1.08 | 1000 KVA, 66/11 KV | 1 | No. | 7,500 ₹7,500 | 72,000 ₹72,000 | - | 10,200 ₹10,200 | 1,00,000 ₹1 L | 6,300 ₹6,300 | 65,000 ₹65,000 | 10,200 ₹10,200 | 15,300 ₹15,300 | 6,250 ₹6,250 | 70,000 ₹70,000 | 10,000 ₹10,000 | 5,100 ₹5,100 | 19,999 ₹19,999 | 35,000 ₹35,000 | 52,000 ₹52,000 | 10,000 ₹10,000 |
| 1.09 | 500 KVA, 66/11 KV | 1 | No. | 5,500 ₹5,500 | 72,000 ₹72,000 | - | 9,100 ₹9,100 | 1,00,000 ₹1 L | 6,300 ₹6,300 | 65,000 ₹65,000 | 9,200 ₹9,200 | 16,000 ₹16,000 | 6,270 ₹6,270 | 70,000 ₹70,000 | 9,500 ₹9,500 | 5,100 ₹5,100 | 15,000 ₹15,000 | 15,000 ₹15,000 | 52,000 ₹52,000 | 9,000 ₹9,000 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
31 Mar 2026, 4:00 pmClosed
Executive Engineer TLMD-V
Office of the Executive Engineer TLMD-V,JKPTCL Ambedkar Chowk Jammu
Rate Contract for Preventive or Routine or Breakdown of Equipments in Various Grid Stations and Transmission lines falling under the Jurisdiction of TLMD V, JKPTCL
2026_PDD_305554_1
TLMD-V/J/09 of 2025-26 dated 07/03/2026
Open Tender
Electrical and Maintenance Works
1 days
Jammu Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Executive Engineer TLMD V
₹50,000
Jammu
21 Apr 2026
9 Mar 2026
2 Apr 2026
9 Mar 2026
31 Mar 2026
11 Mar 2026
10 Mar 2026
Auto-Transformers/Power Transformers /Auxillary Transformers:- A) Checking of Auto starting of fans, External cleaning of radiators,oil pumps OFAF/ONAF,Cleaning and checking of marshalling boxes of transformer/reactor and OLTC, (ii) Tightening of terminations, Checking of OLTC driving mechanism, Electrical checking/ testing of pressure relief device, Buchholz relay, OLTC surge relay/ checking of alarm/ trip and checking/ replacement of the gaskets of the terminal box, Checking / Tightning of earthing connections, Checking of earth resistance of Neutral, Replacement of Silca Gel of breathers and oil topping of transformers and tightning of bushing clamps on HV/IV/LV sides of 4X66.67mva, 4X40 mva, auto transformers and 20MVA to 50MVA power transformers including tandelta testing of bushing/ winding & DGA/ BDV/PPM testing of transformer oil.other tests on the transformer like ratio test, IR value/ Magnetic balance/ short circuit test etc. Checking of space heater and illumination
66.67 MVA 1 Ø, 220/132 KV
40MVA 1 Ø, 220/132 KV
50 MVA 132/66 KV
20 MVA 132/66 KV
50 MVA 132/66 KV
50MVA, 132/33KV
20 MVA 132/33 KV
1000 KVA, 66/11 KV
500 KVA, 66/11 KV
53.3 MVA SINGLE PHASE 220/66/11KV
11/.415KV, 630 KVA AUXILLIARY TRANSFORMER
250KVA,33/0.440KV
250KVA,11/0.440KV
Draning/ De-sludging of transformer oil of transformers
Filling of oil, filitration and dehydration of transformer including installation of vacume pump to be provided by the Department.
Reparing of cooloing fans of transformers including replacement of damaged winding, bearing,MCBs,Contactors, wiring of control circuitsetc.
Lifting of top lid of power transformer for complete physical inspection & replacement of gaskets.
Replacement of damaged core bolts/Earthning strip etc.
Testing of Transformer:-
Testing of Transformer:- tandelta testing of bushing/ winding & BDV testing of transformer oil.other tests on the transformer like ratio test, IR value/ Magnetic balance/ short circuit test etc, kits for testing shall be provided by the department.
DGA and PPM of Transformer from accredted laboratories.
Replacement of damaged/outlived bushing having high tan delta including crane/ mechanical equipment if required.
220 KV Bushing
132 KV Bushing
66 KV Bushing
33 KV Bushing
11 KV Bushing
Dismantling,Dragging,loading,unloading and assembling of autotransformer/Power transformer/Auxillary transformer from loading site to Working site
66.67 MVA 1 Ø, 220/132 KV
40MVA 1 Ø, 220/132 KV
50 MVA 132/66 KV
20 MVA 132/66 KV
50 MVA 132/66 KV
50MVA, 132/33KV
20 MVA 132/33 KV
1000 KVA, 66/11 KV
500 KVA, 66/11 KV
53.3 MVA SINGLE PHASE 220/66/11KV
11/.415KV, 630 KVA AUXILLIARY TRANSFORMER
250KVA,33/0.440KV
250KVA,11/0.440KV
Carraige of autotransformer/Power transformer/Auxillary transformer
66.67 MVA 1 Ø, 220/132 KV
40MVA 1 Ø, 220/132 KV
50 MVA 132/66 KV
20 MVA 132/66 KV
50 MVA 132/66 KV
50MVA, 132/33KV
20 MVA 132/33 KV
1000 KVA, 66/11 KV
500 KVA, 66/11 KV
53.3 MVA SINGLE PHASE 220/66/11KV
11/.415KV, 630 KVA AUXILLIARY TRANSFORMER
250KVA,33/0.440KV
250KVA,11/0.440KV
Overhauling of Circuit Breaker :- VCB/MOCB/SF6/ACB Checking of oil/gas pressure drop during duty cycle operation check, Checking of auto-starting / stopping of oil pump,pressure switch setting,etc, Checking of healthiness of accumulator by checking the pre-charging pressure when building up pressure from zero, Checking of operation of safety valve, checking of air compressor, Cleaning of breaker units, checking of protection equipments and replacement of defective ones, i.e., complete inspection and testing of SF6/VCB/MOCB/ACB type circuit breakers inclusive of operating mechanism.Checking of driving mechanism, trip/closing circuits/ checking and repairing of spring charge motor and checking of tripping and closing coils.checking of equipment earthing and strucure earthing. Maintaning gas levels, venting of circuit breakers, replacement of o-rings , gas kits including circuit breaker anylysis by Circuit breaker analyser.Checking of space heater and illumination.Required as per schedule of maintenance
220KV SF6 Breaker
132KV SF6 Breaker
66 KV MOCB/SF6
33 KV VCB
Replacement of damaged pole of the circuit breaker including carriage of the equipment from divisional store to the site of work and back carriage of the damaged equipment to the divisional store
220KV SF6 Breaker
132KV SF6 Breaker
66 KV MOCB/SF6
33 KV VCB
CVT's /CT's /PT's :- Visual checking of earthing HFpoint (in case it is not being used for PLCC,Checking of any breakage or cracks in porclean insulator, Cleaning of CVT capacitor stacks and tightness of terminal connections,Checking and tightness of all connections including earth connections.Checking of healthiness of gaskets, Checking of neutral earthing in CVT, healthiness of all gaskets and oil level and its topping.Measurement of IR value and tightening of all connections and droppers.Primary injection test of CT/PT, Tan delta,knee point value, burden etc.
Replacement of damaged CT/PT including carriage of the Equipment from divisional store to the site of work and back carriage of the damaged equiupment to the divisional store.
Surge Arrestors :- Checking of leakage current(third harmonic resistive current), Testing of counters and leakage current meters, Cleaning of insulators, Checking of earth connections between surge arrester,surge monitor and earth, Checking of leakage current after cleaning of porcelain surface, cleaning of LA insulators. Measurement of IR value and tightening of droppers.
Replacement of damaged Surge Arrestor including carriage of the Equipment from divisional store to the site of work and back carriage of the damaged equiupment to the divisional store.
Isolators :- Maintenance of linkages including transmission gears, stopper bolts. Cleaning of auxiliary switch contacts and greasing with silca grease, cleaning of support insulators, termination contacts, checking of elecctrical / mechanical interlocks with E/S and CB, mounting bolts, alignment, nuts, pins, space heater, illumination, healthiness of gaskets, auxiliary contacts, alignment of earthing blades, operation of earth switch, almunium / copper flexible conductor, earth connections of structures and MB. lubrication of operating mechanism, hinges lock joints, levers, bearings, main contacts, cleaning of post insulators, tightening of clamps.
Replacement of damaged Isolators including carriage of the Equipment from divisional store to the site of work and back carriage of the damaged equiupment to the divisional store.
Reparing of Three phase motors of isolators including replacement of damaged winding and bearing.
Droppers/Jumpers Replacement of damaged / burnt droppers or jumpers of isolators/ breakers/transformers /CT/PT /LA etc. 220/132/66/33 KV Yard.
Clamps: Replacement of damaged/burnt PG/ PAD/T/CT/Bushing clamp etc
Post Insulators :- Checking of insulators for cracks and cleaning of insulators and its replacemnt.
Illumination System :- Checking of healthiness of fittings in station buildings, outdoor switch yard, Tightening of terminals, etc.
Replacement of 200 watt LED in the outdoor switch yard
Replacement of LED/CFL along with fitting in the control room/ division building/office complex
Battery Bank: Checking and cleaning of battery cell terminals, application of patrolum gelly, if required, conduction of battery impendence test and discharge test checking voltage temperature, current, sp. Gravity of individual cells as well as terminals voltage, battery dischrge testing etc.Checking of positive/Negative earth fault of dc.Terminal tightening.
Battery Charger :- Checking of control cards, measurement of test point voltage values, testing of DC earthfault and U/V relays, IR measurement of charger transformer, checking of earthing etc. Checking of charger panel / DCDB for electrical connections, cleanliness etc.
Protection System :- Checking of relays and application of CCl4 for cleaning, replacement of worn out / defunct relays, checking and replacement of control wiring, if required, primery & secondery injection testing,software settings etc.
Cleaning of cable trenches/ ducts including of dressing of cables, trays, racks , repair of damaged duct covers etc
sub main
Gantry Columns and Beams :- Tightening of all nuts / bolts and providing of missing nuts / bolts and replacement of damaged members.
L.T. Transformer :- Testing of oil BDV, IR measurement, Testing /checking of OTI,WTI and Buchholz (if provided, Checking of healthiness of Pressure relief diaphragm, Checking healthiness of Buchholz relay, Checking tightness of earthing connections
L.T Pannel: Cleaning of panels,bus bar insulators etc. Relays Testing, Tightning of all electrical connections,Checking of indicating meters ,Check for change-over facility, if provided,Check operation /indications in OFF Load condition of MCCB,
Earthing Mat :- Measurment of earth resistivity, checking of electrical continuity of equipment earthings, tightening of earthing connectors, removal of rust from bolted earth connectors and tightening and additional earthing wherever required. 220/132/66/33 kV
DC Distribution Board :- Checking of connections, wiring, replacement of wiring if needed and checking of healthiness of all D/C and dc circuits of 33/66/132/220 Kv yards
AC Distribution Board :- Checking of connections, wiring, replacement of wiring if needed,fuses,MCB,bus bar CT, relays,MFM,LT switchs etc and checking of healthiness of all connections and AC circuits of 33/66/132/220 kv yards.
Control Cables: Replacement of damaged/outlived/burnt control cables of different cores including proper ferruling, thimbling and tagging and finally with all appropriate connections including lifting of duct covers and placing them back.
below 10 core
above 10 core
Marshelling koisk:- checking of all Terminal blocks, space heaters, light illumination, checking of all connnections and its cleaning. Fixing of cable glands earthing and checking of all other electrical accessories .
Capacitor Banks :- Checking/ tightening of capacitor cells terminals, reactor and checking its wiring connection and its control circuit.etc
BUS BAR :- Replacement of damaged ACSR Conductor along with its fittings.
220 kv yard
132 kv yard
66 kv yard
33 kv yard
Automatic voltage regulator:- checking and tightening of connections, auto control unit, oil and its overhaulling
Diesel Generator set: Maintenance and checking of its operation.
Deweeding of switch yard
Painting of outdoor equipments (Transformers, MK's, CT/PT/CVT, Protection wall, Circuit breaker, isolatores, poles etc.
AC Units: Checking and Servicing of Installed AC unit inside control room (1- 3 Ton) /office building/division building/residential quarters etc
White-Washing of Control Room/Residencial Quarters at Grid Stations, Guest house and Divisional Office building
Upkeep of Sanitary installed in the control room/ office building/division building/residential quaters/Toilets and replacement of any damaged item if required.
Upkeep of electrical accessories installed in the control room/ office building/division building/residential quarters and replacement of any damaged item if required.
Providing of skilled/ semi skilled/ un skilled labour for the works which are not coverd from s.no. 1 to 29
skilled labour
semi- skilled
un skilled
Store Handling
Unloading of Material in the Divisional store
220/132/66/33 KV Breaker
220/132/66/33 KV CT's
220/132/66/33 KV PT's
220/132/66/33 KV LA's
220/132/66/33 KV Isolator
Carriage of Material from Unloading site to stacking site and stacking the material properly
220/132/66/33 KV Breaker
220/132/66/33 KV CT's
220/132/66/33 KV PT's
220/132/66/33 KV LA's
220/132/66/33 KV Isolator
Shifting of material to make the space for adjustment of material
220/132/66/33 KV Breaker
220/132/66/33 KV CT's
220/132/66/33 KV PT's
220/132/66/33 KV LA's
220/132/66/33 KV Isolator
Carriage of material from divisional store to loading site
220/132/66/33 KV Breaker
220/132/66/33 KV CT's
220/132/66/33 KV PT's
220/132/66/33 KV LA's
220/132/66/33 KV Isolator
Loading of material in the vechile.
220/132/66/33 KV Breaker
220/132/66/33 KV CT's
220/132/66/33 KV PT's
220/132/66/33 KV LA's
220/132/66/33 KV Isolator
Surface density/bush cutting/levelling of store premises.
Disposal of material/Mulba from the store to outside the store premises
Replacement/repairing of Street light/LED light inside store premises by way of changing street light,control cable (Complete job)
Repair of Sheds inside store premises by way of changing Tin,Angles,channels Complete job( area 10ft x 63ft X 47 ft)
Cleaning of Drainage/front area of store/Guest house during Monsoon/Rainy season
Carriage of T&P and other allied material from divisional store to site of work and back carriage of T&P.
Average Distance upto 20 Km.
Average Distance upto 80 Km.
Average Distance upto 130 Km.
NIFPS
CHECKING OF NITROGEN PRESSURE, CHECKING OPERATING AND LOCKING MECHANISM& TIGHTENING OF CONNECTIONS ETC.
CLEANING OF NIFPS OIL TANKS, PAINTING IF REQUIRED AND TIGHENING AND CHECKING OF OIL AND NITROGEN PIPES AND VALVES.
FUNCTIONAL TEST, CHECKING CONNECTIONS AND OPERATION OF TCIV VALVE.
CHECKING, TIGHTNESS OF GLANDS, LIMIT SWITCH, MOISTURE INGRESS CONTROL , ALARM TEST ETC.
DRAINAGE
CLEANING AND REMOVAL OF SLUDGE FROM SUM PITS.
CHECKING OF 2 HP 3- PHASE DRAIN MOTOR CONNECTIONS AND OTHER PUMBING ACCESSORIES LIKE GI PIPES , CHECK VALVES ETC , ENSURING PROPER WATER EVACUATION.
REWINDING OF 2HP 3-PHASE MOTOR.
CHECKING OF 0.5 HP SINGLE-PHASE DRAIN MOTOR CONNECTIONS AND OTHER PUMBING ACCESSORIES LIKE GI PIPES , CHECK VALVES ETC , ENSURING PROPER WATER.
REWINDING OF 0.5 HP SINGLE-PHASE MOTOR.
CONTROL ROOM N STAFF COLONY WATER SUPPLY.
CHECKING, OVERHAULING OF 5HP 3-PHASE INDUCTION MOTOR-PUMP SET ALONG WITH ALL PLUMBING ACCESSORIES ENSURING PROPER WATER EVACUATION IN CONTROL.
REWINDING OF DAMAGED 5HP 3-PHASE INDUCTION MOTOR
CHECKING, OVERHAULING OF 5HP 3-PHASE SUBMERISBLE INDUCTION MOTOR-PUMP SET ,TIGHTENING ALONG WITH ALL PLUMBING ACCESSORIES ENSURING PROPER WATER EVACUATION IN CONTROL ROOM AND STAFF COLONY.
REWINDING OF DAMAGED 5HP 3-PHASE INDUCTION MOTOR-PUMP SET INCLUDING LABOUR CHARGES FOR REMOVAL OF MOTOR FROM THE BOREWELL APPROX 150FT.
CHECKING, TIGHTENING OF ELECTRICAL CONNECTIONS OF 3-PHASE MOTOR STARTER AND REPLACING ANY DAMAGED/FAULTY PART.
CLEANING OF WATER SUPPLY TANKS
DG SET
ANNUAL SERVICE OF JACKSON MADE 125 KVA DG SET INCLUDING COST OF COSUMABLES LIKE FILTERS N ENGINE OIL ETC
OVER-HAULING OF JACKSON MADE 125 KVA DG SET INCLUDING COST OF CONSUMABLES LIKE FILTERS N ENGINE OIL ETC
AIR CONDITIONERS
SERVICING OF 2 TONNES HITACHI MAKE AIR CONDITIONERS ALONG WITH ANY MINOR REPAIRS IF ANY
SERVICING OF 4 TONNE HITACHI MAKE SPACE MAKER INDUSTRIAL AIR CONDITIONERS ALONG WITH ANY MINOR REPAIRS
SCADA/SUB-STATION AUTOMATION SYSTEM
CHECKING OF LAN WIRE CONNECTIONS AND REPLACING ANY DAMAGED LAN CONNECTOR/WIRE
CHECKING OF OPTICAL FIBRE CONNECTIONS AND REPLACING ANY DAMAGED OPTICAL FIBRE CONNECTOR/WIRE SPLICING
TROUBLSHOOTING ANY PROBLEMS IN SUB-STATION AUTOMATION SYSTEM/SCADA SOFTWARE GE MAKE DS AGILE BY GE ENGINEER
NEW PARAMATER INTEGERATION IN SCADA SOFTWARE GE DS AGILE BY GE ENGINEER
CHECKING AND TIGHTENING CONNECTIONS OF SCADA SERVERS ,ETHERNET SWICHES ETC
CHECKING AND TIGHTENING CONNECTIONS OF BAY CONTROL UNITS, LIUS IN SPRS
ILLUMINATION
CHECKING CONNECTIONS, REPAIR/REPLACEMENT OF 45 WATTS LED FLOOD LIGHTS AT LIGHTNING TOWERS IN THE YARD
CHECKING OF CONNECTIONS, CHANGE OF MCBS, TIMERS ETC IN LIGHTENING KIOSKS IN THE YARD
CHECKING OF CONNECTIONS, MCCBS, TRANSFORMER ETC IN ILLUMINATION PANEL/EMERGENCY PANEL IN THE CONTROL ROOM
FIRE ALARM SYSTEM
CHECKING OF CONNECTIONS AND ENSURING HEALTHINESS OF ALL ALARM ZONES IN THE FIRE ALARM SYSTEM IN CONTROL ROOM AND SPRS
ONLINE DRYOUT SYSTEM
TIGHTENING OF INLET AND OUTLET PIPE LINE CONNECTIONS, CONNECRTORS AND VALVES, CHANGE OF CARTRIDGE, VALVE OPERATIONS AND FUNCTIONS ETC.
BUS-BAR
TIGHTENING OF ALL SUPPORT CONNECTIONS, BUNDLE SEPARATORS/PGS OF QUAD-MOOSE BUS-BAR
REPAIRING MOOSE BUSBAR BY PG/REWINDING
TIGHTENING OF ALL SUPPORT CONNECTIONS, BUNDLE SEPARATORS/PGS OF TWIN-MOOSE BUS-BAR
IP CAMERA BASED SURVELLIANCE SYSTEM
CHECKING OF ALL IP CAMERA ELECTRICAL/FIBRE/LAN CONNECTIONS, HEALTHINESS OF MEDIA CONVERTERS, POWER ADAPTERS, POWER SUPPLY, CAMERAS, MOISTURE INGRESS
CHECKIN HEALTHINESS CAMERA PANEL IN CONTROL ROOM, DVR CONEECTIONS, STORAGE SYSTEM AND DISPLAY, POWER SUPPLY, MEDIA CONVERTERS ETC
Transmission line S/C and D/C 132 KV LINE :- ( Including carriage of T&P from stores and Shutdown Factor)
Checking and tightening of jumpers
Fixing of damper/vibrator on earthwire/ACSR Conductor
Replacement of damaged disc insulators
Tension string
Suspension string
Repairing of power conductor when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint, if any, rough sagging tensioning of conductor, fixing dead end assembly etc. upto span of 500/700 meter tension
Stringing and sagging of ACSR/AAAC conductor including sagging, tensioning, fitting of dead end assamblies etc.(complete job)
Repairing of ground wire when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint, if any, rough sagging tensioning of conductor, fixing dead end assembly etc. upto span of 500/700 meter tension
Stringing and saging of ground wire including sagging, tensioning, fitting of dead end assamblies etc.(complete job)
Transmission line S/C and D/C 220 KV LINE :- ( Including carriage of T&P from stores and Shutdown Factor)
Checking and tightening of jumpers
Fixing of damper/vibrator on earthwire/ACSR Conductor
Replacement of damaged disc insulators
Tension string
Suspension string
Repairing of power conductor when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint, if any, rough sagging tensioning of conductor, fixing dead end assembly etc. upto span of 500/700 meter tension
Stringing and sagging of ACSR/AAAC conductor including sagging, tensioning, fitting of dead end assamblies etc.(complete job)
Repairing of ground wire when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint, if any, rough sagging tensioning of conductor, fixing dead end assembly etc. upto span of 500/700 meter tension
Stringing and saging of ground wire including sagging, tensioning, fitting of dead end assamblies etc.(complete job)
Tower S/C and D/C 132 KV :-( Including carriage of T&P from stores and Shutdown Factor)
Foundation:- Repairing of damaged foundation and protection wall(Revetment) including back filling of earth with RCC concreating.
Provision of providing crate wall (Gabbon wall)
Tightening of nuts and bolts of tower superstructures replacement of missing ones.
a) Tower weight more than 4 tonnes to 7.5 tonnes
b) Tower weight more than 7.5 tonnes
Checking / tightening of tower footing earthing bolts and measuring tower footing resistance.
Branch cutting: under the coridor of 132 KV S/C and D/C transmission line 16 mtr and under tower structure
Replacement of missing tower members.
Reparing damaged conductor by using helical sleeve or Bolted or by shorting method with out lowering the conductor
Fixing of anti-climbing device/Bird Guard over S/C & D/C tower
Fixing of phase plates/No. plates/danger plates over S/C & D/C tower
Fixing of repair sleeves compression type for over ACSR conductor
Tower S/C and D/C 220 KV :-( Including carriage of T&P from stores and Shutdown Factor)
Foundation:- Repairing of damaged foundation and protection wall(Revetment) including back filling of earth with RCC concreating.
Provision of providing crate wall (Gabbon wall)
Tightening of nuts and bolts of tower superstructures replacement of missing ones.
a) Tower weight more than 4 tonnes to 7.5 tonnes
b) Tower weight more than 7.5 tonnes
Checking / tightening of tower footing earthing bolts and measuring tower footing resistance.
Branch cutting: under the coridor of 220 KV S/C and D/C transmission line 16 mtr and under tower structure
Replacement of missing tower members.
Reparing damaged conductor by using helical sleeve or Bolted or by shorting method with out lowering the conductor
Fixing of anti-climbing device/Bird Guard over S/C & D/C tower
Fixing of phase plates/No. plates/danger plates over S/C & D/C tower
Fixing of repair sleeves compression type for over ACSR conductor
Store handling:
Shifting of T&P Material for Transmission Line works including Four Sheaves pulley,Pulleys,Ropes,Compression machine etc in divisional stores Gladni including manual carriage within store yard from stacking site to loading/unloading site.
Shifting of T&P Material for Transmission Line works including Four Sheaves pulley,Pulleys,Ropes,Compression machine etc in divisional stores Gladni including manual carriage within store yard from loading/unloading site to stacking site.
Unloading / Loading /shifting of Cement in divisional store Gladni Including manual Carriage within store yard.
Shifting of Tower material including all accessories in divisional store Gladni Including manual Carriage within store yard from stacking site to sorting/loading site.
Shifting of Tower material including all accessories in divisional store Gladni Including manual Carriage within store yard from sorting site to stacking site.
Shifting of Disc Insulators/Fittings in divisional store Gladni Including manual Carriage within store yard from stacking site to carriage/loading site.
Making space by way of shifting material like fittings, clamps, disc insulators, conductors, control cable for the incoming material.
Shifting of Disc Insulators/Fittings in divisional store Gladni Including manual Carriage within store yard from unloading site to stacking site.
Unloading / Loading of conductor/control cable etc in divisional store Gladni Including manual Carriage within store yard.
Repair of boundary wall including brickwork/Masonary repair, Concrete repair, earthwork,Fencing,Linear work, Plastering etc.
Crane Charges including Lifting/Loading/Unloading of Power transformer/Auxillary transformer/Equipments/Materials.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
SBD.pdf
Tender Documents • 0.83 MB
BOQ_992366.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid