| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.1 LAccepted-Finance | ₹35.1 L | L1 | Accepted-Finance ok |
| 2 | L2₹35.1 L+₹1,994.20 (0.06%)Accepted-Finance | ₹35.1 L+₹1,994.20 (0.06%) | L2 | Accepted-Finance ok |
| Sl No | Description | Qty | Unit | KAMLESH ENGINEERING WORKS L1 | SUSHMA ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Dewatering/De-silting of sludge from inside portion of Clarifier No. 05 with the help of 30 HP & 10 HP sludge pump sets. Work including lowering of pump sets by making special lifting / lowering arrangement on the center of clarifier bridge. Removing & taken out the mud/ malba/ earth from the clarifier central pit by using buckets/ phawarah etc. as required by manual labours and removing of plastic/ floating material & heavy sand deposited at bottom up to the height of 6’’ to 9’’ by manual labours and disposal of the same as per direction of Engineer-in-charge. Work also includes laying of temporary electrical cables and installation of Electrical starters for operation of pumping sets and making of electrical connection from electrical source available at Filter House and taken out the pumping sets with all accessories and old material from the clarifier after completion of work and disconnecting the electric supply from the source. | 1 | JOB | 1,99,900 ₹2,35,882 Lowest | 1,99,950 ₹2,35,941 |
| 2.00 | Lifting of the bridge with the help of mechanical jacks with proper support and holding the bridge with statically balanced support this include the loading, unloading cost of packing and hiring of lifting arrangement to carry out the work, material, wooden square, T&P etc. (also making strong thrust support by welding process with deploying technical staff/ labour, T&P tool & tackles to complete the work as per site requirement. | 1 | JOB | 1,99,900 ₹2,35,882 Lowest | 1,99,950 ₹2,35,941 |
| 3.00 | Making a temporary platform along the turn table to use as a working platform around the drum so that easily movement of working staff should move around the turn table. 25 Days @ 4000/-Per day. | 1 | JOB | 99,900 ₹1,17,882 Lowest | 99,950 ₹1,17,941 |
| 4.00 | Making an arrangement for removing of drive system of turn table like top bearing block, bearing block shaft, bevel pinion also from the top of turn table (centre mechanism) & taking out this item with chain block arrangement to outside of drum at bottom of clarifier & put on safer side of clarifier. | 1 | JOB | 49,950 ₹58,941 Lowest | 49,980 ₹58,976.4 |
| 5.00 | Cutting of all tensile nut bolt of centre cage of flocculator drum. But gas cutter almost 16 nos. tensile bolt & removing of by hammering etc. as required to free hole of both turn table as well as centre cage. & top big worn gear to be lift by over head two leg lifting arrangement & lifting from the centre mechanism (turn table) & lifting with carefully in parallel way to make free from all side and with help of second chain block arrangement to keep big worn part of centre mechanism slowly-slowly with carefully to outside of drum by mean of chain block system to outside and taking it to bottom of clarifier floor with proper care. | 1 | JOB | 2,49,900 ₹2,94,882 Lowest | 2,49,950 ₹2,94,941 |
| 6.00 | Cutting of tensile bolt of almost 16 nos. with drum which is moving with main bridge with gas cutter. And same 16 nos. bolt should be remove by hammering & other mechanical arrangements so that the hole should be free from both item and lifting it with proper chain block two leg type with carefully so that it move upwards side and upto free from turn table parts. This known as middle part of turn table & with second chain block it level to outside of drum with chain block arrangement & making down upto clarifier floor level. | 1 | JOB | 2,49,900 ₹2,94,882 Lowest | 2,49,950 ₹2,94,941 |
| 7.00 | The foundation bolt of bottom part with the RCC block the removing of nut of all foundation bolt removing carefully so that the bottom part should free from foundation bolt & same is lifting with carefully upto the level which can easily removed with other chain block system to outside of drum etc. as required. All above parts should be kept in store as per instruction of engineer-in-charge may be JE(E&M) or AE(E&M) with the help of moving crane of all part kept outside of clarifier. | 1 | JOB | 2,49,900 ₹2,94,882 Lowest | 2,49,950 ₹2,94,941 |
| 8.00 | Cleaning of all CC structure with proper cotton waste & diesel with proper cleaning of complete surface free from all oil & dust etc. as required. | 1 | JOB | 24,950 ₹29,441 Lowest | 24,980 ₹29,476.4 |
| 9.00 | Opening of wooden box which is kept in deptt. side (store) open & similarly open & found all parts OK in proper condition. All parts lift one by one in proper position & lift with hydra & one by one all parts should be down in clarifier floor area. And same put of each part of centre mechanism slowly-slowly all parts should be transfer to centre of clarifier by manual heavy labour arrangement. | 1 | JOB | 1,99,900 ₹2,35,882 Lowest | 1,99,950 ₹2,35,941 |
| 10.00 | First bottom part of new centre mechanism lift with chain block arrangement from bottom floor area of clarifier upto the top of clarifier & same is fixed on foundation bolt making proper level with RCC so that bottom part should be checked properly level with all respect. And tightening of all nut to existing bolt with proper tightening of each nut. | 1 | JOB | 1,74,850 ₹2,06,323 Lowest | 1,74,950 ₹2,06,441 |
Tender Value
Refer Docs
EMD Value
₹70,500
Closing Date
3 Aug 2026, 2:30 pmClosed
EE EnM HP I
DELHI JAL BOARD GOVT OF NCT OF DELHI OFFICE OF THE EXECUTIVE ENGINEER EnM HP I HAIDERPUR WATER WORKS DELHI 110085
Repair/Renovation of fluctuator of clarifier No-05 of HDO make installed at Haiderpur Ph-I WW.
2026_DJB_295932_5
NIT NO. 04(2026-27) HP-I
Open Tender
Miscellaneous Works
Works
EE EnM HP I
Please refer tender documents
3 documents required · 3 mandatory
₹500
SAB PAISA PORTAL Ac No. 50448339804
₹70,500
11 Aug 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dewatering/De-silting of sludge from inside portion of Clarifier No. 05 with the help of 30 HP & 10 HP sludge pump sets. Work including lowering of pump sets by making special lifting / lowering arrangement on the center of clarifier bridge. Removing & taken out the mud/ malba/ earth from the clarifier central pit by using buckets/ phawarah etc. as required by manual labours and removing of plastic/ floating material & heavy sand deposited at bottom up to the height of 6’’ to 9’’ by manual labours and disposal of the same as per direction of Engineer-in-charge. Work also includes laying of temporary electrical cables and installation of Electrical starters for operation of pumping sets and making of electrical connection from electrical source available at Filter House and taken out the pumping sets with all accessories and old material from the clarifier after completion of work and disconnecting the electric supply from the source. | 1 | JOB | - | - |
| 2 | Lifting of the bridge with the help of mechanical jacks with proper support and holding the bridge with statically balanced support this include the loading, unloading cost of packing and hiring of lifting arrangement to carry out the work, material, wooden square, T&P etc. (also making strong thrust support by welding process with deploying technical staff/ labour, T&P tool & tackles to complete the work as per site requirement. | 1 | JOB | - | - |
| 3 | Making a temporary platform along the turn table to use as a working platform around the drum so that easily movement of working staff should move around the turn table. 25 Days @ 4000/-Per day. | 1 | JOB | - | - |
| 4 | Making an arrangement for removing of drive system of turn table like top bearing block, bearing block shaft, bevel pinion also from the top of turn table (centre mechanism) & taking out this item with chain block arrangement to outside of drum at bottom of clarifier & put on safer side of clarifier. | 1 | JOB | - | - |
| 5 | Cutting of all tensile nut bolt of centre cage of flocculator drum. But gas cutter almost 16 nos. tensile bolt & removing of by hammering etc. as required to free hole of both turn table as well as centre cage. & top big worn gear to be lift by over head two leg lifting arrangement & lifting from the centre mechanism (turn table) & lifting with carefully in parallel way to make free from all side and with help of second chain block arrangement to keep big worn part of centre mechanism slowly-slowly with carefully to outside of drum by mean of chain block system to outside and taking it to bottom of clarifier floor with proper care. | 1 | JOB | - | - |
| 6 | Cutting of tensile bolt of almost 16 nos. with drum which is moving with main bridge with gas cutter. And same 16 nos. bolt should be remove by hammering & other mechanical arrangements so that the hole should be free from both item and lifting it with proper chain block two leg type with carefully so that it move upwards side and upto free from turn table parts. This known as middle part of turn table & with second chain block it level to outside of drum with chain block arrangement & making down upto clarifier floor level. | 1 | JOB | - | - |
| 7 | The foundation bolt of bottom part with the RCC block the removing of nut of all foundation bolt removing carefully so that the bottom part should free from foundation bolt & same is lifting with carefully upto the level which can easily removed with other chain block system to outside of drum etc. as required. All above parts should be kept in store as per instruction of engineer-in-charge may be JE(E&M) or AE(E&M) with the help of moving crane of all part kept outside of clarifier. | 1 | JOB | - | - |
| 8 | Cleaning of all CC structure with proper cotton waste & diesel with proper cleaning of complete surface free from all oil & dust etc. as required. | 1 | JOB | - | - |
| 9 | Opening of wooden box which is kept in deptt. side (store) open & similarly open & found all parts OK in proper condition. All parts lift one by one in proper position & lift with hydra & one by one all parts should be down in clarifier floor area. And same put of each part of centre mechanism slowly-slowly all parts should be transfer to centre of clarifier by manual heavy labour arrangement. | 1 | JOB | - | - |
| 10 | First bottom part of new centre mechanism lift with chain block arrangement from bottom floor area of clarifier upto the top of clarifier & same is fixed on foundation bolt making proper level with RCC so that bottom part should be checked properly level with all respect. And tightening of all nut to existing bolt with proper tightening of each nut. | 1 | JOB | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_393847.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .