| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.6 CrAccepted-AOC | ₹94.6 Cr | L1 | Accepted-AOC Quoted Lowest Rate |
| 2 | L2₹98.7 CrRejected-Finance | ₹98.7 Cr | L2 | Rejected-Finance Quoted High Rate |
| 3 | L3₹99.8 CrRejected-Finance | ₹99.8 Cr | L3 | Rejected-Finance Quoted High Rate |
| 4 | L4₹99.8 CrRejected-Finance | ₹99.8 Cr | L4 | Rejected-Finance Quoted High Rate |
| 5 | L5₹100.5 CrRejected-Finance | ₹100.5 Cr | L5 | Rejected-Finance Quoted High Rate |
Tender Value
₹103.0 Cr
EMD Value
₹2.1 Cr
Closing Date
13 Sept 2021, 6:00 pmClosed
Chief Engineer, PMC, RRWS and FMP, PHED Nagaur
Office of the Chief Engineer, PMC, RRWS and FMP, PHED Nagaur - NH-89 Nagaur-Bikaner Road, Gogelav, Distt Nagaur
Retrofitting Work for Providing Water Supply through FHTCs in 115 MH and 261 OH of Kuchaman and Nawa Blocks of District Nagaur with 10 years Operation and Maintenance after 01 year defect liability period under Jal Jeevan Mission, District Nagaur
2021_PHCJ_236292_1
NIB No. 05/2021-22
Open Tender
Civil Works - Water Works
455 days
Block Kuchaman and Nawa, Distt Nagaur
As per detailed NIB and Tender Documents enclosed.
4 documents required · 4 mandatory
₹50,000
Executive Engineer, PHED PMC Division-II Jayal
₹2.1 Cr
Yes
Nagaur
6 Jan 2022
7 Aug 2021
14 Sept 2021
7 Aug 2021
13 Sept 2021
31 Aug 2021
7 Aug 2021 - 23 Aug 2021
23 Aug 2021
Amount
Construction of RCC air valve pillar including GI pipes, flanges, bend, MS clamps, rubber sheet, nut bolts/jointing materials etc in M-20 grade cement concrete of 2m height from Natural Ground Level in required shape and size as per approved drawing in all types of soils/rock disposing of surplus excavated materials within a lead of 50 m as per approved drawing complete including all charges at appropriate location in pipeline as per specification mentioned in the scope of work and as per direction of Engineer In Charge. G.I pipes and fittings of dia.
MSITC of Battery Operated Ultrasonic Flow Meter Application: Clear water Electronics Transmitter: Field Mount Weather Proof IP67 Number of Paths: Single Power Supply: Battery Operated MOC Electronics Enclosure: Aluminium Die Cast Electrical Connection: M20 *1.5 F Communication Output: GSM (Per day 1 SMS for 2 Mob. No.) Process Pressure Calibration Range: 10 Kg Spool Piece: With Spool Piece Electronics: Remote with 10 Mtr cable Flow Tube Protection Class: IP 68 Process Connection: Flanged Material of construction - Flange: MS Flange Standard and Rating: ANSI 150 B16.5 Material of construction - Flow Tube: SS 304 Material of construction - Sensor: SS 304 Insertion Flow Sensor Installation: Fixed Inline Pressure Sensor: 10 Kg Accuracy: ± 0.5% of F.S. Low Battery indication: Provided including all materials and making connection with existing pipeline required for Ultrasonic Flow Meter including cutting the existing pipeline etc. complete in all respect as per technical specification and as per direction of Engineer In-Charge.
150 mm dia
200 mm dia
250 mm dia
Construction of Village Transfer Chambers
Construction of RCC valve chamber for different type of valves including earthwork excavation, 100mm PCC M10 (1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) as leveling course, RCC M20 grade (1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20mm nominal size) for base slab, side wall & cover slab all 125mm thick with C.I. surface box with hinged cover 100x100x75mm (deep), including cost of steel reinforcement not less than 80kg per cum CC, form work, proper curing of concrete work complete in all respect as per standard specifications and drawings and as directed by Engineer.
60cm x 60cm x 75cm (depth) for 80/100/125/150 mm dia valve
90cm x 90cm x 100cm (depth) for 200/250/300 mm dia valve
Extension Spindles for Gate Valves -600 mm for Water Supply System including surface box for service connection valves as per the approval of Engineer In Charge
Surface Box for Extension Spindle
Glycerine filled pressure gauges (0-10 kg)
Provision for National Highway/State Highway Crossing for Rising Main/ Cluster Distribution/Village Distribution by Trenchless Technology including charges to be deposited to concerned authorities at 14 locations
Provision for replacement of Impeller from 512mm to 549mm is proposed as per charactorstic curves of existing Mather+Plate (Wilo) make pumping set Modal No. SCP-400-550-HA at BUDSU Pump House . (1W+1S) Make:- M/s Mather+Platt
Providing, installation, testing, trial run and commissioning of the following, as per the specifications
Providing, installation, testing and commissioning of soft starters, for each pump-set, complete in all respect as per the scope of work & specifications. (Total new pumping set to be instaled are (2W+2S) & ((82+206)288*2) KW
Providing, installation, testing and commissioning of MCC with panels housing motor starters relays, MCB/MCCBs, bus-bar for all pump sets including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications .
Providing, installation, testing and commissioning of capacitor control panels, housing power factor control system panel/capacitors (APFC Panel), other accessaries including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications.
MS discharge pipes with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc.-
300 mm dia 6mm thk
MS common Delivery Pipes (manifold) with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc. -
300 mm dia 6mm thk
Construction of Flow meter chamber
Provision for removing and installation of new pumpset and impeller in the existing pump set
Pumps for Rising Main
Providing, installation, testing, trial run and commissioning of the following, as per specifications
Providing and fixing at site with necessary packing, Horizontal Centrifugal Split Casting pumps with 4 pole induction motor operating at syncronised speed of speed 1500 RPM as per IS 12615: 2011 or amended up to date , CI casing and casing ring, SS 316 impeller, SS 410 Shaft and shaft sleeve, coupling guard, common base plate, foundation bolts, Cement concrete foundation etc. complete with all respect as per the specification and scope of work and direction of Engineer in Charge of following range of duty conditions. Note: Duty condition of required pump shall also be mentioned in BoQ.
GHATWA & MANJI KI DHNAI PRO. OHSR route 18 LPS / 75 m head/30 KW (1W+1S)
NALOT & GAGWADA PRO OHSR route 8 LPS / 75 m head/12 KW (1W+1S)
KUKANWALI EX. & PRO, HARITPYURA PRO, KANKARIYA & INDALI OHSR route 26 LPS / 110 m head/54 KW (1W+1S)
CHITAWA EX. & PRO. OHSR route 12 LPS / 50 m head/12 KW (1W+1S)
CHHAPRI PRO, SHIVPURVI EX. & PRO, SABALPURA & CHANDPURA PRO OHSR route 19 LPS / 75 m head/26 KW (1W+1S)
RASAL, TORDA PRO & RANASAR PRO OHSR route 17 LPS / 55 m head/17 KW (1W+1S)
TRISINGIYA, SARGOT PADAMPURA, LICHANA EX. & PRO. & SHREE NAGAR PRO. OHSR route 19 LPS / 75 m head/26 KW (1W+1S)
Provision for replacement of Impeller from 288mm to 356mm is proposed as per charactorstic curves of existing Kirloskar make pumping set modal No. DSM 80/36/2 (1W+1S) at Rooppura (Kuchaman Pump House)
Providing, installation, testing and commissioning of soft starters, for each pump-set, complete in all respect as per the scope of work & specifications. (Total new pumping set to be installed are (4W+4S)
Providing, installation, testing and commissioning of MCC with panels housing motor starters relays, MCB/MCCBs, bus-bar for all pump sets including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications .
Providing, installation, testing and commissioning of capacitor control panels, housing power factor control system panel/capacitors (APFC Panel), other accessaries including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications.
MS suction pipes with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc.-6mm thk
100 mm dia 6mm thk
MS discharge pipes with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc.- ( for Nalot & Gagawada)
100 mm dia 6mm thk
MS common Delivery Pipes (manifold) with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc. -
100 mm dia 6mm thk
Construction of Flow meter chamber
Provision for disconnecting the existing pumps and fixing new pumps
Provision for removing and refixing of impeller in the existing pump set
Online Booster
Providing, installation, testing, trial run and commissioning of the following, as per specifications
Centrifugal HSC Pumps & motor all other accessories of following duty conditions in Following locations
ASPURA / 24 m head/3 KW (1W+1S)
PANWARI / 10 m head/1 KW (1W+1S)
HARIPURA / 10 m head/3 KW (1W+1S)
NAGWARA / 16 m head/4.5 KW (1W+1S)
DOLATPURA / 10 m head/0.5 KW (1W+1S)
CHARNAWAS / 18 m head/1 KW (1W+1S)
KHORANDI / 15 m head/2 KW (1W+1S)
PREMPURA / 11 m head/1 KW (1W+1S)
JASAWANT PURA / 4 m head/0.25 KW (1W+1S)
G.I. discharge pipes with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc.-
50 mm dia
80 mm dia
G.I. common Delivery Pipes (manifold) with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc. -
50 mm dia
80 mm dia
Providing, lowering, aligning, fixing in position Brass full way valve with C.I. wheel (screwed end)
50 mm dia
80 mm dia
Providing, lowering, aligning, fixing in position Gunmetal non-return valve-horizontal (screwed end)
50 mm dia
80 mm dia
Add miscellaneous item for GI pipe fittings
Provision for interconnection and fixing new pumps
Provision for PLC-SCADA System @1.5% of project cost
Provision for O&M for Ten years
Bidder Name
Amount
GEO MILLER AND CO PVT LTD(GSTN-08AABCG7777Q1ZO)
M/s. Goodwill Advance Construction Co. Pvt. Ltd.(GSTN-08AADCG4121G1ZZ)
DARA ENGINEERING AND INFRASTRUCTURES PVT LTD(GSTN-08AAGCD8130P1Z7)
OFFSHORE INFRASTRUCTURES LTD (GSTN-08AAACO1012F1Z4)
VISHNU PRAKASH R PUNGLIA LTD(GSTN-08AAECV4526D1ZG)
M/s DEVENDRA CONSTRUCTION CO.(GSTN-08ABUPV2765L1ZL)
Unipro Techno Infrastructure Pvt Ltd(GSTN-08AABCU1732D1ZQ)
GCKC Projects and Works Pvt. Ltd.(GSTN-08AADCG4669D1ZK)
Zuberi Engineering Construction Private Limited(GSTN-NA)
Urban Infraprojects Private Limited(GSTN-NA)
Jainco Buildcon Private Limited(GSTN-NA)
Description of Work / Item(s)
ABSTRACT OF QUAOTED RATES
TOTAL SUM OF RATE QUAOTED IN BOQ-1
TOTAL SUM OF RATE QUAOTED IN BOQ-2
OFFSHORE INFRASTRUCTURES LTD
GCKC Projects and Works Pvt. Ltd.
Zuberi Engineering Construction Private Limited
GEO MILLER AND CO PVT LTD
M/s DEVENDRA CONSTRUCTION CO.
VISHNU PRAKASH R PUNGLIA LTD
M/s. Goodwill Advance Construction Co. Pvt. Ltd.
DARA ENGINEERING AND INFRASTRUCTURES PVT LTD
Unipro Techno Infrastructure Pvt Ltd
Jainco Buildcon Private Limited
Zuberi Engineering Construction Private Limited
M/s. Goodwill Advance Construction Co. Pvt. Ltd.
GEO MILLER AND CO PVT LTD
Urban Infraprojects Private Limited
Unipro Techno Infrastructure Pvt Ltd
M/s DEVENDRA CONSTRUCTION CO.
VISHNU PRAKASH R PUNGLIA LTD
DARA ENGINEERING AND INFRASTRUCTURES PVT LTD
Jainco Buildcon Private Limited
GCKC Projects and Works Pvt. Ltd.
Zuberi Engineering Construction Private Limited
Urban Infraprojects Private Limited
GEO MILLER AND CO PVT LTD
M/s. Goodwill Advance Construction Co. Pvt. Ltd.
Unipro Techno Infrastructure Pvt Ltd
M/s DEVENDRA CONSTRUCTION CO.
VISHNU PRAKASH R PUNGLIA LTD
DARA ENGINEERING AND INFRASTRUCTURES PVT LTD
GCKC Projects and Works Pvt. Ltd.
Jainco Buildcon Private Limited
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid