Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | ₹8.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹8.3 L+₹1,005.40 (0.12%)Rejected-AOC | ₹8.3 L+₹1,005.40 (0.12%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | YAMUNA INFRA L2 | S.P BUILDERS L1 |
|---|---|---|---|---|---|
| 1.00 | Desilting the existing drain etc complete as per direction of departmental officers. | 12 | M3 | 106 ₹1,272 | 105 ₹1,260 Lowest |
| 2.00 | Dismantling the existing damaged Reinforced Cement Concerete slab etc., complete direction of departmental officers. | 9 | M3 | 3,615 ₹32,535 | 3,614 ₹32,526 Lowest |
| 3.00 | Dismantling the existing damaged Cement Concerete wall etc., complete direction of departmental officers. | 24 | M3 | 536 ₹12,864 | 535 ₹12,840 Lowest |
| 4.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 83 | M3 | 182 ₹15,106 | 180 ₹14,940 Lowest |
| 5.00 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 20 | M3 | 5,591 ₹1,11,820 | 5,590 ₹1,11,800 Lowest |
| 6.00Centering with steel centering for revertment, drain and culvert upto 1.20m depth etc., complete | |||||
| 6.01 | Drain | 443 | M2 | 481 ₹2,13,083 | 480 ₹2,12,640 Lowest |
| 6.02 | Slab bottom | 6 | M2 | 1,287 ₹7,722 | 1,285 ₹7,710 Lowest |
| 7.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work xcluding centering, but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 58 | M3 | 6,312 ₹3,66,096 | 6,310 ₹3,65,980 Lowest |
| 8.00 | Plastering with cement mortar 1:5(one cement and five sand) 12mm thick in all floors complying with standard specifications. | 84 | M2 | 293 ₹24,612 | 292 ₹24,528 Lowest |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
16 Oct 2025, 3:00 pmClosed
Assistant Commisssioner,West Zone
West Zone, Coimbatore Corporation
Reconstruction of Storm Water Drain at Anna Nagar Housing Unit in Ward no 40 of West Zone
2025_MAWS_611814_18
E5/West Zone/2025
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹10,000
8 Apr 2026
7 Oct 2025
17 Oct 2025
8 Oct 2025
16 Oct 2025
8 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.24 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_731524.xls
BOQ • 0.26 MB
SWD.pdf
Tender Documents • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .