Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC 104 SARAT GHOSH GARD EN ROAD CAL 31 700031 | KOLKATA | WEST BENGAL | 700031 | ₹4.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.4 LRejected-Finance 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹4.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹4.4 LRejected-Finance NATUNDANGA BANAGRAM BARDHAMAN 713381 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713381 | ₹4.4 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | MAZUMDER ELECTRICAL L2 | ENERGY ENGINEERING L3 | D.P. ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00Repairing & Rewinding 110 KW, 550v, 3ph 1475 RPM Kirloskar make motor . (Inclusive of EPF/CMPF) | ||||||
| 1.01 | Cost of copper superanamel wire(Material Cost) | 120 | Kgs | 508 ₹60,960 | 510 ₹61,200 | 500 ₹60,000 |
| 1.02 | Cost of insulation require against copper (25% of copper cost) (Material Cost) | 1 | Nos | 15,234 ₹15,234 | 15,300 ₹15,300 | 15,000 ₹15,000 |
| 1.03 | Labour cost for insulation(20% of copper cost) | 1 | Nos | 12,187 ₹12,187 | 12,240 ₹12,240 | 12,000 ₹12,000 |
| 1.04 | Cost of striping Motor damaged copper conductor (15% of copper cost)(Material Cost) | 1 | Nos | 9,140 ₹9,140 | 9,180 ₹9,180 | 9,000 ₹9,000 |
| 1.05 | Cost of winding of motor (20% of copper cost)(Labour Cost) | 1 | Nos | 12,187 ₹12,187 | 12,240 ₹12,240 | 12,000 ₹12,000 |
| 1.06 | Miscellaneous cost (15% of copper cost)(Material Cost) | 1 | Nos | 9,140 ₹9,140 | 9,180 ₹9,180 | 9,000 ₹9,000 |
| 1.07 | Supply and fitting of of N321 no Bearing(material cost) | 1 | Nos | 23,572 ₹23,572 | 23,674 ₹23,674 | 23,210 ₹23,210 |
| 1.08 | Supply and fitting of of N321 no Bearing(Labour Cost) | 1 | Nos | 1,523 ₹1,523 | 1,530 ₹1,530 | 1,500 ₹1,500 |
| 1.09 | Supply and Fitting of 6321 no Bearing(Material Cost) | 1 | Nos | 5,865 ₹5,865 | 5,891 ₹5,891 | 5,775 ₹5,775 |
Tender Value
₹4.3 L
EMD Value
₹5,400
Closing Date
24 Feb 2026, 6:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Complete Repairing of 110KW,550V,3ph,1475RPM Kirloskar make Motor, 90KW,550V, 3ph,1485RPM induction Motor, 15HP,550V,3ph,965RPM Bharat Bijali make motor, 2.5KVA,550V/440V drill Panel and 5.5KW,415V,3ph,2900RPM KE make Motor under Khottadih Colliery
2026_ECL_353185_1
GM-PND/EandM/25-26/279/1577 dated 11/02/2026
Open Tender
Electrical and Maintenance Works
30 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,400
24 Mar 2026
14 Feb 2026
25 Feb 2026
14 Feb 2026
24 Feb 2026
14 Feb 2026
14 Feb 2026 - 17 Feb 2026
Repairing & Rewinding 110 KW, 550v, 3ph 1475 RPM Kirloskar make motor . (Inclusive of EPF/CMPF)
Cost of copper superanamel wire(Material Cost)
Cost of insulation require against copper (25% of copper cost) (Material Cost)
Labour cost for insulation(20% of copper cost)
Cost of striping Motor damaged copper conductor (15% of copper cost)(Material Cost)
Cost of winding of motor (20% of copper cost)(Labour Cost)
Miscellaneous cost (15% of copper cost)(Material Cost)
Supply and fitting of of N321 no Bearing(material cost)
Supply and fitting of of N321 no Bearing(Labour Cost)
Supply and Fitting of 6321 no Bearing(Material Cost)
Supply and Fitting of 6321 no Bearing(Labour Cost)
Less Scrap Value
OH & Profit @10%
Transportation charge (Up & Down)
Repairing & rewinding of 90KW/120HP, 550v 3ph, 1485 RPM Marathan Make Induction Motor Sl. 115625120001. (Inclusive of EPF/CMPF)
Cost of copper superenamel wire(Part - A - Stator)
Cost of insulation require against copper (25% of copper cost)(Part - A - Stator)
Labour cost fro insulation (20% of copper cost)(Part - A - Stator)
Cost of striping motor damaged copper conductor (20% of copper Cost)(Part - A - Stator)
Cost of winding of motor (20% of copper cost)(Part - A - Stator)
Miscellaneous cost (15% of copper cost)(Part - A - Stator)
Supply and fitting of N317 no bearing(Part - A - Stator)
Supply and fitting of 6317 no bearing(Part - A - Stator)
Less Scrap Value(Part - A - Stator)
Removal of Rotor Bar From Slot(Part - B - Rotor)
Cost of Electrolyte copper bar (Part - B - Rotor)
Copper bar machning as per slot diamension(Part - B - Rotor)
Inserting new Copper bar into slot(Part - B - Rotor)
Repairing of bearing journal at rotor shaft(Part - B - Rotor)
Cost of repairing of rotor ring and its re-conection(Part - B - Rotor)
Less Scrap Value(Part - B - Rotor)
OH & Profit @ 10%
Transpotation & Handling charge
Repairing of 2.5 KVA 550v/440v Prabhu Make Drill Panel. (Inclusive of EPF/CMPF)
Compelete repairing of transformer coil
Supply & fitting of Terminal insulator
Supply & fitting of Contractor Unit
Supply & fitting of Thermal Overload
Supply and fitting of earth leakage
Supply 7 fit of terminal overload
Supply & fixing of Fuse with carrier
Supply and fixing of Lamp holder
Supply and fixing of wiring wire
Supply and fixing of isolator
Repairing cost
OH & Profit @10%
Repairing & rewinding of 15 HP, 550v, 3ph 965 RPM Bharat Bijali make MotorSl.No- M1907128. (Inclusive of EPF/CMPF)
Cost of super copper enamel wire
Cost of insulation require against copper (25% of copper cost)
Labour cost for insulation(20% of copper cost)
Cost of striping Motor damaged copper conductor (15% of copper cost)
Cost of winding of motor (20% of copper cost)
Supply, fabrication & fitting of fan
Supply, fabrication & fitting of fan cover
less scrap value on 60% on CU wire
OH & Profit @10%
Transportation charge (Up & Down)
Repairing & rewinding of 5.5 KW, 415v, 3ph 2900 RPM KE make Motor Sl.No- A2AOCG0343. (Inclusive of EPF/CMPF)
Cost of super copper enamel wire( Size - 21 no SWG)(Material Cost)
Cost of insulation require against copper (25% of copper cost) (Material Cost)
Labour cost for insulation(20% of copper cost)
Cost of striping Motor damaged copper conductor (20% of copper cost)(Material Cost)
Cost of winding of motor (20% of copper cost)(Labour Cost)
Miscellaneous cost (20% of cost of copper)(Material Cost)
Less Scrap Value
OH & Profit @10%
Transportation charge (Up & Down)
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_365970.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid