Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.2 LAccepted-AOC NH 17 MAIN ROAD BINAGA BAZAR KARWAR 581307 | KARWAR | UTTARA KANNADA | KARNATAKA | 581307 | L1 | Accepted-AOC ACCEPTANCE | |
| 2 | L2₹62.9 L+₹1.7 L (2.72%)Rejected-Finance SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | L2 | Rejected-Finance HIGHER BIDDER | |
| 3 | L3₹65.6 L+₹4.3 L (7.08%)Rejected-Finance BLOCK C 14 GROUND FLOOR PLOT 618 624 BHIVANDIWALA TERRACE JAGANNATH SHANKARSHETH MARG DHOBI TALAO NEAR KALBADEVI POST OFFICE MUMBAI 400002 | MUMBAI | MAHARASHTRA | 400002 | L3 | Rejected-Finance HIGHER BIDDER | |
| 4 | L4₹70.8 L+₹9.5 L (15.6%)Rejected-Finance | L4 | Rejected-Finance HIGHER BIDDER | |
| 5 | L5₹75.0 L+₹13.8 L (22.5%)Rejected-Finance | L5 | Rejected-Finance HIGHER BIDDER |
Tender Value
₹66.0 L
EMD Value
₹1.2 L
Closing Date
19 Apr 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
COL BHUPINDER SINGH CWE NAVY VASCO
CWE NAVY VASCO VASCO DA GAMA GOA 403802
MANNING AND OPERATION OF DISTRIBUTION DSS 5 DSS 5A DSS 12 JETTY COPE POINT AT NSRY LIFTS AT HQ KNA NSRY NOM MESS PATANJALI NAVAL BASE KARWAR UNDER GE (SB) KARWAR
2024_MES_646630_1
85772/E8
Open Tender
Civil Works
Item Rate
334 days
CWE NAVY VASCO
AS PER TENDER DOC
9 documents required · 9 mandatory
₹1,000
GE (SB) KARWAR
₹1.2 L
Yes
24 May 2024
15 Mar 2024
22 Apr 2024
15 Mar 2024
19 Apr 2024
5 Apr 2024
Amount
Manning and Operation of Distribution Sub Station (DSS - 5, DSS 5A, DSS12 & Jetty cope points), 11 KV HT supply system for 03 (three) shifts of 8 hours each on all days including Sundays and holidays by employingTwo Nos skilled electrician /operator per shift and Two Nos SSK/Helper per shift, including routine preventive maintenance / checks, attending emergency breakdowns at Distribution Sub Stations DSS 5, DSS 5A, DSS 12 & jetty cope point and connected feeder pillars all as directed by Engineer-in-Charge.
1.DSS 5 - Installation comprise of following equipments :- (a) 2000 KVA cast dry resin type 11/0.380-0.415 KV Dyn 11 with IP 23 enclousure Transformer make Voltamp- 08 Nos & 800 KVA cast dry resin type 11/0.400-0.400 KV- 01 Nos. (b)11KV Ring main unit 630 Amps and 200 A SF6 type circuit breaker, Make- Merlin/Schneider/ABB - 05 Nos. (c) DC Hind rectifier-03 Nos. (d) LT Switch gears (e) HT & LT Panels. (f) UPS 2x 3 KVA micro processor based-01 No. (g) LT Distribution Boards- 10 Nos 2. DSS 5A - Installation comprise of following equipments :- (a) 3500 KVA cast dry type 11/0.380-0.415 KV with OLTC, IP 23 enclousure Transformer make Voltamp-02 Nos. (b) 11 KV, 630 Amps SF6 Type circuit breaker, make- schneider-02 Nos. (c) 500 Amps Air circuit breaker- 05 Nos.
3. DSS 12 - Installation comprise of following equipments :- (a) 500 KVA cast dry resin type 11/0.415 KV with IP 23 enclousure Transformer make Voltamp-01 No (b)11KV, 630 Amps VCB type circuit breaker, Make- CG - 01 Nos. (c) 11KV, 630 Amps VCB type circuit breaker, Make- ABB - 07 Nos. (d) 800 Amps LV/LT Switch gear-01 No. (e) APFC Panel 250 KVAR, Make- M/s Tekin control system-01 No. 4. JETTY COPE POINT - Installation comprise of following equipments:- (a) Industrial cope points- 90 Nos (b) Domestic Socket outlet points- 48 Nos (c) Various type of LT cables connected from DSS- 5 & 5A, DSS12.
NOTES for Item No 1:- (a) Contractor has to employ Two Nos skilled electrician /operator per shift having minimum ITI qualification in Electrician trade from Govt recognized institute with adequate knowledge with minimum 2 years experience in Maintenance & Operation of HT & LT electrical installation in each shift of 8 hrs (total 03 shift per day) and Two Nos SSK/Helper per shift having minimum 10th pass certificate with adequate knowledge experience in each shift of 8 hrs (total 03 shift per day). The operator must be competent to carryout the routine maintanence and attending breakdowns all equipments at DSS 5. DSS 5A, DSS1 2 & Jetty cope point, calibration and setting all the relays and handle the equipment system all as directed by Engineer-in-Charge. (b) The rate is deemend to be inclusive of maintaing necessary records and documents for operation and maint of plant specified, contractor will maintain proper records of all kind of daily, weekly, monthly, quarterly, half yearly, yearly or what so over maintenance is carried out during contract period as per forment in a binded book/register and will obtain the signature of Engineer-in-Charge.
(c) It is the responsibility of contractor to deposit the Employees Provident Fund (EPF) to the employers as per the prevailing scales as laid down by the Ministry of labour for all Electrician/operator/helper (as applicable) and necessay proof to this regard shall be submitted to GE for verification and records. The quoted rate shall be deemed to be included of above provisions. In case contractor fails to produce the proof of EPF, he shall be liable for action as deemed fit. Decision of GE in this regard shall be final and binding.(d) The rate quoted deemed to include for daily routine maintenance like checking and rectification of loose connection,cleaning of the VCBs, monitoring of the operation of relays, CTs and PTs of the VCBs and switching over of power supply from MDSS and monitoring the total load in VCB room. The contractor will ensure general area cleanlines and unkeep of the installationon daily basis. in case of failure a penalty of Rs 2000/- per installation per month will be levied and recovered from dues. (e) The contractor shall pay the wages to the electrician/ helper (as applicable) through e-payment i.e Aadhar linked bank accounts(Credit to their bank account). Engr-in-Charge shall ensure that e-payment made to electrician/ Fitter general mechanic /Valve operators and their wages shall not be less than prevailing minimum wages fixed by state Govt or central Govt whichever is more. Monthly e-banking statement shall be furnished by the contractor to the Engineer-in-Charge and the same shall be kept in record duly verified.
(f) The contracotr shall maintain all the registers under various labour law rules, 2017 and shall be produced to GE and as well as officers detailed by labour department. (g) Cost of routine maintenance spares will be measured and paid separately under respective item here in after. However cost of labour is deemed to be included in the unit rate quoted above. (h) The Contractor shall not employ same tradesman continuously for more than 11 months during the Contract period of 11 months. (j) In case of failure due to absence of operative staff, the contractor shall be liable to pay compensation at twice the cost of a day’s Manning & Operation derived from pro rata rate of Sch ‘A’ quoted rates. (k) The contractor shall provide 02 uniforms to each operator & helper and design of uniform shall be got approved from Engineer-in-charge. In case contractor fails to provide the uniform, recovery @ of Rs 1200/- per uniform will be recovered. (l) The rate quoted shall deemed to be inclusive of safety gear & required tools for minor maintenance. In case of failure to provide tools kit & safety kit (Gum boots-02 pairs, hand gloves), a penalty of Rs 5000/- will be recovered and levied.
(m) Contractor shall provide necessary tools (i.e Testing tools, multi meter, spanner set, various cutting pliers, HT megger, earth tester, HT gloves etc.) should be provided and produced to Engineer-in-Charge during the contract period. (n) One no of electrician and One number helper (Per shift) will look after DSS-05 in three shifts of 8 hours. (o) One no of electrician and One number helper (Per shift) will look after DSS 5A & DSS- 12 in three shifts of 8 hours.
NOTE:- (a) The Contractor shall not employ same tradesman continuously for more than 11 months. (b) The contractor shall provide 02 uniforms to each operator & helper and design of uniform shall be got approved from Engineer-in-charge. In case contractor fails to provide the uniform, recovery @ of Rs 2000/- per uniform will be recovered (c) The rate quoted shall deemed to be inclusive of safety gear & required tools for minor maintenance. In case of failure to provide tools kit & safety kit (Gum boots-02 pairs) a penalty of Rs 5000/- will be recovered and levied
(d)The Contractor shall maintain proper records of all kinds of daily, weekly, monthly, quarterly, half yearly and yearly or whatsoever maint is carried out during contract period in a binded book / register and shall obtain the signature of Engineer-in-Charge every fortnightly. (e) each shift duration shall be 08 hours & duty timing will be decided by engr-in-charge (f) In case of failure due to absence of operative staff,the contractor shall be liable to pay compensation at twice the cost of a day's Manning & operation derived from pro rata rate of Sch'A' quoted rates. (g)The operator/helper will ensure general area cleanliness and upkeep of the lift on daily basis. (h) The operator is responsible for daily routine check of equipments at lift room and monitoring of serviceability of lift drive and motor for lift operation.
(j) It is responsibility of contractor to deposit the employees provident fund (EPF) to the employers as per the prevailing scales as laid down by the Ministry of labour for all operator/helper (as applicable) and necessay proof to this regard shall be submitted to GE for verification and records. The quoted rate shall be deemed to be included of above provisions. In case contractor fails to produce the proof of EPF, shall be liable for action as deemed fit. Decision of GE in this regard shall be final and binding. (k) The contractor shall pay the wages to the operators/helpers (as applicable) through e payment i.e Aadhar linked bank accounts(Credit to their bank account). Engr-in-Charge shall ensure that e-payment made to operator/helper and their wages shall not be less than minimum wages fixed by state Govt or central Govt whichever is more. Monthly e-banking statement shall be furnished by the contractor to the Engineer-in-Charge and the same shall be kept in record duly verified.
M&L for Inspector of lifts through authoriesd officer/inspector of lift certified from Dept. of factories, Health and Safety, karnataka for worthiness certificate during the currency of contract including load testing as per lift ACT and submitting the worthiness certificate to Engineer-in-Charge all as specified and as directed Location : HQKNA-02 Nos,NSRY -02Nos,PATANJALI - 04 Nos, NOM - 01 Nos Total Lifts - 09 Nos Note:- All lifts will be inspected once in six months period by the competent person recognized under Department of Factories, Health & Safety, and copy of Certificate should be displayed on each lift.
Shree Ayyappa Engineering
AGRAWAL ASSOCIATES
HARSHITA MARINE SERVICES
Gayatri enterprises
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .