| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹20.9 LAccepted-AOC NA | PALWAL | HARYANA | 121004 | 1 | Accepted-AOC L1 | |
| 2 | 2₹21.4 L+₹58,875 (2.82%)Rejected-AOC 575 TOHANA 125120 | TOHANA | FATEHABAD | HARYANA | 125120 | 2 | Rejected-AOC L2 | |
| 3 | 3₹23.0 L+₹2.1 L (10.1%)Rejected-AOC SHIVAM COMPLEX RATIA ROAD TOHANA 125120 | FATEHABAD | HARYANA | 125120 | 3 | Rejected-AOC L3 | |
| 4 | 4₹24.8 L+₹3.9 L (18.9%)Rejected-AOC | 4 | Rejected-AOC L4 |
Tender Value
₹28.2 L
EMD Value
₹56,366
Closing Date
14 Sept 2026, 5:00 pmClosed
Pankaj Kumar
Municipal Council Tohana
Const. of CC street and widening of road with IPB from Railway underpass to
2026_HRY_545718_1
202658FDA1A3 A83D 41BA BA17 905BC45489C5274ULB
Open Tender
Civil Works
Works
180 days
Tohana
2 documents required · 2 mandatory
₹2,500
₹56,366
Yes
9 Oct 2026
7 Sept 2026
15 Sept 2026
7 Sept 2026
14 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 18.63 | cum | 1,863 | ₹34,707.69 |
| 2 | [10.17]Providing and laying polythene sheet under CC M-25 in road and parking complete in all respect [Through Rate] | 1,200 | Sqm | 22 | ₹26,400 |
| 3 | [10.7]Providing and laying of conglomerate floor 50mm thick cement concrete topping 1:2:4 [Through Rate] | 279.18 | Sqm | 216 | ₹60,302.88 |
| 4 | [11.11.2]12 mm cement plaster finished with a floating coat of neat cement of mix : 2. 1:4 (1 cement: 4 fine sand) [Through Rate] | 50.4 | Sqm | 135 | ₹6,804 |
| 5 | [17.22.1]Water Bound Macadam Gr I 1. Water Bound Macadam Grading I (without screenings for low volume roads (undesignated)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate] | 180 | cum | 1,038 | ₹1,86,840 |
| 6 | [17.23.1]Water Bound Macadam Grading - II 1. Water Bound Macadam (63mm to 45 mm) Grading I with screening Type “A” (13.2 mm aggregates) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate] | 180 | cum | 1,188 | ₹2,13,840 |
| 7 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate] | 2,400 | Sqm | 7 | ₹16,800 |
| 8 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] | 1,200 | Sqm | 655 | ₹7,86,000 |
| 9 | [17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate] | 1,300 | Sqm | 26 | ₹33,800 |
| 10 | [3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [5km] | 165 | cum | 66 | ₹10,890 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_625298.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .