| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-Finance NEAR SHALAMAR ROAD JAMMU JAMMU JAMMU JAMMU KASHMIR 180001 | JAMMU | JAMMU AND KASHMIR | 180001 | L1 | Accepted-Finance L1 | |
| 2 | L2₹2.9 L+₹17,123 (6.32%)Accepted-Finance KIRAN ELECTRIC WORKS SHALIMAR ROAD JAMMU JAMMU JAMMU KASHMIR 180001 | JAMMU | JAMMU AND KASHMIR | 180001 | L2 | Accepted-Finance L2 | |
| 3 | L3₹3.3 L+₹56,286 (20.8%)Accepted-Finance | L3 | Accepted-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
6 Jul 2020, 2:00 pmClosed
Executive Engineer, EDD Leh
Office of the Executive Engineer, Electric Distribution Division Leh.
Rate Contract for Repair/Reclamation of Damaged Distribution Transformers (11KV/440V) of various Rating for the year 2020-21
2020_PDNRE_41_1
07 of 2020-21
Open Tender
Electrical Works
Works
3 days
Leh
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
Payable To SE,Power Distribution Circle Ladakh
₹60,000
24 Jul 2020
18 Jun 2020
7 Jul 2020
20 Jun 2020
6 Jul 2020
22 Jun 2020
Amount
Aluminium Coil (wire) for HV/LV winding
Copper Coil (wire) for HV/LV winding
HT Bush Rod Up to 12 MM
LT Bush Rod Up to 12 MM
LT Bush Rod above 12 MM
HT Bushing (Suitable for up to 12 MM Bush Rod)
LT Bushing (Suitable for upto 12 MM Rod)
LT Bushing (Suitable for above 12 MM Rod)
Off Load Switch (200KVA to 500KVA)
Off Load Switch (above 500KVA & upto 1MVA)
On Load Tap Changer (200KVA to 500KVA)
On Load Tap Changer (above 500KVA & upto 1MVA)
Gasket (Standard size/Grade) Up to 100 KVA
Gasket (Standard size/Grade) above 100 KVA & upto 250 KVA
Gasket (Standard size/Grade) above 250 KVA & Upto 500 KVA
Gasket (Standard size/Grade) above 500 KVA & upto 1 MVA
Sundary items like Plug, Cape, Bolt, Valve etc.
Opening/Dismentling/Rewinding of HV/LV Limb (Leg) of Damaged 25KVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms (1Job per Limb)
Opening/Dismentling/Rewinding of HV/LV Limb (Leg) of Damaged 63KVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms (1Job per Limb)
Opening/Dismentling/Rewinding of HV/LV Limb (Leg) of Damaged 100KVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms (1Job per Limb)
Opening/Dismentling/Rewinding of HV/LV Limb (Leg) of Damaged 200/250KVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms (1Job per Limb)
Opening/Dismentling/Rewinding of HV/LV Limb (Leg) of Damaged 300/400KVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms (1Job per Limb)
Opening/Dismentling/Rewinding of HV/LV Limb (Leg) of Damaged 500/630KVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms (1Job per Limb)
Opening/Dismentling/Rewinding of HV/LV Limb (Leg) of Damaged 1MVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms (1Job per Limb)
Reassembling of repaired 25 KVA Transformer by replacing/refitting of HV/LV Limbs (Legs) in proper fashion in the Transformer Tank and reassembling of Tank cover etc. Reassembling of sandry items like HT/LT Bushing, Bush rods etc. either by old one or by new one and minor repair works of welding/Bracing if required.(complete testing of Transformers after reassembling/refitting).
Reassembling of repaired 63 KVA Transformer by replacing/refitting of HV/LV Limbs (Legs) in proper fashion in the Transformer Tank and reassembling of Tank cover etc. Reassembling of sandry items like HT/LT Bushing, Bush rods etc. either by old one or by new one and minor repair works of welding/Bracing if required.(complete testing of Transformers after reassembling/refitting).
Reassembling of repaired 100 KVA Transformer by replacing/refitting of HV/LV Limbs (Legs) in proper fashion in the Transformer Tank and reassembling of Tank cover etc. Reassembling of sandry items like HT/LT Bushing, Bush rods etc. either by old one or by new one and minor repair works of welding/Bracing if required.(complete testing of Transformers after reassembling/refitting).
Reassembling of repaired 200/250 KVA Transformer by replacing/refitting of HV/LV Limbs (Legs) in proper fashion in the Transformer Tank and reassembling of Tank cover etc. Reassembling of sandry items like HT/LT Bushing, Bush rods etc. either by old one or by new one and minor repair works of welding/Bracing if required.(complete testing of Transformers after reassembling/refitting).
Reassembling of repaired 300/400 KVA Transformer by replacing/refitting of HV/LV Limbs (Legs) in proper fashion in the Transformer Tank and reassembling of Tank cover etc. Reassembling of sandry items like HT/LT Bushing, Bush rods etc. either by old one or by new one and minor repair works of welding/Bracing if required.(complete testing of Transformers after reassembling/refitting).
Reassembling of repaired 500/630 KVA Transformer by replacing/refitting of HV/LV Limbs (Legs) in proper fashion in the Transformer Tank and reassembling of Tank cover etc. Reassembling of sandry items like HT/LT Bushing, Bush rods etc. either by old one or by new one and minor repair works of welding/Bracing if required.(complete testing of Transformers after reassembling/refitting).
Reassembling of repaired 1MVA Transformer by replacing/refitting of HV/LV Limbs (Legs) in proper fashion in the Transformer Tank and reassembling of Tank cover etc. Reassembling of sandry items like HT/LT Bushing, Bush rods etc. either by old one or by new one and minor repair works of welding/Bracing if required.(complete testing of Transformers after reassembling/refitting).
Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 25KVA
Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 63KVA
Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 100KVA
Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 200/250KVA
Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 300/400KVA
Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 500/630KVA
Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 1MVA
Replacing of Damaged/wornout Off Load Switch/On Load Tap Changer Switch (200KVA to 500KVA)
Replacing of Damaged/wornout Off Load Switch/On Load Tap Changer Switch (Above 500KVA & upto 1MVA)
Minor repair like replacng of Damaged LT/HT Bush Rod , Bushing etc. & bracing/welding/Loose connection/denting if any
Welding/Bracing of Tank/Radiator/Conservator Tank etc (per 10cm)
Loading/Unloading and carriage charges of 25KVA Transformers from Divisional Store to Workshop (to & fro)
Loading/Unloading and carriage charges of 63KVA Transformers from Divisional Store to Workshop (to & fro)
Loading/Unloading and carriage charges of 100KVA Transformers from Divisional Store to Workshop (to & fro)
Loading/Unloading and carriage charges of 200/250KVA Transformers from Divisional Store to Workshop (to & fro)
Loading/Unloading and carriage charges of 300/400KVA Transformers from Divisional Store to Workshop (to & fro)
Loading/Unloading and carriage charges of 500/630KVA Transformers from Divisional Store to Workshop (to & fro)
Loading/Unloading and carriage charges of 1MVA Transformers from Divisional Store to Workshop (to & fro)
Cost of Worn out /Damaged (Scraps) of Aluminium Coil.
Cost of Worn out/Damaged (Scraps) of Copper Coil.
Cost of Worn out/Burnt out Oils.
Worn out/Damaged Sundry Items like Plug, Cape, Bolt, Valve etc.
Worn out/Damaged Sundry Items (Brass Items) like HT/LT Bush Rod etc.
kiranelectricworks
darshan kumar gandhi
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .