Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.0 LAdmitted-Finance | ₹19.0 L | L1 | Admitted-Finance |
| 2 | L2₹20.0 LAdmitted-Finance S 15 SACRED WORLD OPP SACRED HEART TOWN WANWADI PUNE 411040 | PUNE | MAHARASHTRA | 411040 | ₹20.0 L | L2 | Admitted-Finance |
| 3 | L3₹21.0 LAdmitted-Finance SOMNATH NAGAR SR NO 43 1 2 GREWAL HOUSING SOCIETY PUNE NAGAR ROAD WADGAON SHERI PUNE 411 014 | PUNE | PUNE | MAHARASHTRA | 411014 | ₹21.0 L | L3 | Admitted-Finance |
| 4 | L4₹21.6 LAdmitted-Finance AADARSH RESIDENCY LANE 06 PAWAR COLONY NEAR PMC SCHOOL VITTHAL NAGAR S NO 15 HADAPSAR PUNE | PUNE | MAHARASHTRA | 410301 | ₹21.6 L | L4 | Admitted-Finance |
| 5 | L5₹24.7 LAdmitted-Finance WZ 1391 31 B NANGAL RAYA NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | ₹24.7 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Dinesh Constructions L6 | Aadarsh Bharat Enviro Pvt Ltd L4 | Sunshine Ventures L1 | G M CONSTRUCTION COMPANY L5 | AVS CONSTRUCTION L7 | Ganesh Enterprises L3 | PAVEWAY CONSTRUCTIONS PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Repair to pot holes any depth, n exc 1 Sqm each incl sweeping free from dust and mud or water, scoring sunken surfaces in roads, paths etc. cutting edges to at least 25mm in depth, making good by applying tack coat @ 5 kg per 10 sq m, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 sq m, blinded with 0.09 cu m of stone chippings, 6.3 mm size and again well rammed (including supply of premixed macadam, binder and chippings).depth of potholes exc 30mm all as specified and directed. | 2 | 10 Sqm | 2,000 ₹4,000 | 500 ₹1,000 | 1,000 ₹2,000 | 650 ₹1,300 | 3,000 ₹6,000 | 500 ₹1,000 | 1,000 ₹2,000 |
| 2.00 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area exc 400 sqm and exceding 50 mm and in exc 100mm deep | 30 | 10 Sqm | 100 ₹3,000 | 40 ₹1,200 | 30 ₹900 | 330 ₹9,900 | 100 ₹3,000 | 50 ₹1,500 | 18 ₹540 |
| 3.00 | M & L for 7.5cm thick (compacted thickness) WBM, with coarse aggregates of granit or basalt grading 2 (63 to 40mm size) or of grading 3 (50 to 20mm size) , spread, rolled and consolidated to gradient and camber required | 30 | 10 Sqm | 3,232 ₹96,960 | 900 ₹27,000 | 1,700 ₹51,000 | 2,900 ₹87,000 | 2,500 ₹75,000 | 1,200 ₹36,000 | 1,000 ₹30,000 |
| 4.00 | M&L for preparing ;unsurfaced water bound macadam by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bitumenous primer (paving bitumen) at the rate of 10 Kg per 10 Sqm. | 30 | 10 Sqm | 1,300 ₹39,000 | 325 ₹9,750 | 200 ₹6,000 | 450 ₹13,500 | 1,200 ₹36,000 | 250 ₹7,500 | 600 ₹18,000 |
| 5.00 | M&L for premixed bituminious mecadam using paving bitumen @ 4% by weight of total mix, spread rolled and compacted to required gradient and camber for up to 75mm consolidated thickness all as specified and directed. | 65 | Cum | 8,343 ₹5,42,295 | 6,500 ₹4,22,500 | 5,900 ₹3,83,500 | 4,500 ₹2,92,500 | 7,500 ₹4,87,500 | 7,000 ₹4,55,000 | 5,000 ₹3,25,000 |
| 6.00 | M&L for preparing , unsurfaced Black top surface by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bitumenous primer (paving bitumen) at the rate of 2.50 Kg per 10 Sqm. | 460 | 10 Sqm | 500 ₹2,30,000 | 110 ₹50,600 | 200 ₹92,000 | 310 ₹1,42,600 | 400 ₹1,84,000 | 400 ₹1,84,000 | 210 ₹96,600 |
| 7.00 | Applying evenly a priming/tack coat of paving bitumen with bituminous primer at 2.5 Kg per 10 Sqm on BM surfaces | 130 | 10 Sqm | 200 ₹26,000 | 100 ₹13,000 | 175 ₹22,750 | 250 ₹32,500 | 150 ₹19,500 | 200 ₹26,000 | 200 ₹26,000 |
| 8.00 | M&L for providing bitumenous premixed semi dense asphaltic concrete 30 mm consolidated thickness with @ 5.5% Binder content by weight of total mix using VG-30 grade bitumen laid with mechanical paver rolled and compacted to reqd camber and gradient with 8 to 12 ton power roller complete all as specified. | 490 | 10 Sqm | 3,300 ₹16,17,000 | 3,200 ₹15,68,000 | 2,600 ₹12,74,000 | 3,700 ₹18,13,000 | 3,500 ₹17,15,000 | 2,700 ₹13,23,000 | 2,925 ₹14,33,250 |
| 9.00 | M&L for with approved moorum, red bajri in road side berms as light wearing surfaces 100 mm spread thickness spread, rolled and consolidated with power roller all as directed by Engineer-in-Charge | 12 | 10 Sqm | 800 ₹9,600 | 650 ₹7,800 | 900 ₹10,800 | 700 ₹8,400 | 1,200 ₹14,400 | 500 ₹6,000 | 700 ₹8,400 |
| 10.00 | M & L for Marking preparation bitumen surface of road and marking 2.5mm thick center line stop lines, dashes, arrows etc and the like n exc 10 cm wide on road payment with hot applied thermo plastic road marking paint of approved colour confirming to BS 3262-1989 with special applicator machine all as per manufacturers instruction complete all as speified and directed. | 400 | RM | 500 ₹2,00,000 | 47 ₹18,800 | 45 ₹18,000 | 52 ₹20,800 | 800 ₹3,20,000 | 50 ₹20,000 | 50 ₹20,000 |
Tender Value
₹29 L
EMD Value
₹58,000
Closing Date
22 Jun 2026, 6:00 pmClosed
Shri Vinay Kumar, IDSE, SE (SAG), CWE
HQ Commander Works Engineer (Army) 24 Assaye Building, Colaba Mumbai-400 005
REPAIR AND RESURFACING TO CERTAIN ROAD AT 29 FAD UNDER GE DEHU RAOD
2026_MES_767439_1
85317/DR/E8
Open Tender
Civil Works - Roads
90 days
Dehu Road Pune
As per NIT and tender documents
8 documents required · 8 mandatory
₹500
Yes
GE DEHU ROAD PUNE
₹58,000
Yes
3 Jul 2026
23 May 2026
24 Jun 2026
23 May 2026
22 Jun 2026
7 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repair to pot holes any depth, n exc 1 Sqm each incl sweeping free from dust and mud or water, scoring sunken surfaces in roads, paths etc. cutting edges to at least 25mm in depth, making good by applying tack coat @ 5 kg per 10 sq m, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 sq m, blinded with 0.09 cu m of stone chippings, 6.3 mm size and again well rammed (including supply of premixed macadam, binder and chippings).depth of potholes exc 30mm all as specified and directed. | 2 | 10 Sqm | - | - |
| 2 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area exc 400 sqm and exceding 50 mm and in exc 100mm deep | 30 | 10 Sqm | - | - |
| 3 | M & L for 7.5cm thick (compacted thickness) WBM, with coarse aggregates of granit or basalt grading 2 (63 to 40mm size) or of grading 3 (50 to 20mm size) , spread, rolled and consolidated to gradient and camber required | 30 | 10 Sqm | - | - |
| 4 | M&L for preparing ;unsurfaced water bound macadam by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bitumenous primer (paving bitumen) at the rate of 10 Kg per 10 Sqm. | 30 | 10 Sqm | - | - |
| 5 | M&L for premixed bituminious mecadam using paving bitumen @ 4% by weight of total mix, spread rolled and compacted to required gradient and camber for up to 75mm consolidated thickness all as specified and directed. | 65 | Cum | - | - |
| 6 | M&L for preparing , unsurfaced Black top surface by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bitumenous primer (paving bitumen) at the rate of 2.50 Kg per 10 Sqm. | 460 | 10 Sqm | - | - |
| 7 | Applying evenly a priming/tack coat of paving bitumen with bituminous primer at 2.5 Kg per 10 Sqm on BM surfaces | 130 | 10 Sqm | - | - |
| 8 | M&L for providing bitumenous premixed semi dense asphaltic concrete 30 mm consolidated thickness with @ 5.5% Binder content by weight of total mix using VG-30 grade bitumen laid with mechanical paver rolled and compacted to reqd camber and gradient with 8 to 12 ton power roller complete all as specified. | 490 | 10 Sqm | - | - |
| 9 | M&L for with approved moorum, red bajri in road side berms as light wearing surfaces 100 mm spread thickness spread, rolled and consolidated with power roller all as directed by Engineer-in-Charge | 12 | 10 Sqm | - | - |
| 10 | M & L for Marking preparation bitumen surface of road and marking 2.5mm thick center line stop lines, dashes, arrows etc and the like n exc 10 cm wide on road payment with hot applied thermo plastic road marking paint of approved colour confirming to BS 3262-1989 with special applicator machine all as per manufacturers instruction complete all as speified and directed. | 400 | RM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tenderdocuments85317.pdf
Tender Documents • 0.86 MB
BOQ_859471.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid