Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 2 TOWN HALL COMPLEX PUDUKKOTTAI 622001 | PUDUKKOTTAI | TAMIL NADU | 622001 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 25 SELVA NAYAGIPURAM SAYALKUDI ROAD SAYALKUDI RAMANATHAPURAM | RAMANATHAPURAM | TAMIL NADU | 623115 | Admitted-Finance |
| 4 | Admitted-Finance PEURAYUR KAMUTHI TALUK RAMANATHAPURAM | RAMANATHAPURAM | TAMIL NADU | 623115 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
8 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional collector(Dev), RDDA, Ramanathapuram
District Rural Development Agency, Ramanathapuram
Rejuvenation of Water Bodies in Package No.KMD-1/AGAMT 2021-22 of Kamuthi Block in Ramanathapuram District under AGAMT 2021-22
2022_RDTN_242367_1
R7/5593/2021/dated 05.07.2022 KMD-1
Open Tender
Civil Works
Item Wise
180 days
District Rural Development Agency
Refer to Tender Document
6 documents required · 6 mandatory
₹0
₹90,000
District Rural Development Agency, Ramanathapuram
9 Sept 2022
18 Jul 2022
8 Aug 2022
18 Jul 2022
8 Aug 2022
20 Jul 2022
20 Jul 2022
Amount
Deepening Of Oorani with Construction of Retaining Wall 42m, Bathing ghat at Koodakulam pallimuttai oorani in Eluvanur panchayat, Deepening Of Oorani with Construction of Retaining Wall 18m, Bathing ghat at Mustakuruchi Amman Kovil oorani in Mustakuruchi panchayat, Deepening Of Oorani with Construction of Retaining Wall 16m, Bathing ghat at Puthupatti oorani in Mustakuruchi panchayat, Deepening Of Oorani with Construction of Retaining Wall 24m, Bathing ghat at Keelaramanathi Vairavanathanpillai (A) Ayyankulam oorani in Keelaramanathi panchayat, Deepening Of Oorani with Construction of Retaining Wall 15m, Bathing ghat at Perunali Puthu Oorani (Maniarappan oorani) in Perunali panchayat. Deepening of Oorani with Construction of Bhathing Ghat at Shanmugapuram Aathavan Oorani in Perunali Panchayat. Deepening Of Oorani with Construction of Retaining Wall 38m, Bathing ghat at Karungulam Ayyanar Kovil Nallathanni Oorani in Pakkuvetti panchayat, Deepening Of Oorani with Construction of Retaining Wall 35m, Bathing ghat at Keelakakkakulam Karuppasamy Kovil Oorani in Vallanthai panchayat, Deepening Of Oorani with Construction of Retaining Wall 20m, Bathing ghat at idayankulam Oorani in idayankulam panchayat, Deepening Of Oorani with Construction of Retaining Wall 44m, Bathing ghat at Puthukottai Naval (Pottankulam) Oorani in Puthukottai panchayat, Deepening Of Oorani with Construction of Retaining Wall 16m, Bathing ghat at Mandalamanickam Muniyappasamy Koivl Oorani in Mandalamanickam panchayat, Deepening Of Oorani with Construction of Retaining Wall 8m, Bathing ghat at Mandalamanickam Karuppasamy kovil Oorani in Mandalamanickam panchayat
Deepening Of Oorani with Construction of Retaining Wall 42m, Bathing ghat at Koodakulam pallimuttai oorani in Eluvanur panchayat
Clearing the Scrub juncle in water spread area
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
CONSTRUCTION OF RETAINING WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF BATHING GHAT
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
Deepening Of Oorani with Construction of Retaining Wall 18m, Bathing ghat at Mustakuruchi Amman Kovil oorani in Mustakuruchi panchayat
Clearing the Scrub juncle in water spread area
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
CONSTRUCTION OF RETAINING WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF BATHING GHAT
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF INLET
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. (Hard Soil )
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
providing and laying of Reinforced concrete pipe NP3 Including all cost and labour charge etc complete
Deepening Of Oorani with Construction of Retaining Wall 16m, Bathing ghat at Puthupatti oorani in Mustakuruchi panchayat
Clearing the Scrub juncle in water spread area
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
CONSTRUCTION OF RETAINING WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF BATHING GHAT
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF INLET
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. (Hard Soil )
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
providing and laying of Reinforced concrete pipe NP3 Including all cost and labour charge etc complete
Deepening Of Oorani with Construction of Retaining Wall 24m, Bathing ghat at Keelaramanathi Vairavanathanpillai (A) Ayyankulam oorani in Keelaramanathi panchayat
Clearing the Scrub juncle in water spread area
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
CONSTRUCTION OF RETAINING WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF BATHING GHAT
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF INLET
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. (Hard Soil )
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
providing and laying of Reinforced concrete pipe NP3 Including all cost and labour charge etc complete
Deepening Of Oorani with Construction of Retaining Wall 15m, Bathing ghat at Perunali Puthu Oorani (Maniarappan oorani) in Perunali panchayat
Clearing the Scrub juncle in water spread area
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
CONSTRUCTION OF RETAINING WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF BATHING GHAT
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF INLET
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. (Hard Soil )
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
providing and laying of Reinforced concrete pipe NP3 Including all cost and labour charge etc complete
Deepening of Oorani with Construction of Bhathing Ghat at Shanmugapuram Aathavan Oorani in Perunali Panchayat
Clearing the Scrub juncle in water spread area
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
CONSTRUCTION OF RETAINING WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF BATHING GHAT
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
Deepening Of Oorani with Construction of Retaining Wall 38m, Bathing ghat at Karungulam Ayyanar Kovil Nallathanni Oorani in Pakkuvetti panchayat
Clearing the Scrub juncle in water spread area
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
CONSTRUCTION OF RETAINING WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF BATHING GHAT
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF INLET
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. (Hard Soil )
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
providing and laying of Reinforced concrete pipe NP3 Including all cost and labour charge etc complete
Deepening Of Oorani with Construction of Retaining Wall 35m, Bathing ghat at Keelakakkakulam Karuppasamy Kovil Oorani in Vallanthai panchayat
Clearing the Scrub juncle in water spread area
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
CONSTRUCTION OF RETAINING WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF BATHING GHAT
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF INLET
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. (Hard Soil )
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
providing and laying of Reinforced concrete pipe NP3 Including all cost and labour charge etc complete
Deepening Of Oorani with Construction of Retaining Wall 20m, Bathing ghat at idayankulam Oorani in idayankulam panchayat
Clearing the Scrub juncle in water spread area
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
CONSTRUCTION OF RETAINING WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF BATHING GHAT
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF INLET
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. (Hard Soil )
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
providing and laying of Reinforced concrete pipe NP3 Including all cost and labour charge etc complete
Deepening Of Oorani with Construction of Retaining Wall 44m, Bathing ghat at Puthukottai Naval (Pottankulam) Oorani in Puthukottai panchayat
Clearing the Scrub juncle in water spread area
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
CONSTRUCTION OF RETAINING WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF BATHING GHAT
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF INLET
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. (Hard Soil )
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
providing and laying of Reinforced concrete pipe NP3 Including all cost and labour charge etc complete
Deepening Of Oorani with Construction of Retaining Wall 16m, Bathing ghat at Mandalamanickam Muniyappasamy Kovil Oorani in Mandalamanickam panchayat
Clearing the Scrub juncle in water spread area
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
CONSTRUCTION OF RETAINING WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF BATHING GHAT
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
Deepening Of Oorani with Construction of Retaining Wall 8m, Bathing ghat at Mandalamanickam Karuppasamy kovil Oorani in Mandalamanickam panchayat
Clearing the Scrub juncle in water spread area
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
CONSTRUCTION OF RETAINING WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
CONSTRUCTION OF BATHING GHAT
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B including all
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
Plain cement concrete 1;3;6 with 40 mm metal including cost of materiyal and labour charge
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K INFRA
Velraman
RGR&CO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .