| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81,338.60Accepted-Finance | L1 | Accepted-Finance OK | |
| 2 | L2₹82,810+₹1,471.40 (1.81%)Accepted-Finance 259 ANAND VIHAR COLONY NAWADA SEKHAN PILIBHIT BYPASS ROAD BAREILLY UTTAR PRADESH 243005 | BAREILLY | UTTAR PRADESH | 243005 | L2 | Accepted-Finance OK | |
| 3 | L3₹85,850+₹4,511.40 (5.55%)Accepted-Finance | L3 | Accepted-Finance OK |
| Sl No | Description | Qty | Unit | LASHANI ENTERPRISES L1 | M/S A R K ELECTRICALS L2 | Niyazi Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00 | Following works are to be carried to be carried out on 132KV Hardoi-Asha line under ETD Hardoi with all cost of men Misc. consumables , T&Ps etc. rquired for satisfactory completion of work as per technical specifications & direction of supervising engineer : Safe Carriage of above ACSR Panther Conductor in Drums, Loaded on the Vehicle Arranged by the Contractor from various Sub-stations under ETC, Shahjahanpur to Safe Unloading Place at Existing 132KV Asha-Hardoi line (Approx. Distance 55 Km). | 55 | km | 39 ₹2,145 Lowest | 42 ₹2,310 | 45 ₹2,475 |
| 2.00 | Dismantling of all 02 phases of existing ACSR panther conductor, all Hardware fittings & conductor accessories e.g. armour rod ,vibration dampers , insulator strings etc. of existing line and re-rolling of dismantled conductor on empty drums for r-use,safely transportation of all removed material to UPPTCL stores. | 1.15 | route km | 24,371 ₹28,026.65 Lowest | 25,000 ₹28,750 | 26,500 ₹30,475 |
| 3.00 | Laying, stringing 02 No conductors, tensioning clamping, jointing etc of ACSR ‘Panther’ conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all three phases of 132 KV SC lines. | 1.15 | route km | 44,493 ₹51,166.95 Lowest | 45,000 ₹51,750 | 46,000 ₹52,900 |
Tender Value
Refer Docs
EMD Value
₹1,000
Closing Date
18 Nov 2025, 12:00 pmClosed
Executive Engineer ETD Hardoi
220KV sub station Lucknow Road Hardoi
Replacement of conductors of 132KV Hardoi-Asha line under ETD Hardoi
2025_UPTCL_1083582_2
10/ETDH/2025-26
Open Tender
Electrical Works
Fixed-rate
60 days
Hardoi
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineer ETD Hardoi
₹1,000
18 Nov 2025
13 Nov 2025
18 Nov 2025
13 Nov 2025
18 Nov 2025
13 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_2001132.xls
BOQ • 0.27 MB
TD101.pdf
Tender Documents • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .